Global Installation & Field Service



CURRICULUM VITAE

1 SRINIVASA RAO KRISHNA KUMAR

NEW NO: 29,OLD NO: 5, P. E. KOIL NORTH MADA STREET,

AYANAVARAM,CHENNAI,TAMIL NADU,INDIA. PIN-600 023

MOBILE NO IN INDIA # 00918754553600 & 00919444103967

TEL LAND LINE RESI # 00914445090398

E-MAIL : Krishna_kumar_s@ / kkacs1028@

FATHER’S NAME : Mr.G.SRINIVASA RAO PASSPORT NO : Z-1761560 MARTIAL STATUS : MARRIED ISSUED AT : CHENNAI ON 09/11/2009

DATE OF BIRTH : 25/08/1967 VALID TILL : 08/11/2019 (ECNR)

NATIONALITY : INDIAN

| |Secondary School Leaving Certificate - 1983   63% |

|EDUCATION & COURSES |Diploma in Radio& T.V.Technology   - 1985 MERRIT |

| |NCTVT in Instrumentation at Industrial Training Institute MADRAS - 1987 84% |

| |National Apprenticeship Training Certificate ( NAC) In Instrumentation - 1989 67% |

| |Advance Training Institute Course in Process Control Instrumentation - 1987 |

| |AutoCAD Release 13 Levels I,II,III,IV With G.C.I Auto Desk -1997 |

| |Computer Knowledge Ms Windows, Dos & Windows Based Applications. |

| |BOSIET (OPITO ) Valid Till SEP-2015 |

| |Off-Shore Sea survile Training ,Helicopter Under Water |

| |Escape Training & Fire fighting Training Certificate, |

| |Registered HIMT-INDOS Batch No: 218 |

| |Hse & Fire Fighting Training For On/Off-Shore Certificate. |

| |“Health, Environment & Safety Fundamentals Awareness Level” 28 Modules CBT Certification, Under gone SAP,PSM |

| |& STOP TRAININGS IN EG LNG |

| |AGIP-KCO HSE VALID Passport holder completed training with TRIC & PTW Level-2 course. |

|SPOKEN LANGUAGES | ENGLISH, HINDI,MARATHI,TAMIL & TELUGU |

WORKED LOCATIONS : INDIA,ABU DHABI -UAE, KUWAIT, MALAYSIA, EQUATORIAL GUINEA - WEST AFRICA, NIGERIA - WEST AFRICA, ATYRAU – REPUBLIC OF KAZAKHSTAN.

MAIN TECHNICAL COMPETENCES:

IN THE FIELD OF INSTRUMENTATION AND CONTROL

❖ Problem identification and rectification with minimum down time.

❖ Can Independently Handle The site for Plant Operation, Maintenance ,Commissioning & Start up of Turbines,Compressors & Related Auxiliary Units.

❖ Monitoring and allocation of work to subordinates.

❖ Erection, cabling, testing, loop checking pre-commissioning, Walk downs-Inspections & Acceptance, commissioning of all types of instruments.

❖ Preparation of documents for instrument calibration reports, P&I Diagram correction and work permits.

❖ Familiar and Handling for Spares, Material Request & Order with using of Manufacturer NP Codes.

MAIN MANAGEMENT COMPETENCES:

❖ Knowledge, application and respect of EHS rules

❖ Involved & Incharge of Plant Maintenance Activities at NAOC-AGIP ,Kwale Gas Plant NIGERIA.

❖ Coordination and management of sub-contracting manpower.

