FACILITIES ENGINEERING ELECTRICAL EXTERIOR FACILITIES

ARMY TM 5-684 NAVY NAVFAC MO-200 AIR FORCE AFJMAN 32-1082 TECHNICAL MANUAL

FACILITIES ENGINEERING ELECTRICAL EXTERIOR FACILITIES

APPROVED FOR PUBLIC RELEASE: Distribution is unlimited

DEPARTMENTS OF THE ARMY, THE NAVY, AND THE AIR FORCE 29 November 1996

TM 5-684/NAVFAC MO-200/AFJMAN 32-1082

REPRODUCTION AUTHORIZATION/RESTRICTIONS This manual has been prepared by and for the Government and, except to the extent indicated below, is public property and not subject to copyright. Copyrighted material included in the manual has been used with the knowledge and permission of the proprietors and is acknowledged as such at point of use. Anyone wishing to make further use of any copyrighted material, by itself and apart from this text, should seek necessary permission directly from the proprietors. Reprints or republication of this manual should include a credit substantially as follows: "Joint Departments of the Army, the Navy and the Air Force, TM 5-864/NAVFAC MO-200/AFJMAN 32-1082." If the reprint or republication includes copyrighted material, the credit should also state: "Anyone wishing to make further use of copyrighted material, by itself and apart from this text, should seek necessary permission directly from the proprietor." Tables 13-l and 16-1 are reprinted from table 2 of IEEE Std 18-1992 and table 11.1 of IEEE Std 519-1992 respectively. Copyright 0 1993 by the Institute of Electrical and Electronics Engineers, Inc. The IEEE disclaims any responsibility or liability resulting from the placement and use in this publication. Information is reprinted with the permission of the IEEE.

TM 5-684/NAVFAC MO-200/AFJMAN 32-1082

TECHNICAL MANUAL No. 5-684

NAVY PUBLICATION NAVFAC MO-200

AIR FORCE JOINT MANUAL No. AFJMAN 32-1082

>

HEADQUARTERS DEPARTMENTS OF THE ARMY, THE NAVY, AND THE AIR FORCE WASHINGTON , D.C. 29 November 1996

ELECTRICAL EXTERIOR FACILITIES

CHAPTER 1. INTRODUCTION SECTION I-PRIMARY CONSIDERATIONS

Purpose and scopee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Application of codes and publications. .....................................................

Standardsofmaintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Maintenance responsibilities. .............................................................

Maintenance records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Priority and scheduling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Paragraph

l-l l-2 l-3 l-4 l-5 l-6 l-7

Page

l-l l-l l-l l-l l-l l-2 l-2

SECTION II-SAFETY

Minimizinghazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

l-8

l-3

Qualification of electric workers. ..........................................................

l-9

l-3

Certification of electric workers ...........................................................

l-10

l-3

Publicsafety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

l-11

l-3

Personnel safetyy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-12

l-3

Live-linemaintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-13

l-3

SECTION III-AVOIDING PROBLEMS

Operating conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-14

l-4

Detecting potential trouble ...............................................................

1-15

l-4

Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-16

l-4

CHAPTER 2. INSPECTION AND TESTS

SECTION I-PERFORMANCE

Determining equipment condition .........................................................

2-l

2-l

Reasons for inspections and tests .........................................................

2-2

2-l

Associated test guidance and records. .....................................................

2-3

2-l

SECTION II-REQUIREMENTS

Electric workers, instruments, and reports

2-4

2-2

Frequencyofinspection.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-5

2-2

CHAPTER 3. TRANSMISSION AND DISTRIBUTION SUBSTATIONS

SECTION I-GOVERNING CONSIDERATIONS

Typeofsubstationscovered . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-l

3-l

Electrical system relationships. ...........................................................

3-2

3-l

Substation safety concerns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-3

3-l

Substation security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-4

3-l

Periodic inspections of substations ........................................................

3-5

3-l

Visual inspections of substations ..........................................................

3-6

3-l

Infrared inspections of substations ........................................................

3-7

3-l

SECTION II-STRUCTURE MAINTENANCE

Importance of maintenance..1... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-8

3-2

Galvanized steel structurse . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-9

3-2

Painted steel structures.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-10

3-3

Aluminumstructures.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-11

3-3

Wood structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-12

3-3

Concrete for structure foundations ........................................................

3-13

3-3

Structure connections and joints ..........................................................

3-14

3-3

SECTION III-SUBSTATION YARDS

Provisionofyards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-15

3-3

Fences for yards.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-16

3-3

Warningsignsatyards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-17

3-3

Substation yards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-18

3-3

This manual supersedes TM 5-684/NAVFAC MO-200/AFM 91-3, dated 20 April 1979

TM 5-684/NAVFAC MO-200/AFJMAN 32-1082

SECTION IV-INSULATORS Function of insulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Testsofinsulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Inspection and repair of insulators ........................................................

Cleaningofinsulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION V-BUS STRUCTURES Definitionofbus structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Maintenance of bus structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cleaningofbus structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Testingofbus structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION VI-INSTRUMENT TRANSFORMERS

Definitions of instrument transformers .................................................... Short-circuiting dangers. .................................................................

Maintenanceofinstrumenttransformers.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tests of instrument transformers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION VII-BUSHINGS

Definition of bushings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Type of bushings covered . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Maintenanceofbushings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bushingpowerfactortests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Bushing insulation resistance test. ........................................................

