Register of Legal and Other Requirements



|Wan Bao Construction Limited |

| |

|Register of Legal and Other Requirements |

|(LR-01) |

| |

|Revision No. : 1 |

|Date : 01 – 01 – 2006 |

|Prepared by : |Y.C. Chan |

| |(EMR) |

|Approved by : |K.T. Wong |

| |(General Manager) |

Revision History

|Revision Date |Description |Sections Affected |Revised By |Approved By |

|1/1/2006 |First issue |- |- |KT Wong |

| | | | | |

| | | | | |

| | | | | |

| | | | | |

| | | | | |

| | | | | |

| | | | | |

| | | | | |

| | | | | |

Table of Contents

A. Air Emission Control 3

B. Noise Control 12

C. Waste Management 20

D. Water Pollution Control 30

E. Dangerous Goods Management 33

F. Environmental Impact Assessment 35

G. Resources Utilisation 41

H. Others 45

Air Emission Control

1 Ordinances and Regulations

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|A2 |Air Pollution Control (Asbestos)|Provides for the qualifications and fees for registration |( |( |Demolition work for |Asbestos Investigation Report, |T2-4 |

| |(Administration) Regulation |of asbestos consultants, contractors, supervisors and | | |structures contain |Asbestos Management Plan and/or| |

| | |laboratories. | | |asbestos |Asbestos Abatement Plan | |

| | | | | | |prepared by registered asbestos| |

| | | | | | |personnel | |

|A3 |Air Pollution Control |Requires contractors to take dust reduction measures when |( |( |Dusty activities at |Notification for carrying out |G1-1 |

| |(Construction Dust) Regulation |construction work is being carried out. | | |construction sites (e.g. |notifiable works (Form NA, Cap.|G1-2 |

| | | | | |mixing of cement, vehicles|311) & |G1-3 |

| | | | | |carrying dusty materials, |Subsequent modifications (Form |G1-4 |

| | | | | |etc.) |NB, Cap. 311) |G5-1 |

| | | | | | | |G9-1 |

| | | | | | | |T3-5 |

| | | | | | | |T3-11 |

| | | | | | | |T6-7 |

| | | | | | | |T11-4 |

| | | | | | | |T25-3 |

| | | | | | | |T29-3 |

|A4 |Air Pollution Control (Dust and |Stipulates the emission standards, assessment procedures |( |( |Dusty activities at |Site inspection records |G7-3 |

| |Grit Emission) Regulations |and requirements for particulate emissions from stationary| | |construction sites (e.g. | | |

| | |combustion sources. | | |dusty emission from fuel | | |

| | | | | |burning equipment, | | |

| | | | | |generator) | | |

|A5 |Air Pollution Control (Fuel |Prohibits the use of high sulphur content solid and liquid|( |( |Use of fuels for plant / |Fuel purchasing records |G7-3 |

| |Restriction) Regulations |fuel for commercial and industrial appliances. (In | | |machinery at construction | | |

| | |Shatin, only gaseous fuel is allowed except for the | | |sites (e.g. generator, | | |

| | |appliances used in construction sites or for emergency | | |excavators, cranes, etc.) | | |

| | |purposes.) | | | | | |

|A6 |Air Pollution Control (Motor |Sets out the specifications of motor vehicle fuel to be |( |( |Use of fuel for vehicles |Fuel purchasing records |V-2 |

| |Vehicle Fuel) Regulation |used in motor vehicles and prohibits the sale of leaded | | | | | |

| | |petrol. | | | | | |

|A7 |Air Pollution Control (Open |Prohibits open burning of construction waste, tyres and |( |( |Construction sites (e.g. |Site inspection records | |

| |Burning) Regulation |cables for metal salvage, and controls other open burning | | |burning of tyres and | | |

| | |activities by permit system. | | |cables for metal salvage) | | |

|A8 |Air Pollution Control (Smoke) |Restricts emission of dark smoke from stationary |( |( |Use of diesel-powered |Site inspection records |G7-3 |

| |Regulation |combustion sources. | | |plants / equipments | | |

|A9 |Technical Memorandum for Issuing|Specifies principles, methods, standards and guidelines |( |( |Same as above |N/A |G6-1 |