❖ Preparation of Reports & Attending with Client Meetings

WORK EXPERIENCES (20 Years)

| |Sep-2011 To April -2012 |

|Dates | |

|Company |Imtech-Bolashak , Atyrau,Republic of Kazakhstan. |

|Customer |AGIP – KCO -Kazakhstan North Caspian Operating Company, Republic of Kazakhstan |

|Site |KASHAGAN Development Off-shore Experimental Project, Atyrau, |

| |D-Island off-shore 28/28 days rotation |

|Position |Senior Instrument Commissioning Technician. |

| |(Integrated Commissioning & Acceptance Team |

|Duties & |Involved in ICAT Commissioning Team and start-up activities for |

|Equipment |Utility systems ,Fire water Pumps & HVAC System |

| |.Flash gas Compression Module 3&4 with Siemens gas turbine Triconix system related instruments Loop checking. |

|Dates |Jan-2008 To Mar-2011. |

|Company |Asmacs Fze, Sharjah, UAE. |

|Customer |T&T Sistemi Spa – Italy / GE International Operations Nigeria Ltd, |

| |(General Electric NP Nigeria Ltd), Lagos, Nigeria, West Africa. |

|Site |Kwale Gas Plant ,Nigerian Agip Oil Colt (NAOC-AGIP) |

| |On-Shore ON-OFF 35days/28days Rotation |

|Position | Senior Instrument Inspector & Site In charge Of Gas Plant Maintenance. |

|Duties |Global Maintenance Jobs for Kwale Gas Plant (NAOC-AGIP) Gas Plant Maintenance Of Turbines & Compressors and Auxiliary Units |

|& |Preventive & Shutdown Maintenance Works Related Systems & Instruments Like DCS ,Fire &Gas General Monitors Plc:Allen Bradley |

|Equipment |(Field & Local Control Loops) GE Speed-Tronic Mark V - Gas Turbine Compressor Control Compressor Control Corporation - Ccc Anti|

| |Surge Control For Compressors Bently Nevada 3500 Vibration & Temperature Monitoring System For Compressor Monitoring. |

| |Reporting Familiar And Handling For Spares, Material Request & Order With Using Of Manufacturer NP Codes. |

| |Gas Power Turbine Make: GE Nuovopignone (MS-5001 PA) |

| |Related Auxiliary Equipments Like (Lube Oil System, Hydraulic Supply & Hydraulic Ratchet System, Control Oil System, Oil Vapor |

| |Separator, Fuel Gas System, Cooling & Sealing Air System, Starting System(Auxiliary Gearbox),Bearing Protection System, Turbine |

| |Control Devices, Ventilation System, Fire Detection System, Online & Offline Washing Skid, Load Gear & Load Coupling) |

| |Hp Compressors (BCL 305/B +Bcl 306/C), |

| |MP Compressors(BCL 406/A) |

| |Make: Nuovopignone, Italia.Centrifugal E-Motor Driven PLC GE Fanuc Series 90 -70 PLC, and Modbus RS232/422 & RS 485. |

| |MP & LP Reciprocating Caterpillar G-399 Diesel Engine Driven Compressors Control System. |

| |May- 2006 To Aug-2007 |

|Dates | |

|Company |Wood Group Equatorial Guinea Ltd, Houston,Texas,USA. |

|Customer |Marathon EGLNG Company, Punta Europa,Bioko Island, Malabo, |

| |Equatorial Guinea, West Africa |

|Site |EGLNG Train-1 |

|Position |Senior Instrument Technician & Mentor / Planner {Maintenance} Rotational Leave Cycle. |

|Duties |Involved In Lng Plant Maintenance Work & Pm Jobs. Earlier In Inspection & Walk Down Of (Bechtel |

|& |Pre-Commissioning, Commissioning Activities) For Lng Plant ,Train-1 Unit Of  M/S. Marathon Eglng Company, West Africa, Related |

|Equipment |Systems & Instruments Like Dcs: Delta V (Foundation Field Bus) Esd System: Ics Triplex Plc Plc: Fire & Gas General Monitors|

| |Plc: Allen Bradley (Field & Local Control Loops) Ge Speed-Tronic Mark Vi - Gas Turbine Compressor Control Compressor Control |

| |Corporation - Ccc Anti Surge Control For Compressors Bentley Nevada Vibration & Temperature Monitoring System For Compressor |

| |Monitoring Harbor & Marine Engineering Mooring & Loading Systems: Plc Based System Tank Gauging System: Ldt Plc Based System |

| |.Ge Geps Oil & Gas (Nuovo Pig none) Centrifugal Compressors Mcl 807-Mcl 806-3bcl 608. Ge Geps Oil&Gas (Nuova Pignone) Propane |

