PMS REQUIREMENTS - MAN HOURS - QUARTERLY SCHEDULE

This maintenance plan was developed by NAVSEA after review of U.S. Navy Shipboard Planned Maintenance Schedules (PMS) on DC/FF equipment and related systems. The schedule also incorporates the equipment and fittings (structure/portable) that will or could be utilized during test/training evaluation or Navy Reserve training evolutions. Use the Equipment Guide List (EGL) and DC AEL Locator for detailed quantities and stowage locations.

PMS SCHEDULE FOR NRC/DC/FF

3rd QUARTER (1 April - 30 June)

|NOMENCLATURE |LOCATION |MAN HOURS |TYPE MAINTENANCE/ EQUIPMENT REQUIRED |

|Administration of the Planned Maintenance |DC OPS Control Room Office |5 M/HRS |Set up, maintain PMS program, order materials|

|System Records/Files/Schedule | | |and administer program. |

|Air Compressor, Electric –Portable – Bauer - 6|Passageway |.5 X 1 = ½ M/HRS |Perform IAW manufacturer’s instructions. |

|SCFM |Air Equipment S/R | |Check lubricating fluid level, air filter and|

| | | |clean unit after use. |

|Air Compressor, Electric -Installed/Valve |Boiler Building |.75 X 1 = ¾ M/HRS |Perform IAW manufacturer’s instructions. |

|Manifold o/s | | |Check lubricating fluid level, air filter and|

| | | |clean unit after use. |

|Air Bags (8 ea) |GFE Storeroom |1.25 X 8 = 12 M/HRS |Inspect for nicks, cuts and check valve |

|Air Hose |(1st cage) | |assembly. In flat- free lift, no weight, |

|Valve Assembly | | |ensure no leaks. Check air hoses, air |

|Air Hose Manifold | | |manifold connections and manifold valve |

| | | |assembly. |

|Cable - 75 ft. Sub-Pump (2) |DCETF DC S/R, |.25 X 2 = ½ M/HR |IAW current PMS. |

| |DC Tool Cage (3rd cage) | | |

|CBR-D Individual Protective Equipment (IPE) |ESR/DCRS 2 Passageway, |.5 X 18 = 9 M/HRS |IAW current PMS. |

|Kits |DCRS 2 Passageway | | |

|Portable Generator 5.5KW |Passageway |1 X 1 = 1 M/HR |IAW current PMS. |

|Portholes |A1, A2, B1, B2 F1, E1, |10 X .25 = 2 ½ M/HR | |

| |E2, W-1 | | |

|Watertight Doors |A1, B1, F1, E1, W-1 |.5 X 6 = 3 M/HRS |Test operate |

| |(2) | | |

|Fire Extinguishers |Passageways |.25 X 6 = 1 ½ M/HRS |Inspect and weigh fire extinguishers. |

|Watertight Hatch |A2 |.5 X 1 = ½ M/HR |Test operate |

|Watertight Scuttles |A-1, A-2, B-2 |.25 X 3 = ¾ M/HR |Test operate, |

|Manhole Cover (Water Tanks) |C1, C2 |1.25 X 2 = 2 ½ M/HRS |Visually |

|Firemain/Mock-up Cutout Valves |Various (W-1, A-1, A-2, B-1, B-2,|.5 X 15 = 7 ½ M/HRS |Cycle open/closed, lubricate valve stem. |

| |E-2, F-1) | |Adjust and clean as required (after test). |

| | | |Material required: silicone, rags. |

|Propane Burner, |DCETF – F1 |2.5 X 1 = 2 ½ M/HRS |Check burner orifices, hook propane cylinder |

|Propane Cylinder, Hose/Gauge Assembly | | |and check for leaks. Light-off system one |

| | | |burner at a time. Observe operation. When all|

| | | |burners function satisfactorily, secure |

| | | |system and restore propane cylinder. Cover |

| | | |connection fitting. |

|Fire Plug Cutout Valves |Various (D-1, F-1, B-1, B-2, A-1,|.5 X 7 = 3 ½ M/HRS |Cycle open/closed, lubricate valve stem. |

|Firemain Supply Inlet Valve Manifold |A-2, D-2) | |Adjust and clean as required (after test). |

| | | |Material required: silicone, rags. |

|Fire Hoses 1 ½” x 25’, 1 ½” x 50’ (20) |DC Equip. Storeroom, Hose Racks -|.25 X 50 = 12 ½ M/HRS |Inspect hose gasket, clean and lubricate |