CHAPTER 4. OVERHEAD DISTRIBUTION SECTION I-ASSOCIATED OVERHEAD DISTRIBUTION GUIDANCE

Relevant overhead distribution guidance. ..................................................

General construction guidanece . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION II-DEFINING VOLTAGE NOMENCLATURE Voltage terminology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Voltagelevelclassification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Voltagedeliveryusage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Voltage origination point .................................................................. Voltage terminology usage in this manual .................................................

SECTION III-TYPES OF MAINTENANCE Componentlinemaintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other types of line maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION IV-WOOD POLES Lifespanofwoodpoles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Supplementary data on wood poles. ....................................................... Wood pole record keeping and inspections ................................................. Wood pole maintenance crew instructions. ................................................. Wood pole spot inspection procedures. ..................................................... Wood pole-by-pole inspection procedure. ................................................... Determination of wood pole adequacy .....................................................

Woodpolereplacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Woodpolereinforcement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION V-CROSSARMS, BRACES, AND PLATFORMS Polecrossarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pole braces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pole platforms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION VI-MAINTENANCE WOOD PRESERVATION Initialwoodtreatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

In-place wood treatment above ground .................................................... Wood pole treatment at or below the ground line. ..........................................

SECTION VII-METAL POLES Metalpoleusage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Distribution line metal poles .............................................................. Transmission line metal towers ...........................................................

Pole-linemetalhardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Paintingofmetalpoles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Paragraph

3-19 3-20 3-21 3-22

3-23 3-24 3-25 3-26

3-27 3-28 3-29 3-30

3-31 3-32 3-33 3-34 3-35

4-1 4-2

4-3 4-4 4-5 4-6 4-7

4-8 4-9

4-10 4-11 4-12 4-13 4-14 4-15 4-16 4-17 4-18

4-19 4-20 4-2 1

4-22 4-23 4-24

4-25 4-26 4-27 4-28 4-29

Page

3-4 3-4 3-4 3-5

3-7 3-7 3-7 3-7

3-7 3-7 3-7 3-8

3-8 3-8 3-8 3-10 3-12

4-4 4-4

4-4 4-4 4-4 4-6 4-6 4-7 4-9 4-10 4-10

4-11 4-12 4-12

4-13 4-13 4-13

4-14 4-15 4-15 4-15 4-15

ii

TM 5-684/NAVFAC MO-200/AFJMAN 32-1082

SECTION VIII-CONCRETE POLES Concrete pole overviwew . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Concrete pole foundations ................................................................

SECTION IX-OVERHEAD OPEN WIRE CONDUCTORS

Overhead conductor construction. .........................................................

Overheadconductormaterial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overhead conductor covering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overheadconductorsag . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overheadconductordamage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overheadconductorrepairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION X-OVERHEAD CABLE Overhead cable construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Overhead cable repair requirements. ......................................................

SECTION XI-CONDUCTOR CONNECTIONS

Overhead line conductor requirements. .................................................... Overhead line conductor splices. ..........................................................

Overhead line connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overheadline armor rods _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION XII-POLE-LINE INSULATORS

Pole-line insulator related material. .......................................................

Insulator operating performance.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Types of pole-line insulators... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Pole-line insulator class requirements .....................................................

SECTION XIII-GUYS Guy functional requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Guy strand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Anchor assemblies.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Guy attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Guystraininsulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION XIV-TREE TRIMMING

Tree trimming objectivses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Tree trimming clearances and climbing space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Tree trimming toosl . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Typesoftreetrimming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tree trimming instructions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Treating a tree trimming wound ..........................................................

Treeremovalmethods......, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tree killing chemicals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Poisonous planst . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION XV-LIVE-LINE MAINTENANCE

Live-line maintenance requirements. ...................................................... Categories of energized-line maintenance ..................................................

Energized-linemethods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Live-line operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION XVI-AERIAL LIFT REQUIREMENTS

Aerial lift construction ...................................................................

Aerial lift specificss . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

CHAPTER 5. UNDERGROUND AND SUBMARIK E CABLES SECTION I-ASSOCIATED GUIDANCE

Relevant cable guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

General construction guidance ............................................................

SECTION II-SAFETY PRECAUTIONS Cablesafety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Structure safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SECTION III-INSPECTION

Frequency of underground system inspections. .............................................

Structureinspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cableinspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Underground equipment inspections ......................................................

Paragraph

4-30 4-31

4-32 4-33 4-34 4-35 4-36 4-37

4-38 4-39

4-40 4-41 4-42 4-43

4-44 4-45 4-46 4-47

4-48 4-49 4-50 4-51 4-52

4-53 4-54 4-55 4-56 4-57 4-58 4-59 4-60 4-61

4-62 4-63 4-64 4-65

4-66 4-67

5-l 5-2

5-3 5-4

5-5 5-6 5-7 5-8

Page

4-15 4-15

4-16 4-16 4-16 4-16 4-17 4-18

4-18 4-18

4-18 4-19 4-20 4-22

4-22 4-22 4-22 4-24

4-25 4-25 4-25 4-26 4-27

4-29 4-30 4-31 4-31 4-32 4-32 4-32 4-33 4-33

4-33 4-33 4-34 4-34

4-35 4-35

5-l 5-l

5-2 5-2

5-3 5-3 5-3 5-3

. . . 111

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download