| |Centrifugal Compressors 3mcl-1405 Used Make & Manufacturer Of Instruments : |

| |Nuova Fima-Pressure,Temp Dp Indicators,Rosemount-Pressure,Dp Transmitter Model 3051 Smart,Bently Nevada-Probe Proximitor (3300 |

| |5mm 8mm Proximity Transducer System Using With Tk3 Test Kid) Sami-Adj.Flow Orifice Control Valve,Swagelock-Flow Orifice S,M,L & |

| |31 Series, Anderson & Greenwood- Adj.Flow Orifice Type Uba&Uban,Carraro,Betti&Fisher-Control Valves,Fisher-667 Type Diaphram |

| |Actuator Size 30-76 & 87,Class 125 Through 600, Fisher -67c Series Inst.Air Supply Regulators,Asco- Solenoid Valve,Tecnel-Gas |

| |Seal Control Panel. Handling Sap System & Mentor / Trainings For National Workforce. Experienced In Company Procedures |

| |Formatting With Planning, |

| |Worked As A Maintenance Planner Handling With Sap System. |

|Dates |Dec-2005 To Apr-2006 |

|Company |Foster Wheeler, Abu Dhabi,Uae. |

|Customer |Abu Dhabi Marine Operating Company (Adma Opco), Abu Dhabi,Uae. |

|Site |Off-Shore Khuff Gas Development Project(Okgd),Umm-Shaif Super Complex Off-Shore (Ussc),Off-Shore Khuff Gas Development Taweela |

| |Alpha Platform (Ta), |

| |Abu Dhabi,Uae. |

|Position |Assist. Icaps Administrator & Document Controller On Day To Day Work |

| |(Off-Shore Commissioning Team - Rotation) |

| |( Integrated Commissioning And Progress System By Total Fina Elf) |

|Duties |Co-Ordination With Client, Engineering Contractors, Joint Venture Partners, Subcontractors, Vendors, Project Management Team And |

|& |Inter Departments Of Documentation Related Issues.Monitor Drawings/Documents Issuance As Per Planned Dates From Various Suppliers |

|Equipment |/Subcontractors And In-House Generated Documents.In-Charge Of Document Control/Management System. The Documentation Required To |

| |Be Managed By This System Includes Complete Range Of Technical Documentations, Service Orders, Quality Records And Non Conformity |

| |Documents Generated From The Design/Construction Site Which Are Further Utilized For As-Built Documentation/Final Hand-Over |

| |Dossiers And Administrative Correspondence Of The Project.Responsible For Checking Incoming/Outgoing Drawings/Documents |

| |Transmittals, Updating The Same On Systems, Timely Distribution Of All Drawings/Documents To Pmt Members, Inter Departments, |

| |Vendors Subcontractors, Client For Further Action/Information.  Checking Document Numbering, Revisions Format Completeness Against|

| |Specific/Corporate Procedures. Updating The Status Of Each Document In The System And Produce Different Type Of Reports As |

| |Required By Pmt Members From Time To Time.Co-Ordination With Vendors, Design And Construction Subcontractors And Inter Departments|

| |To Get Their Final Documentation As Per Project Requirements.Plan And Coordinate For The Entire Project Completion Documentation |

| |Hand-Over To Client.  The Includes As-Built Drawings, Engineering Dossiers Construction Dossiers Maintenance Manuals, And |

| |Manufacturer/Vendor’s Literature.Responsible For Organizing And Conducting Archiving Of Files At End Of The Project. |

|Dates |Dec-2003 To Sep-2004.  |

|Company |Kellogg Brown & Root,International,Inc,(A Halliburton Company),Abu Dhabi,UAE. |

|Customer |Abu Dhabi Marine Operating Company (Adma – Opco), |

| |Zakum West Super Complex (Zwsc) - Offshore , Abu Dhabi. |

|Site |Zakum Off-shore Crestal Gas Injection Project For Train -III) |

|Position |Instrument Technician (Off Shore--Rotation) |

|Duties |Involved In Pre-Commissioning, Commissioning  Start-Up Activities Of  Abu Dhabi Marine Operating Company(Adma – Opco),Zakum West |