| |Air Pollution Abatement Notices |for assessing air pollution from stationary polluting | | | | |G7-3 |

| |to Control Air Pollution from |sources. | | | | |G9-3 |

| |Stationary Polluting Process | | | | | |T5-3 |

| | | | | | | |T13-11 |

| | | | | | | |T16-5 |

|A10 |Ozone Layer Protection Ordinance|To give effect to Hong Kong's international obligations |( |( |Use of refrigerants for |By demonstration the types of |OF-6 |

| |(Cap. 403) |under the 1985 Vienna Convention for the Protection of the| | |air-conditioning (A/C) |substances used |SP-12 |

| | |Ozone Layer and the 1987 Montreal Protocol on Substances | | |units (e.g. R-22) & fire | |V-6 |

| | |that Deplete the Ozone Layer; to provide for the | | |extinguishers (contained | |T10-2 |

| | |prohibition of the manufacture of, and to control the | | |CFC) | | |

| | |importation and exportation of, and to conserve the | | | | | |

| | |resources of, substances that deplete the ozone layer and | | | | | |

| | |of products containing or made with those substances; and | | | | | |

| | |to provide for related matters. | | | | | |

|A11 |Ozone Layer Protection |Requires the conservation of controlled refrigerants used |( |( |Use of refrigerants for |By demonstration the types of |OF-6 |

| |(Controlled Refrigerants) |in large from all countries, scale installations and motor| | |A/C units (e.g. R-22) & |substances used |SP-12 |

| |Regulation |vehicles. | | |fire extinguishers | |V-6 |

| | | | | |(contained CFC) | |T10-2 |

|A12 |Ozone Layer Protection (Products|Prohibits the import of portable fire extinguishers |( |( |Use of refrigerants for |By demonstration the types of |OF-6 |

| |Containing Scheduled Substances)|containing halons and other controlled products from a | | |A/C units (e.g. R-22) & |substances used |SP-12 |

| |(Import Banning) Regulation |country or place not a party to the Montreal Protocol | | |fire extinguishers | |V-6 |

| | |unless the Authority considers that it complies with the | | |(contained CFC) | |T10-2 |

| | |requirements of the Protocol. | | | | | |

|A13 |Road Traffic Ordinance (Cap. |Regulates road traffic, vehicles and users of roads and |( |( |Use of vehicles (e.g. |Checking records for the |V-4 |

| |374) |related matters; includes provisions to limit pollution | | |exhaust black smoke) |vehicles |G8-4 |

| | |from vehicles. | | | | | |

|A14 |Road Traffic (Construction and |Specifies smoke levels for in-service vehicles. |( |( |Use of vehicles (e.g. |Checking records for the |V-4 |

| |Maintenance of Vehicles) | | | |exhaust black smoke) |vehicles |G8-4 |

| |Regulations | | | | | | |

2 Other Requirements

1 Code of Practice

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|A16 |Code of Practice on Asbestos |Provides guidance and advice to registered asbestos |( |( |Demolition work for |Asbestos Investigation Report, |T2-4 |

| |Control – Asbestos Work Using |consultants, contactors, supervisors and laboratories on | | |structures contain |Asbestos Management Plan and/or| |

| |Full Containment or Mini |asbestos work using full containment or mini containment | | |asbestos |Asbestos Abatement Plan | |

| |Containment Method [Source: |method. | | | |prepared by registered asbestos| |

| |Environmental Protection | | | | |personnel | |

| |Department] | | | | | | |

|A17 |Code of Practice for the |Provides practical guidelines for the proper design, |( |( |Building design : design |Design evidence |D-5 |

| |Prevention of Legionnaires’ |operation and maintenance of the related facilities to | | |of ventilation systems. | | |

| |Disease in Hong Kong (Source : |prevent the possible outbreak of Legionnaires' Disease. | | | | | |

| |Electrical & Mechanical, Service| | | | | | |

| |Department) | | | | | | |

2 Professional Guidelines

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|A19 |ProPECC Practice Note PN 2/96 |Provides guidance on the control of air pollution in car |( |( |Architectural Design for |Architectural design records |D-1 |