|Fire Hoses 1 ½” x 4, 8, 10, 15’ (Jumpers) (10)|Passageway, DCRS 2, Boiler Bldg | |fittings. Apply silicone. |

| |(Refer to EGL) | | |

|Fire Hoses 1 ¾” x 50’ |DC Equip. Storeroom, Hose Racks -|.25 X 6 = 1 ½ M/HRS |Inspect hose gasket, clean and lubricate |

| |Passageway, DCRS 2 | |fittings. Apply silicone. |

| |(Refer to EGL) | | |

|Fire Hoses 2 ½” x 25/50’ (16) |DC Equip. Storeroom, Hose Racks -|.25 X 40 = 10 M/HRS |Inspect hose gasket, clean and lubricate |

|Fire Hoses 2 ½” x 1 ½, 4, 6, 10, 20 & 25’ |Passageway, DCRS 2, Boiler Bldg | |fittings. Apply silicone. |

|(Jumpers) (14) | | | |

|Fire Hoses 2 ½” x 50’ – Rubber (2) |DC Equip. Storeroom, Hose Racks -|.25 X 2 = ½ M/HRS |Inspect hose gasket, clean and lubricate |

| |Passageway, DCRS 2 | |fittings. Apply silicone. |

|Suction Hoses 2 ½” x 10’ (6) |DC Equipment Storeroom Hose Racks|.25 X 15 = 3 ¾ M/HRS |Inspect hose gasket, clean and lubricate |

|Suction Hoses 3” (8) | | |fittings. Apply silicone. |

|Dewatering Hoses 4” (7) | | | |

|Electric Submersible Pumps (Note 1) |(4 each, 440 volt pump) |1.5 X 6 = 9 M/HRS |Inspect electric cable and gasket. Clean and |

| |Passageways, ESR Passageway | |lubricate fittings, apply silicone. Ground |

| | | |test motor, check motor, check fuse in |

| | | |control box, test run in drum of fresh water.|

| | | |(When wired correctly and turned on, unit |

| | | |will spray water straight up 15-20 feet). |

| | | |Check and make up handling line. Follow |

| | | |PMS/safety requirements. |

|Electric Submersible Pumps |(1 each, 115 volt pump) DCETF-S/R|1.5 X 1 = 1 ½ M/HRS |Inspect electric cable and gasket. Clean and |

|(Note 1) | | |lubricate fittings, apply silicone. Ground |

| | | |test motor, check motor, test run in drum of |

| | | |fresh water. (When wired correctly and turned|

| | | |on, unit will spray water straight up 10-15 |

| | | |feet). Follow PMS/safety requirements. |

|Pipe Jumper Kits 1 & 2 |Bulkhead Mounted in Passageway |.25 X 2 = ½ M/HR |Clean fittings. |

|Pipe Jumper – Mock-up |DCT/DCETF Pipe Mock-ups |.5 X 7 = 3 ½ M/HR |Clean fittings/pipe. Apply preservation |

| | | |coating as required. |

|Peri-Jet Eductors, 2 ½” inlet /4” discharge |Passageway Racks |.5 X 3 = 1 ½ M/HRS |Inspect gasket, clean and lubricate fittings.|

| | | |Apply silicone. Check and make up handling |

| | | |line. |

|Propane Cylinders (2) |F-1/DCETF S/R |.25 X 2 = ½ M/HR |Check weight. When in red, empty and refill. |

|Eductors, 1 ½” inlet/2 ½” discharge |Passageway Racks, DCETF-S/R |.5 X 4 = 2 M/HRS |Inspect gasket, clean and lubricate fittings.|

| | | |Apply silicone. Check and make up handling |

| | | |line. |

|Pump - Coast Guard, Model 2BE 6.5 |Passageway, (1) Pump |2.5 X 1 = 2 ½ M/HRS |Inspect gasket. Clean and lubricate fittings.|

| |Stowage | |Apply silicone. Test operate pump. |

| | | |Check/clean/lubricate suction hoses, foot |

| | | |valves, 10’ exhaust hose fittings/gaskets and|

| | | |Wye-gate. |

| | | |Replenish oil (10-w-40)/fuel as required. |

| | | |Clean/inspect/replace spark plugs, fuel, air |

| | | |and oil. |

| | | |Test run pumps; check operating temperature |

| | | |and auto shutdown feature. Material required:|

| | | |oil-1 qt. (10-w-40), silicone and rags. |

| | | |(Inspect/operate before test.) |

|Pump P-100 |Passageway, (2) Pump |2.5 X 2 = 5 M/HRS |Check/clean/lubricate suction hoses, foot |