|& |Super Complex (Zwsc) - Offshore , Abu Dhabi. Uae. Zakum Crestal Gas Injection Project For (Gip Dresser Rand Twin- Stage Compressor|

|Equipment |Train -III) & Related Well Head Hydraulic Safety System (Cac) & Instruments. |

|Dates |Apr- 2000 To Oct-2002 |

|Company |Abu Dhabi Marine Operating Company(Adma – Opco), |

|Customer |Zakum West Super Complex (Zwsc) – Offshore, Abu Dhabi,Uae. |

|Site |Zakum Off-shore Gas Injection Platform Train-I & II |

|Position |Instrument Technician (Off Shore -- Rotation) |

|Duties |Involved In Commissioning, Start-up & Maintenance Activities of Gas Injection Platform for The Following Systems and related |

|& |Instruments. |

|Equipment |Bailey Infi 90 Dcs System. |

| |Gas Driven Cooper Rolls Royce Turbine And Dresser Rand Twin- Stage Compressor Associated Shutdown And Startup Sequences. |

| |Triconex Tmr Plc System For Turbine Control System. |

| |Calibration, Loop Checking & Commissioning Of Foxboro- Eckardt Smart Family Transmitters For Pressure , Flow, Temperature , And |

| |Level Measurement. |

| |Calibration Of Vibration Monitor Bently Nevada Series 3300 And 7200. |

| |Ics (Industrial Control Services) Esd System Cause And Effect Checking And Trouble Shooting. Ametek 5000 Moisture Analyzer |

| |Calibration & Commissioning. |

| |Gee Faunic Genious 90 – 70 Plc For Fire & Gas System |

| |Fire & Gas System |

| |Gas Detectors (Sieger-Optima) Gas Detectors Calibration And Commissioning. |

| |Sieger – Excel Open Path Optical Finder Alignment, Calibration And Commissioning. |

| |Smoke Detectors (Apollo) Radioactive Type Smoke Detector And Ionization Type Detector Periodic Checking.(Vesda) Smoke Detector |

| |Periodic Checking. |

| |Heat Detector (Apollo) Heat Detector Periodic Checking. |

| |H2s Sensors (General Monitors Smart Type H2s)Sensor Calibration And Commissioning. |

| |Gas Detectors (Sieger-Optima) Gas Detectors Calibration And Commissioning |

| |Sieger – Excel Open Path Optical Finder Alignment, Calibration And Commissioning. |

| |Smoke Detectors (Apollo) Radioactive Type Smoke Detector And Ionization Type |

| |Detector Periodic Checking.(Vesda) Smoke Detector Periodic Checking. |

| |Heat Detector (Apollo) Heat Detector Periodic Checking. |

| |H2s Sensors (General Monitors Smart Type H2s) Sensor Calibration And Commissioning. |

| |Involved In Zw-100, Pc-110, Zk-311, Zk-276, Adma-Opco & Zadco Well Head Instruments Calibration, Pre-commissioning, Commissioning |

| |Activities For The Following System |

| |Thermo Electric Generator |

| |F&G System |

| |Dcs & Esd Loop Checks (Including Stroking Of Valves) |

| |Existing Hydraulic Safety System |

| |Cause & Effects Checks. |

| |Solar System |

| |Remote Terminal unit(Rtu) & Master Terminal Unit( Mtu)Detail Checks |

| |Hipps (High Integrity Pressure Protection) System. |

| |In Addition Preparing Of Final Commissioning Dossiers For GIP Plant Systems & Well Head Systems. |

|Dates |Aug-1999 To Jan-2000. |

|Company |Metronic Engineering Sdn.Bhd., Malaysia |

|Customer |Ministry Of Health, Malaysia For Y2k Project |

|Site |At Melaka And Negeri-Sembilan State Hospitals. |

|Position |Y2k Assessment Consultant. |

|Duties |Worked In Ministry Of Health, Malaysia For Y2k Project As A Team Leader At Melaka And Negeri-Sembilan State Hospitals Equipment |