| |Control of Air Pollution in Car |parks including: | | |car parks | |D-5 |

| |Parks |air quality guidelines required for the protection of | | | | | |

| | |public health and factors that should be considered in the| | | | | |

| | |design and operation of car parks in order to achieve the | | | | | |

| | |required air quality. | | | | | |

|A20 |ProPECC Practice Note PN 2/97 |Gives guidance to the professional persons on the basic |( |( |Demolition work for |Asbestos Investigation Report, |T2-4 |

| |Handling of Asbestos Containing |precautionary measures commonly applicable to asbestos | | |structures contain |Asbestos Management Plan and/or| |

| |Materials in Buildings |abatement work, and the general approaches in management | | |asbestos |Asbestos Abatement Plan | |

| | |of asbestos in existing buildings. They may also find it | | | |prepared by registered asbestos| |

| | |useful for works in ships and in civil and construction | | | |personnel | |

| | |works such as their involving water pipes containing | | | | | |

| | |asbestos. | | | | | |

|A21 |ProPECC Practice Note PN 1/98 |Sets out the air quality guidelines for public transport |( |( |Architectural Design for |Architectural design records. |D-1 |

| |Control of Air Pollution in |interchanges (PTI) at semi-confirmed locations, and | | |semi-confined public | |D-5 |

| |Semi-Confined Public Transport |outlines major considerations for designing and operating | | |transport interchange | | |

| |Interchanges |a PTI to meet the guidelines. | | | | | |

|A22 |ProPECC Practice Note PN 1/99 |Provides guidance to the professional persons on the |( |( |Building design, selection|Building design records. |D-1 |

| |Control of Radon Concentration |reduction of non-occupational radon exposure in new | | |of materials | |D-5 |

| |in New Buildings |buildings and sets out (i) the radon concentration limit | | | | | |

| | |for protection of the public health; (ii) factors to be | | | | | |

| | |considered for the design of new ventilation systems and | | | | | |

| | |buildings and mitigation measures; and (iii) the | | | | | |

| | |measurement protocols in the Appendices. | | | | | |

3 Technical Circular

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|A24 |ETWBTC No. 14/94 Use of PFA as |Promulgate the inclusion of suitable provisions in |( |( |Use of PFA |Trip tickets |T3-14 |

| |General Fill in Reclamations |reclamation contracts involving public dumping. It aims | | | | | |

| |[Source: Environment, Transport |at reducing unsightly pollution and at savings in | | | | | |

| |and Works Bureau] |Government resources used to collect and dispose of the | | | | | |

| | |floating refuse. | | | | | |

|A25 |ETWBTC No. 18/99 Particular |Promulgates a standard Particular Specification clause |( |( |Vehicles Carrying Dusty |Monitoring records. |G1-1 |

| |Specification Clause for |requiring vehicles carrying dusty materials to be properly| | |Materials | |G1-2 |

| |Vehicles Carrying Dusty |covered up before leaving the Site. | | | | |G5-1 |

| |Materials [Source: Environment, | | | | | |G9-1 |

| |Transport and Works Bureau] | | | | | | |

|A26 |Practice Note for Authorized |Construction sites if not properly managed may become the |( |( |Activities causing |Monitoring records. |G6-1 |

| |Persons and Registered |source of serious environmental nuisance and related | | |environmental nuisance | | |

| |Structural Engineers (PNAP) 144 |pollution affecting not only the workers on site but also | | |(noise, air, water, | | |

| |Control of Environmental |adjoining occupants and the general public. Authorized | | |health, associated with | | |

| |Nuisance from Construction Sites|persons and registered structural engineers are therefore | | |drains, roads / footpaths,| | |

| |[Source: Buildings Department] |strongly urged to take appropriate steps to minimize the | | |hoardings / covered | | |

| | |impact of construction activities on the surrounding | | |walkways) | | |

| | |environment. | | | | | |

|A27 |PNAP 114 Asbestos [Source: |Exposure to asbestos is hazardous to health. As a general |( |( |Design and construction of|Design records. |D-5 |

| |Buildings Department] |rule, all persons involved in the design and construction | | |buildings using asbestos | | |

