Chapter 01 Quiz A



Chapter 09 Quiz A Student Name _________________________ Student ID ____________

Use the following information to answer questions 1 through 5.

You are analyzing a proposed project and have compiled the following information:

Year Cash flow

0 -$145,000

1 $ 33,400

2 $ 70,500

3 $ 82,100

Required payback period 3 years

Required return 9.50 percent

________ 1. What is the net present value of the proposed project?

a. $6,239.12 b. $6,831.84 c. $8,221.29 d. $8,376.91

________ 2. What is the discounted payback period?

a. 2.68 years b. 2.79 years c. 2.89 years d. 2.95 years

________ 3. Should the project be accepted based on the internal rate of return (IRR)? Why or why not?

a. no; The project IRR is greater than the required return.

b. no; The project IRR is greater than zero.

c. yes; The project IRR is greater than the required return.

d. yes; The project IRR is equal to zero.

________ 4. Should the proposed project be accepted based on the profitability index (PI)? Why or why not?

a. no; The PI is less than 1.0.

b. no; The PI is greater than 1.0.

c. yes; The PI is less than 1.0.

d. yes; The PI is greater than 1.0.

________ 5. Should the proposed project be accepted based on the payback period? Why or why not?

a. yes; The payback period is greater than the required payback period.

b. yes; The payback period is less than the required payback period.

c. no; The payback period is greater than the required payback period.

d. no; The payback period is less than the required payback period.

________ 6. Dew Little Co. is considering opening a new plant to produce lawn mowers. The initial cost of the project is

$6 million. This cost will be depreciated straight-line to a zero book value over the 15-year life of the

project. The net income of the project is expected to be $137,000 a year for the first four years and $538,000 for years 5 through 15, respectively. What is the average accounting return on this project?

a. 12.47 percent b. 13.17 percent c. 14.37 percent d. 15.87 percent

________ 7. Which one of the following indicates a project should be accepted?

a. NPV = -$281

b. PI = 1.02

c. IRR = 13.8 percent; Required return = 14.2 percent

d. Payback = 3.31 years; Required payback = 3.25 years

________ 8. The point where the net present values of two mutually exclusive projects are equal is referred to as the:

a. internal rate of return.

b. point of profitability.

c. crossover point.

d. payback point of equivalency.

________ 9. Which one of the following statements is correct?

a. Multiple MIRR’s exist when cash flows are unconventional.

b. MIRR’s are independent of an external discount rate.

c. The value of a project depends on how the cash flows from the project are used.

d. A project’s cash flows are modified prior to computing the MIRR.

_______ 10. For an independent project, NPV:

a. is the difference between the project’s cost and its market value.

b. generally conflicts with the IRR accept / reject decision.

c. is the least favored method of project analysis from a finance point of view.

d. indicates an accept decision when it is negative.

Chapter 09 Quiz A Answers

1. b [pic]; NPV = $6,831.84

CF0 -$145,000

C01 $33,400

F01 1

C02 $70,500

F02 1

C03 $82,100

F03 1

I = 9.5

NPV CPT

$6,831.84

2. c Year Cash flow Discounted cash flow

1 $33,400 $30,502.28

2 $70,500 $58,797.77

3 $82,100 $62,531.78

[pic] = 2.89 years

3. c CF0 -$145,000

C01 $33,400

F01 1

C02 $70,500

F02 1

C03 $82,100

F03 1

I = 9.5

IRR CPT

11.81 percent

The project should be accepted because the IRR of 11.81 percent is greater than the required return of 9.5

percent.

4. d CF0 $0

C01 $33,400

F01 1

C02 $70,500

F02 1

C03 $82,100

F03 1

I = 9.5

NPV CPT

$151,831.84

[pic]

The project should be accepted because the PI of 1.05 is greater than 1.0.

5. b Year Cash flow

1 $33,400

2 $70,500

3 $82,100

[pic]

The project should be accepted because the payback period of 2.50 years is less than the required payback of 3 years.

6. c [pic]

7. b A PI greater than 1.0 indicates acceptance.