|& |Related Instruments With Microchips Functional. |

|Equipment | |

|Dates |Jan-1999 To May-1999. |

|Company |Abu Dhabi Marine Operating Company (Adma – Opco), |

|Customer |Zakum Central Super Complex(Zcsc), Offshore ,Abu Dhabi,Uae. |

|Site |Zakum Central Super Complex(Zcsc), Offshore ,Abu Dhabi,Uae. |

| |Moocs Project. |

|Position |Instrument Technician –(Off-Shore Rotation) |

|Duties |For Offshore Moocs (Modenation Of Offshore Control&System)Up Grading System With Scada (Supervisory Control &Data Accusation) In |

|& |Wip (Water Injection Plant),Csp(Central Separation Platform), Gg-Ii(Gas Gathering), F & G & Utility |

|Equipment | |

|Dates |Jul-1998 To Jan-1999. |

|Company |Cetex Petrochemicals Limited, Chennai, India. |

|Position |Senior Instrument Technician (Maintenance) |

|Duties |Worked In Running Plant Maintenance & Preventive Maintenance For Taylor Mod30 System Control & Measuring Instruments In MEK, SBA &|

|& |UTILITY Areas. Preparing Of Reports For Planning, Maintenance & Calibration For ISO 9002 In Computer CMMS (Windows 95) As Passport|

|Equipment |Entry. |

|Dates |Apr-1998 To May-1998. |

|Company |Cegelec, Division Comsip, Abu Dhabi, And Uae. |

|Customer |Bunduq Oil Company,Abu Dhabi,Uae. |

|Site |Bunduq – Offshore, Abu Dhabi,Uae. |

|Position |Instrument Technician (Off-shore) |

|Duties |Measuring And Controlling Instruments, Shutdown, Maintenance Jobs For Water Injection Platform (Wip), Central Collector |

|& |Platform (Ccp), Gas Sweetening Platform (Gsp). |

|Equipment | |

|Dates |Jan-1996 To Feb-1997 |

|Company |Instrument Installation And Maintenance Co.Wll (Imco), Kuwait. |

|Customer |Ministry Of Electricity And Water, Kuwait |

|Site |Shuaiba South Power And Water Production Station,Kuwait. |

|Position |Instrument Supervisor (Maintenance) |

|Duties |Worked In 6 X 134 MW Shuaiba South Power And Water Production Station (Ministry Of Electricity And Water), Kuwait Under |

|& |Annual Maintenance Contract Works. Supervising For Maintenance, Plant Shutdown Jobs For6 X 134 MW Boilers, Turbines Measuring|

|Equipment |And Controlling Instruments. |

|Dates |Jun-1992 To Dec-95. |

|Company |Integral Services Co. Wll (Isco), Kuwait |

|Customer |Ministry Of Electricity & Water, Kuwait |

| |Kuwait National Petroleum Co, Mina Al-Ahamadi Refinery, Kuwait. |

|Site |Al-Zour South Power & Water Production Station, |

| |Shuaiba South Power And Water Production Station. |

| |Mina Al-Ahamadi Refinery, |

|Position |Instrument Supervisor (Maintenance) |

|Duties |Al-Zour South Power & Water Production Station, Ministry Of Electricity & Water, Kuwait :Site Coordination And Supervising |

|& |For Annual Maintenance Jobs For 8 X 300 Mw Boilers, Turbines, Distillers, Pump House, Steam Transformers, Water Treatment, |

|Equipment |Chlorination Plant And Fire Fighting –Measuring And Controlling Instruments, Preparing Of Documents For Instrument |

| |Calibration, Report And Work Permits. |

| |Shuaiba South Power And Water Production Station. Ministry Of Electricity And Water, Kuwait.Running Plant Maintenance Of 6 X |