| | |of buildings should avoid the use of asbestos containing | | | | | |

| | |material (ACM) in new buildings and handle the removal of | | | | | |

| | |ACM from existing buildings with caution. | | | | | |

|A28 |Guidance notes for management of|Guidelines for the total management of indoor air quality.|( |( |Design on the provision of|Monitoring records for indoor |OF-9 |

| |Indoor Air Quality in office and|It is designed to enable owner/management of | | |ventilation system. |area and HVAC. | |

| |public places (Source : |premises/building to prevent and successfully manage most | | | | | |

| |Environment, Transport and Works|of the common indoor air quality problems encountered in | | | | | |

| |Bureau) |buildings in Hong Kong, for the health and well-being of | | | | | |

| | |all. | | | | | |

Noise Control

1 Ordinances and Regulations

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|B2 |Noise Control (Construction |Controls construction noise from (a) the use of powered |( |( |Noise from construction |Construction Noise Permit (CNP)|G2-1 |

| |Work) Regulation; |mechanical equipment; and (b) the carrying out of certain | | |operations (e.g. noise |Noise measurement records for |G7-4 |

| |Noise Control (Construction Work|noisy works in designated areas, between 7 p.m. and 7 a.m.| | |from percussive piling, |construction works |T3-12 |

| |Designated Areas) Notice; |and on general holidays, by construction noise permits. | | |noise from excavation, air| |T11-3 |

| | |Director of Environmental Protection issues permit in | | |compressors, plant | |T29-4 |

| | |accordance with two relevant statutory Technical | | |operations, etc.) | | |

| | |Memoranda. | | | | | |

|B3 |Noise Control (Hand Held |Controls the import, manufacture, supply and use of hand |( |( |Use of hand held |Noise labels on plants |G2-1 |

| |Percussive Breakers) Regulations|held percussive breakers and portable air compressors. | | |percussive breakers and |concerned |G7-4 |

| |Noise Control (Air Compressors) |Requires such noisy construction equipment to comply with | | |air compressors | | |

| |Regulations |a stringent noise emission standard and be fitted with a | | | | | |

| | |noise emission label issued by the Director of | | | | | |

| | |Environmental Protection before use. | | | | | |

|B4 |Noise Control (Motor Vehicles) |Requires all motor vehicles, including buses, commercial |( |( |Use of vehicles |Vehicle registration. |V-3 |

| |Regulation |vehicles, lorries & motorcycles, first registered in Hong | | | | |G2-1 |

| | |Kong to meet with stringent noise emission standards. | | | | |G8-2 |

|B5 |Road Traffic (Construction and |The regulations prohibit the use of motor vehicles without|( |( |Use of vehicles |Monitoring Record |V-3 |

| |Maintenance of Vehicles) |silencers or with a modified or defective silencer. | | | | |G2-1 |

| |Regulation | | | | | |G8-2 |

|B6 |Factories and Industrial |Controls noise generated inside a factory or other |( |( |Noise at work affecting |Monitoring Record |G2-1 |

| |Undertakings Ordinance (Cap. 59)|industrial undertaking which affects employees in the work| | |workers (piling, air | |G7-4 |

| |Factories and Industrial |place | | |compressor, hand-held | |T3-12 |

| |Undertakings (Noise at Work) | | | |breakers, etc ) | |T11-3 |

| |Regulations | | | | | |T29-4 |

| |Occupational Safety and Health | | | | | | |

| |Ordinance (Cap. 509) | | | | | | |

2 Other Requirements

1 Technical Memorandum

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|B8 |Technical Memorandum on Noise |for the assessment of noise from construction work other |( |( |Noise from construction |Construction Noise Permit (CNP)|G2-1 |

| |from Construction Work Other |than percussive piling; for the issuing of Construction | | |operations (e.g. noise |Noise measurement records for |G7-4 |

| |Than Percussive Piling |Noise Permits for construction work other than percussive | | |from excavation, air |construction works |T3-12 |

| | |piling pursuant to section 8 of the Ordinance; and for | | |compressors, plant | |T11-3 |

| | |determining whether or not any such Construction Noise | | |operations, etc.) | |T29-4 |

