Memorandum Report on Allison-V-1710-91

It is reconnendod that the Allison engine onsid— ered as hevinz sucessfully passed the preliminary Viar 2mer¿eocy as conducted in accordance with the Army Specification on War BE.ercency Approval Testing. 2. However, it is recormended that the PD-12K7 a x±uretor, Parts List Yo. 595003—5, be modified to allow a mininurn fuel.air ratio of ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download