8. c

9. d

10. a

Chapter 09 Quiz B Student Name _________________________ Student ID ____________

Use the following information to answer questions 1 through 5.

You are analyzing a proposed project and have compiled the following information:

Year Cash flow

0 -$228,000

1 $ 56,500

2 $ 99,700

3 $115,000

Required payback period 3 years

Required return 9 percent

________ 1. What is the net present value of the proposed project?

a. -$3,448.54 b. -$3,163.80 c. $6,163.80 d. $15,377.15

________ 2. What is the discounted payback period?

a. never b. 2.37 years c. 3.04 years d. 3.37 years

________ 3. Should the project be accepted based on the internal rate of return (IRR)? Why or why not?

a. no; The project IRR is greater than the required return.

b. no; The project IRR is less than the required return.

c. yes; The project IRR is greater than the required return.

d. yes; The project IRR is equal to zero.

________ 4. Should the proposed project be accepted based on the profitability index (PI)? Why or why not?

a. no; The PI is less than 1.0.

b. no; The PI is greater than 1.0.

c. yes; The PI is less than 1.0.

d. yes; The PI is greater than 1.0.

________ 5. Should the proposed project be accepted based on the payback period? Why or why not?

a. yes; The payback period is greater than the required payback period.

b. yes; The payback period is less than the required payback period.

c. no; The payback period is greater than the required payback period.

d. no; The payback period is less than the required payback period.

________ 6. Drexfel Co. is considering opening a new plant to produce lawn mowers. The initial cost of the project is

$2 million. This cost will be depreciated straight-line to a zero book value over the 10-year life of the project. The net income of the project is expected to be $86,000 a year for the first three years and $95,000 for years 4 through 10, respectively. What is the average accounting return on this project?

a. 4.62 percent b. 6.71 percent c. 8.28 percent d. 9.23 percent

________ 7. Which one of the following statements is correct concerning the profitability index (PI)?

a. PI should be used to determine which one of two mutually exclusive projects should be accepted.

b. PI is the discount rate that makes the net present value equal to zero.

c. There can be multiple PIs if the cash flows are unconventional.

d. PI is used to rank positive NPV projects when the available funds are limited.

________ 8. You should accept a project when the:

a. net present value is positive.

b. profitability index is less than 1 but greater than zero.

c. discounted payback period is greater than the required period.

d. modified internal rate of return is less than the required return.

________ 9. The crossover point:

a. is used to determine which one of two internal rates of return for a project should be used when

determining if a project should be accepted.

b. is the point where the net present value of a project is equal to zero.

c. equates the net present values of two separate projects.

d. is the time at which a project pays back on a discounted basis.

________ 10. Which one of the following statements is correct?

a. The discounted payback period is longer than the payback period.

b. The internal rate of return is used to determine which one of two mutually exclusive projects should be

accepted.

c. The modified internal rate of return is used to evaluate different sized projects.

d. The payback period is considered the best method of project analysis from a financial point of view.

Chapter 09 Quiz B Answers

1. a [pic]; NPV = -$3,448.54

CF0 -$228,000

C01 $56,500

F01 1

C02 $99,700

F02 1

C03 $115,000

F03 1

I = 9

NPV CPT

-$3,448.54

2. a Year Cash flow Discounted cash flow

1 $ 56,500 $ 51,834.86

2 $ 99,700 $ 83,915.50

3 $115,000 $ 88,801.10

Total $224,551.46

On a discounted basis, this project never pays back.

3. b CF0 -$228,000

C01 $56,500

F01 1

C02 $99,700

F02 1

C03 $115,000

F03 1

I = 9

IRR CPT

8.24 percent

The project should not be accepted because the IRR of 8.24 percent is less than the required return of 9

percent.

4. a CF0 $0

C01 $56,500

F01 1

C02 $99,700

F02 1

C03 $115,000

F03 1

I = 9

NPV CPT

$224,551.46

[pic]

The project should be rejected because the PI of .98 is less than 1.0.