| | |Permit is being complied with. | | | | | |

|B9 |Technical Memorandum on Noise |for the assessment of noise and issuing of Construction |( |( |Noise from construction |Construction Noise Permit (CNP)|G2-1 |

| |from Construction Work in |Noise Permit for construction work within a designated | | |operations (e.g. noise |Noise measurement records for |G7-4 |

| |Designated Areas |area involving the use of specified powered mechanical | | |from excavation, air |construction works |T3-12 |

| | |equipments other than percussive piling and/or the | | |compressors, plant | |T11-3 |

| | |carrying out of prescribed construction works. | | |operations, etc.) | |T29-4 |

|B10 |Technical Memorandum on Noise |for determining (on the basis of the calculated noise |( |( |Noise from construction |Construction Noise Permit (CNP)|T4-3 |

| |from Percussive Piling |level) any permitted hours of operation for percussive | | |operations (e.g. noise |Noise measurement records for |T4-7 |

| | |piling; for the issuing of Construction Noise Permits for | | |from percussive piling) |construction works |G2-1 |

| | |percussive piling; and for determining whether or not any | | | | |G7-4 |

| | |Construction Noise Permit for percussive piling is being | | | | | |

| | |complied with. | | | | | |

2 Professional Guidelines

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|B12 |ProPECC Practice Note PN 2/93 |Set out the assessment criteria as well as requirements |( |( |Noise from construction |Construction Noise Permit (CNP)|G2-1 |

| |Noise from Construction |relating to construction noise not currently controlled | | |operations (e.g. noise |Noise measurement records for |G7-4 |

| |Activities – Non-statutory |under the Noise Control Ordinance. These requirements | | |from percussive piling, |construction works |T3-12 |

| | |will, however, from the basis of impending controls and | | |noise from excavation, air| |T11-3 |

| | |are being incorporated in all Environmental Impact | | |compressors, plant | |T29-4 |

| | |Assessments and serve as a guide to engineers and others | | |operations, etc.) | | |

| | |in meeting the requirement, of the relevant professional | | | | | |

| | |Institution, to take full account of environmental matters| | | | | |

| | |in the exercise of their professional duties. | | | | | |

|B13 |ProPECC Practice Note PN 4/93 |Draw to the attention of practising professional, |( |( |Construction Design to |Design records. |D-2 |

| |Planning and Design Noise |requirements that have been introduced to reduce the | | |reduce noise to sensitive | |D-5 |

| |Sensitive Developments |adverse effects of existing noise sources on new noise | | |receivers | | |

| | |sensitive developments and suggest practical measures that| | | | | |

| | |can be taken at the early planning and design stages to | | | | | |

| | |achieve an acceptable noise environment in new noise | | | | | |

| | |sensitive developments. | | | | | |

|B14 |ProPECC Practice Note PN 1/96 |Many road breaking operations, especially on heavily |( |( |Selection of quiet |Monitoring records. |G2-1 |

| |Use of Quieter Construction |trafficked road, have to be performed at night to avoid | | |equipment and plant (e.g.,| |G7-4 |

| |Equipment for Road Opening Works|traffic congestion during the day. Road breaking works | | |air compressor, | | |

| |during Non-sociable hours |using conventional breakers are particularly disturbing | | |generators, breaker, etc.)| | |

| | |and are the subject of many noise complaints, particularly| | | | | |

| | |with respect to sleep disturbance. The adoption of quieter| | | | | |

| | |construction methods and equipment can provide worthwhile | | | | | |

| | |reduction in the nuisance caused by road breaking | | | | | |

| | |operation. | | | | | |

|B15 |ProPECC Practice Note PN 1/97 |Assist Authorized Persons (AP) and related professionals |( |( |Residential development |Self-assessment to plan for |D-2 |

| |Streamline Approach for the |in making applications relating to residential | | |planning |residential development. |D-5 |

| |Planning of Residential |developments having regards to the road traffic noise | | | | | |

| |Developments Against Road |limit of the Hong Kong Planning Standards and Guidelines | | | | | |

| |Traffic Noise |(HKPSG). | | | | | |

3 Technical Circular

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|B17 |PNAP 144 Control of |Construction sites if not properly managed may become the |( |( |Activities causing |Monitoring records. |G2-1 |