| |Stowage | |valves, 10’exhaust hose fittings/gaskets and |

| | | |Wye-gate. |

| | | |Replenish oil (10-w-40)/fuel as required. |

| | | |Clean/inspect/replace spark plugs, fuel, air |

| | | |and oil. |

| | | |Test run pumps; check operating temperature |

| | | |and auto shutdown feature. Material required:|

| | | |oil-1 qt. (10-w-40), silicone and rags. |

| | | |(Inspect/operate before test.) |

|DCETF, Damage Control Equipment Store Room |DCETF, Damage Control Equipment |5.5 X 1 = 5 ½ M/HRS |Inventory and fill DC kit shortages (pipe, |

|(Note 2) |Store Room | |plugging, shoring, metal banding, etc). |

| | | |Clean, wire brush and lubricate all adapters |

| | | |and fittings. Check gaskets to ensure they |

| | | |are not deteriorated. |

| | | |Renew all battle lantern, helmet light and |

| | | |flashlight batteries and operation-ally |

| | | |check. |

| | | |Inspect rubber boots for condition. |

| | | |Recharge batteries in flood lanterns. |

| | | |Renew batteries in 02 explosive meters. |

| | | |Perform user calibration. Perform PMS on |

| | | |4-gas monitor. |

| | | |Inspect and lubricate all Wye- and Tri-gates.|

| | | |Test equipment. |

| | | |Test operate smoke generator. Check fluid and|

| | | |replace as required. Clean unit. |

| | | |Check first aid kits. |

|DCRS 2, Damage Control Equipment |DCETF, Damage Control Equipment |6.5 X 1 = 6 ½ M/HRS |Inventory and fill DC kit shortages (2 pipe, |

|(Note 2) |Storeroom | |3 plugging, shoring, metal banding, etc). |

| | | |Renew all battle lantern, helmet light and |

| | | |flashlight batteries and operation-ally |

| | | |check. |

| | | |Inspect rubber boots for condition and |

| | | |ventilate. |

| | | |Recharge batteries in flood lanterns. |

| | | |Renew batteries in 02 explosive meters. |

| | | |Perform user calibration. Perform PMS on |

| | | |4-gas monitor. |

| | | |Inspect and lubricate all Wye- and Tri-gates.|

| | | |Test equipment. |

| | | |Clean, wire brush and lubricate all adapters |

| | | |and fittings. Check gaskets to ensure they |

| | | |are not deteriorated. |

| | | |Check all trainer mock-ups. |

| | | |Test operate smoke generator (DC trainer). |

| | | |Check fluid and replace as required. Clean |

| | | |unit. |

| | | |Check first aid kits. |

|Fire Station Equipment |DC Trainer (DCT) DCT -Passageway |.5 X 2 = 1 M/HR |Inspect, clean and lubricate nozzles and |

| | | |Wye-gates. |

|OBA (Note 1) F/F DOA (6) |F/F DOA - Passageway |.5 X 7 = 3.5 M/HRS |Conduct PMS as required. |

|DC Trainer (1) | | | |

|Self Contained Breathing Apparatus (SCBA) (10)|SCBA Locker –Passageway, Single |.25 X 10 = 2 ½ M/HRS |Check air charge. Recharge after use. Clean |

| |Mount Racks, ESR Passageway | |after use. Conduct PMS as required. |

|SCBA Bottles (Note 1) |SCBA Locker –Passageway, Single |.25 X 10 = 2 ½ M/HRS |Perform required PMS after use. Check hydro |

| |Mount Racks, ESR Passageway, Air | |test date (within 6 years periodicity). |

| |Equipment Storeroom/Lockers | | |

| |(Refer to EGL) | | |

|Lights - Sealed Beam/ Charging System |DCETF S/R |.25 X 3 = ¾ M/HR |Conduct PMS as required, re-charge after use.|

|Navy Firefighter’s Thermal Imager (NFTI) |NAVSEA Eng. S/R |.25 X 1 = ¼ M/HR |Check batteries, replace as required and |

| | | |perform operational check. |

|Firefighters Dress Out Areas: Firefighter’s |Passageway, DCRS 2, Passageway - |.25 per FFE, 6 each X 2 F/F DOA = |Check FFE. Ensure clean and reflective |

|Ensemble (FFE) |F/F Dress Out Area (F/F DOA) |12 FFE = |markings are secured. If soiled/mildew, |