5. b Year Cash flow

1 $ 56,500

2 $ 99,700

3 $115,000

[pic]

The project should be accepted because the payback period of 2.62 years is less than the required payback of 3 years.

6. d [pic]

7. d

8. a

9. c

10. a

Chapter 09 Quiz C Student Name _________________________ Student ID ____________

Use the following information to answer questions 1 through 5.

You are analyzing a proposed project and have compiled the following information:

Year Cash flow

0 -$164,700

1 $ 24,300

2 $108,600

3 $ 85,100

Required payback period 3 years

Required return 11 percent

________ 1. What is the net present value of the proposed project?

a. $5,610.29 b. $6,809.44 c. $7,558.47 d. $8,012.73

________ 2. What is the discounted payback period?

a. 2.09 years b. 2.37 years c. 2.62 years d. 2.88 years

________ 3. Should the project be accepted based on the internal rate of return (IRR)? Why or why not?

a. yes; The project IRR is greater than the required return.

b. yes; The project IRR is equal to zero.

c. no; The project IRR is greater than the required return.

d. no; The project IRR is greater than zero.

________ 4. Should the proposed project be accepted based on the profitability index (PI)? Why or why not?

a. yes; The PI is less than 1.0.

b. yes; The PI is greater than 1.0.

c. no; The PI is less than 1.0.

d. no; The PI is greater than 1.0.

________ 5. Should the proposed project be accepted based on the payback period? Why or why not?

a. no; The payback period is greater than the required payback period.

b. no; The payback period is less than the required payback period.

c. yes; The payback period is greater than the required payback period.

d. yes; The payback period is less than the required payback period.

________ 6. Bluefield Energy is considering opening a new plant to produce small windmills. The initial cost of the

project is $770,000. This cost will be depreciated straight-line to a zero book value over the 8-year life of the

project. The net income of the project is expected to be $67,000 a year for the first two years and $79,000 for

years 3 through 8, respectively. What is the average accounting return on this project?

a. 17.18 percent b. 18.49 percent c. 19.74 percent d. 20.80 percent

________ 7. Which one of the following statements is correct concerning the discounted payback method (DPB) of

analysis?

a. DPB is useful because it considers all of the cash inflows as well as the cash outflows.

b. DPB favors long-term projects.

c. DPB is preferred over payback; but in practice, DPB is used less frequently than payback.

d. You should accept a project when the DPB is greater than the required period.

________ 8. You should accept a project when the:

a. net present value is negative.

b. profitability index is greater than 1.0.

c. payback period is greater than the required period.

d. modified internal rate of return is less than the required return.

________ 9. Which one of the following methods of project analysis is most biased towards short-term returns?

a. internal rate of return

b. profitability ratio

c. payback period

d. net present value

________ 10. Which one of the following methods of analysis requires adjusting the cash flows of a project?

a. profitability index

b. payback period

c. modified internal rate of return

d. accounting rate of return

Chapter 09 Quiz C Answers

1. c [pic]; NPV = $7,558.47

CF0 -$164,700

C01 $24,300

F01 1

C02 $108,600

F02 1

C03 $85,100

F03 1

I = 11

NPV CPT

$7,558.47

2. d Year Cash flow Discounted cash flow

1 $ 24,300 $21,891.89

2 $108,600 $88,142.20

3 $ 85,100 $62,224.39

[pic] = 2.88 years

3. a CF0 -$164,700

C01 $24,300

F01 1

C02 $108,600

F02 1

C03 $85,100

F03 1

I = 11

IRR CPT

13.26 percent

The project should be accepted because the IRR of 13.26 percent is greater than the required return of 11

percent.

4. b CF0 $0

C01 $24,300

F01 1

C02 $108,600

F02 1

C03 $85,100

F03 1

I = 11

NPV CPT

$172,258.47

[pic]

The project should be accepted because the PI of 1.05 is greater than 1.0.

5. d Year Cash flow

1 $24,300

2 $108,600

3 $85,100

[pic]

The project should be accepted because the payback period of 2.37 years is less than the required payback of 3 years.

6. c [pic]

7. c

8. b

9. c

10. c

................
................