| |Environmental Nuisance from |source of serious environmental nuisance and related | | |environmental nuisance | |G7-4 |

| |Construction Sites [Source: |pollution affecting not only the workers on site but also | | |(noise, air, water, | |T3-12 |

| |Buildings Department] |adjoining occupants and the general public. Authorized | | |health, associated with | |T4-3 |

| | |persons and registered structural engineers are therefore | | |drains, roads / footpaths,| |T4-7 |

| | |strongly urged to take appropriate steps to minimize the | | |hoardings / covered | |T4-12 |

| | |impact of construction activities on the surrounding | | |walkways) | |T11-3 |

| | |environment. | | | | |T29-4 |

|B18 |PNAP 228 Noise Annoyance |Sets out guidelines regarding design measures to be |( |( |Pump room and ventilation |Pump room and ventilation |D-2 |

| |Prevention Design of Pump Room |adopted and installed to prevent possible noise problem | | |system design |system design drawings |D-5 |

| |and Ventilation System [Source: | | | | | | |

| |Buildings Department] | | | | | | |

Waste Management

1 Ordinances and Regulations

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

| | | | | | | | |

|C2 |Waste Disposal (Chemical Waste) |Provides for control of all aspects of chemical waste |( |( |Chemical waste from |Chemical Waste Producer License|V-7 |

| |(General) Regulation |disposal, including storage, collection, transport, | | |construction works (e.g. | |G1-9 |

| | |treatment and final disposal. | | |spent lube oil, hydraulic |Trip tickets from chemical |G4-5 |

| | | | | |oil, spent paints, empty |waste disposal facilities |G9-7 |

| | | | | |chemical containers, etc.)|Site inspection records |G9-8 |

| | | | | | | |G10-11 ( |

| | | | | | | |G10-12 ( |

| | | | | | | |T25-10 |

|C3 |Waste Disposal (Charges for |Requires payment of charges for disposal of chemical waste|( |( |Chemical waste from |Trip tickets |V-7 |

| |Disposal of Chemical Waste) |at the Chemical Waste Treatment Centre, thus creating an | | |construction works (e.g. | |G1-9 |

| |Regulation |economic incentive towards waste minimisation. | | |spent lube oil, hydraulic | |G4-5 |

| | | | | |oil, spent paints, empty | |G9-7 |

| | | | | |chemical containers, etc.)| |G9-8 |

| | | | | | | |G10-11( |

| | | | | | | |G10-12( |

| | | | | | | |T25-10 |

|C4 |Waste Disposal (Charges for |Requires payment of charges for disposal of waste at |( |( |Waste disposal to |Trip tickets |G1-8 |

| |Disposal of Waste) Regulation |landfills, thus creating an economic incentive towards | | |landfills | |G9-9 |

| | |waste minimisation. | | | | |G9-10 |

| | | | | | | |G9-11 |

| | | | | | | |T25-5 |

|C5 |Dumping At Sea Ordinance (Cap. |Controls marine dumping, extents control on marine |( |( |Waste disposal at sea |Dumping permit |G9-9 |

| |466) |pollution by a permit system. | | | | |G9-10 |

|C6 |Shipping and Port Control |Prohibits pollution of the sea by oil from land-based as | |( |Marine work |Inspection records |G9-9 |

| |Ordinance (Cap. 313) |well as marine sources, and also the dumping of refuse and| | | | |G9-10 |

| | |general littering from vessels or port based operations. | | | | | |

|C7 |Merchant Shipping (Prevention |Provides for the prevention and control of pollution from | |( |Marine work |Inspection records |T27-13 |

| |and Control of Pollution) |ships | | | | | |

| |Ordinance (Cap. 413) | | | | | | |

2 Other Requirements

1 Code of Practice

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|C9 |Code of Practices on the |Gives guidance to persons who may come into contact with |( |( |Handling of asbestos waste|Site inspection records |T2-5 |

| |Handling, Transport and Disposal|asbestos waste on the safe handling of asbestos waste and | | | | | |

| |of Asbestos Waste [Source: |how they can comply with the legislative controls. | | | | | |

