Electrical Safety Operating Procedures

i.e., for long transmission lines the key for the far end can be placed in a far end key box and the box key retained by an AEP. If KEY SAFES are not readily available, or the work is to be only of short duration, either of the methods detailed in 9.2 and 9.3 are APPROVED for use. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download