| | |3 M/HRS |launder as required IAW current PMS. |

|Valve Manifold Air-Compressor |Outside - Adjacent to Boiler |.25 X 1 = ¼ M/HR |Perform IAW manufacturer’s instructions. |

| |Building | |Check and lubricate. Clean unit after use. |

| | | |(Check before test.) |

|Portable Hydraulic Rescue System (PHARS) |Passageway - Stowage Cabinet |1.75 X 1 = 1 ¾ M/HRS |Test operate PHARS unit. Check hydraulic |

| | | |fluid IAW current PMS. |

|Portable Electric All Purpose Rescue Set |GFE S/R (1st cage) Stowage |1.25 X 1 = 1 ½ M/HRS |Test operate Power Hawk unit. Check hydraulic|

|(PEARS), Power Hawk |Cabinet | |fluid IAW current PMS. |

|Shoring 3-5 ft. Steel (4 each) |DCETF S/R |.25 X 8 = 2 M/HRS |IAW current PMS. |

|Shoring 6-11 ft. Steel (4 each) |DCT - Passageway | | |

|Shoring Battens – Short (2 each) |DCETF S/R |.25 X 4 = 1 M/HR |IAW current PMS. |

|Shoring Battens – Long (2 each) |DCT-Passageway | | |

|Smoke Generator |DCETF S/R, DCT, NAVSEA Eng. S/R |.5 X 6 = 3 M/HRS |IAW current PMS. |

|Tubeaxial FanLadder, Aluminum – Vertical |Desmoking Stations - Passageways,|.5 X 5 = 2 ½ M/HRS1 X 5 = 5 M/HRS |Test, clean and check electrical cable for |

| |DCETF DC S/RW-1, B-1, B-2, A-2, | |fraying.Clean with wire brush, lubricate |

| |DCT | |pins, and adjust. Material required: |

| | | |silicone, wire brush, rags. |

|Water Driven FanTubeaxial Fan |Desmoking Stations - |1.25 X 3 = 3 ¾ M/HRS.5 X 5 = 2 ½ |Clean with wire brush, lubricate fittings. |

| |PassagewaysDesmoking Stations - |M/HRS |Material required: silicone, wire brush, |

| |Passageways, DCETF DC S/R | |rags.Test, clean and check electrical cable |

| | | |for fraying. |

|Welder – PortableWater Driven Fan |DC Tool Cage - WorkshopDesmoking |.5 X 1 = ½ M/HR1.25 X 3 = 3 ¾ |Conduct IAW PMS card.Clean with wire brush, |

| |Stations - Passageways |M/HRS |lubricate fittings. Material required: |

| | | |silicone, wire brush, rags. |

|Vent Ducts - 10” x 15’ -PortableWelder – |Desmoking Stations - |.5 X 12 = 6 M/HRS.5 X 1 = ½ M/HR |Extend, inspect and clean. Inspect snap-hook |

|Portable |PassagewaysDC Tool Cage - | |to ensure that it is catching to hold |

| |Workshop | |assembly closed/secured when not in |

| | | |use.Conduct IAW PMS card. |

|Training Kit - 2 each includes bag, flags, |DCETF/DCRS 2 - DCTDesmoking |.75 X 2 = 1 ½ M/HRS.5 X 12 = 6 |IAW current PMS requirements.Extend, inspect |

|sound equipment and lights. Smoke generators |Stations - Passageways |M/HRS |and clean. Inspect snap-hook to ensure that |

|listed separately are part of kit.Vent Ducts -| | |it is catching to hold assembly |

|10” x 15’ -Portable | | |closed/secured when not in use. |

|Training Kit - 2 each includes bag, flags, |TOTALDCETF/DCRS 2 - DCT |173.5 MAN HOURS PER QTR.75 X 2 = 1|IAW current PMS requirements. |

|sound equipment and lights. Smoke generators | |½ M/HRS | |

|listed separately are part of kit. | | | |

| |TOTAL |173.5 MAN HOURS PER QTR | |

| | | | |

| | | | |

| | | | |

Notes:

1. All equipment should be stowed after use.

2. Batteries should be removed at end of exercises, training and test/evaluation.

3. This does not include the 48 M for fire hose hydro or the SCBA cylinder requirement at 72 M for re- hydro. TASS must determine current hydro dates on all hoses/cylinders.

4. If the DCETF air bag system is not being utilized, then the air bag check can be extended to six months.

5. The 173.5 man hours per quarter is the requirement for an up and operating facility. 161.5 man hours are required, when not using the air bag system.

6. The fire hose hydro pump motor requires repairs.

................
................