| |Environmental Protection | | | | | | |

| |Department] | | | | | | |

2 Professional Guidelines

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|C11 |A Guide to the Registration of |To introduce the registration provisions of the Waste |( |( |Disposal of chemical waste|Chemical Waste Producer License|V-7 |

| |Chemical Waste Producers |Disposal (Chemical Waste) (General) Regulation and the | | |(e.g. spent lub oil, | |G1-9 |

| |[Source: Environmental |procedure for identifying chemical waste generation. | | |paint, etc.). |Trip tickets from chemical |G4-5 |

| |Protection Department] | | | | |waste disposal facilities |G9-7 |

| | | | | | | |G9-8 |

| | | | | | | |G10-11 ( |

| | | | | | | |G10-12 ( |

| | | | | | | |T25-10 |

|C12 |ProPECC Practice Note PN 3/94 |Sets out the requirements for proper assessment and |( |( |Cleanup contaminated land |Site assessment |T3-9 |

| |Contaminated Land Assessment and|management of potentially contaminated sites; provides | | | |Land sampling test records | |

| |Remediation [Source: |guidelines on how site assessment should be conducted; and| | | | | |

| |Environmental Protection |suggest practical remedial measures that can be adopted | | | | | |

| |Department] |for the clean-up of a contaminated site. | | | | | |

3 Technical Circular

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|C14 |ETWBTC No. 11/2002 Control of |The circumstances in which site crushers, which are |( |( |Use of site crushers |Monitoring records |G9-9 |

| |Site Crushers [Source: |ancillary rock crushing plants, may be used in the | | | | |G9-11 |

| |Environment, Transport and Works|projects and the approval procedures are described in this| | | | | |

| |Bureau] |Circular. | | | | | |

|C15 |ETWBTC No. 12/2002 Specification|Promulgates the particular specifications to facilitate |( |( |Use of recycled aggregates|Monitoring records |SP-9 |

| |Facilitating the Use of Recycled|the use of recycled aggregates in concrete production, and| | | | | |

| |Aggregates [Source: Environment,|construction of road sub-base in PWP projects. | | | | | |

| |Transport and Works Bureau] | | | | | | |

|C16 |ETWBTC No. 21/2002 Trip-ticket |Promulgates the auditing requirements for the |( |( |Disposal of construction |Trip tickets |G9-9 |

| |System for Disposal of |implementation of the trip-ticket system in PWP contracts | | |and demolition material at|Monitoring records |G9-10 |

| |Construction and Demolition |for proper disposal of construction and demolition (C&D) | | |public filling facilities | |G9-11 |

| |Material [Source: Environment, |material at public filling facilities or landfills | | |or landfills | |T7-7 |

| |Transport and Works Bureau] | | | | | |T25-5 |

|C17 |ETWBTC No. 33/2002 Management of|Introduces measures to enhance the management of |( |( |Use of C&D material |Monitoring records |G9-9 |

| |Construction and Demolition |construction and demolition (C&D) material including rock | | | | |G9-10 |

| |Material Including Rock [Source:|in public works projects. | | | | |G9-11 |

| |Environment, Transport and Works| | | | | |T7-7 |

| |Bureau] | | | | | |T25-5 |

|C18 |ETWBTC No. 34/2002 Management of|Sets out the procedure for seeking approval to |( |( |Management of dredged / |Monitoring records |G9-9 |

| |Dredged / Excavated Sediment |dredge/excavate sediment and the management framework for | | |excavate sediments | |G9-10 |

| |[Source: Environment, Transport |marine disposal of such sediment. | | | | | |

| |and Works Bureau] | | | | | | |

|C19 |ETWBTC No. 15/2003 Waste |Sets out the policy and procedures requiring contractors |( |( |All aspects in waste |Waste Management Plan |G1-8 |

| |Management on Construction Sites|to prepare and implement an enhanced Waste Management Plan| | |disposal for construction | |G9-9 |

| |[Source: Environment, Transport |(WMP) to encourage | | |sites. | |G9-10 |

| |and Works Bureau] |on-site sorting of Construction and Demolition (C&D) | | | | |G9-11 |

| | |materials and to minimize the generation during the course| | | | |T7-7 |

| | |of construction. | | | | |T25-5 |

|C20 |PNAP 144 Control of |Construction sites if not properly managed may become the |( |( |Activities causing |Monitoring records. |G1-8 |