| |134 Mw Boiler And Turbine Measuring And Controlling Instruments. |

| |Kuwait National Petroleum Co, Mina Al-Ahamadi Refinery, Kuwait. |

| |Worked In Refinery Modernization (Rmp) Area, Ard Plant Units 41 & 42 |

| |For Plant Foster Wheeler And Cpecc Contract. |

|Dates |Aug-1991 To Apr-1992. |

|Company |National Petroleum Construction Co, (Npcc), Abu Dhabi.Uae. |

|Position |Instrument Technician |

|Duties |Installation, Cabling, Calibration, Testing And Pre-Commissioning Of Various Instruments For ABK Khuff Gas Development |

|& |Project (Offshore And Onshore Works For Wellhead Platforms) Of Abu Dhabi National Oil Company (ADNOC). |

|Equipment | |

|Dates |Apr-1989 To Aug-1991. |

|Company |Jaisun & Hutchison Controls.Pvt Ltd, India |

|Customer & |Indian Petrochemical Corporation Ltd., (Ipcl ), Gas Cracker Complex, Nagothane, India |

|Site |Lubrizol India Limited, Vashi, New Bombay,India. |

| |Ballarpur Industries Ltd., Asthi, India |

| |Manali Petrochemicals Ltd., Madras, India. |

| |Nagarjuna Fertilisers & Chemicals Ltd., Kakinada, India. |

|Position |Instrument Supervisor / Technician |

|Duties |Indian Petrochemical Corporation Ltd., (Ipcl ), Gas Cracker Complex, Nagothane, India : Involved In Erection, Calibration Of |

|& |Pneumatic And Electronic Instruments, DCS, Yew Centum System Loop Checking, Pre-Commissioning For The LDPE And Butane Plant. |

|Equipment |Lubrizol India Limited, Vashi, New Bombay : Taylor – Mod 30 System Calibration, Pre-Commissioning For The Vii/Ppd And Utility|

| |Expansion Project. |

| |Ballarpur Industries Ltd., Asthi, India : Yokogawa – Keonics, Foxbro Exact Controller 760 And 761 System Calibration, Loop |

| |Checking, Commissioning Works, Etc. |

| |Manali Petrochemicals Ltd., Madras, India.: Maintenance Contract Works For Plant Instruments. |

| |Nagarjuna Fertilisers & Chemicals Ltd., Kakinada, India. Commissioning Activities Carried Out For Toyo-Mitsubishi Boiler |

| |Control Systems. |

|Dates |Mar-1988 To Mar-1989 |

|Company |Dunlop India Ltd, India. |

|Position |Instrument Technician (App) |

|Duties |Installation, Maintenance, Testing & Calibration Of Various Plant Instruments. |

|& | |

|Equipment | |

Types Of Instruments Handled

Vast experience on Pressure, Temperature, Level, Flow, Indicators, Recorders, Controllers, Hand/Auto Stations, Modules, Counters, Transmitters, Switches, Computing Relays, I/P, P/I, P/P Converters, Gauges, Igniters, Control Valves, Shut-off Valves, Solenoid Valves, Analyzers, Fire and Gas Detection System, Hydra step System, PA System, Telemetry of various manufacturers such as Bailey, Bristol Babcock Ltd., Yokogawa (YEW) Chessell, Foxboro, Yamatake Honeywell(Yh), Kent, Clark-Reliance USA, Square ‘D Magnetrol, Acmi, Asco and Burkert, Nagano, Tokyokeiso / Kogyo Keiki / Nakakitu, Konan Zikesch, Gadelius, Kaneko,New Cosmos Electric Co. Ltd, Ness, Eurotherm, Moore, Harimann Braun, Tokyo Keisco Co., Delta Controls, Sakura Instruments, Nakakita Sfisakusho Co. Ltd, Asco Tripoint, Viking, Mobrey Magnetic, Rosemount, Taylor, Signature, Fisher, Bells, Instrumentation Ltd., For Both Electronic and Pneumatic.

Hands experience on power systems, water system, building automation system, communication system (pabx,pas,nurse call &digital call),medical gases, Fire alarm, fire protection & fire-fighting system, hvac system(chillers/air handling unit),lifts/elevators, auto claves, steam & gas sterilizers. From various manufacturers & models of Power ,Petro chemical,LNG ,Oil & Gas (On-shore & Off-shore Industry.

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download