| |Environmental Nuisance from |source of serious environmental nuisance and related | | |environmental nuisance | |G9-9 |

| |Construction Sites [Source: |pollution affecting not only the workers on site but also | | |(noise, air, water, | |G9-10 |

| |Buildings Department] |adjoining occupants and the general public. Authorized | | |health, associated with | |G9-11 |

| | |persons and registered structural engineers are therefore | | |drains, roads / footpaths,| |G9-12 |

| | |strongly urged to take appropriate steps to minimize the | | |hoardings / covered | |G9-13 |

| | |impact of construction activities on the surrounding | | |walkways) | |G9-14 |

| | |environment. | | | | |G9-15 |

| | | | | | | |T7-7 |

| | | | | | | |T25-5 |

| | | | | | | |(not exclusive)|

|C21 |PNAP 155 Marine Disposal of |Outlines the procedures to be followed for private works |( |( |Disposal of dredged |Monitoring records |G9-9 |

| |Dredged Mud [Source: Buildings |projects which involve the marine disposal of mud whether | | |materials to the sea. | |G9-10 |

| |Department] |uncontaminated or contaminated, in Gazetted marine | | | | | |

| | |disposal grounds or exhausted marine borrow pits. It | | | | | |

| | |explains the responsibilities of the Environmental | | | | | |

| | |Protection Department (EPD) and the Civil Engineering | | | | | |

| | |Department (CED). | | | | | |

|C22 |PNAP 243 Construction and |The landfills used for disposal of solid waste are being |( |( |Disposal of construction |Waste management plan |G9-9 |

| |Demolition Waste [Source: |filled up at an alarming rate. Careful consideration given| | |and demolition waste |Trip tickets |G9-10 |

| |Buildings Department] |to waste generation and management at the planning stage | | | | |G9-11 |

| | |of a building development will lead to less waste later on| | | | |T7-7 |

| | |for disposal at landfills. | | | | |T25-5 |

|C23 |PNAP 252 Management Framework |This practice note is issued to provide information on the|( |( |Disposal of dredged |Monitoring records |G9-9 |

| |for Disposal of |management framework for dredged/excavated sediment | | |materials to the sea. | |G9-10 |

| |Dredged/Excavated Sediment |disposal under the Dumping at Sea Ordinance, Cap. 466 | | | | | |

| |[Source: Buildings Department] |(DASO). It states the requirements for justifying the need| | | | | |

| | |for dredging and provides guidance for the authorized | | | | | |

| | |persons/registered structural engineers (AP/RSE) on how to| | | | | |

| | |obtain information on the sediment, which can then be used| | | | | |

| | |for supporting the permit application by the contractors | | | | | |

| | |and/or other parties responsible for the disposal. It also| | | | | |

| | |describes the classification of sediment into three | | | | | |

| | |categories based on their contaminant levels, outlines the| | | | | |

| | |procedures for assessing sediment quality and explains the| | | | | |

| | |marine disposal arrangements for the different sediment | | | | | |

| | |categories. | | | | | |

|C24 |PNAP 275 Use of Recycled |To reduce the pressure on the demand of public filling and|( |( |Use of recycled aggregates|Material consumption records |SP-9 |

| |Aggregated in Concrete [Source: |landfill capacity, one of the means of resource | | | | | |

| |Buildings Department] |conservation and waste minimization is to recycle hard and| | | | | |

| | |inert construction and demolition (C&D) materials, such as| | | | | |

| | |broken rock and concrete, into aggregates and put them | | | | | |

| | |into good use. This PNAP sets out the technical guidelines| | | | | |

| | |for using recycled aggregates in prescribed mix concrete | | | | | |

| | |of specified grade strength of 20P and designed mix | | | | | |

| | |concrete of specified grade strengths of 25D to 35D. | | | | | |

|C25 |PNAP 268 Resident Supervision |Puts forward new requirements on resident supervision and |( |( |Management of debris in |Monitoring records |T2-1 – 8 |

| |and Debris Management System for|debris management for demolition work. | | |demolition work | | |

| |Demolition Works [Source: | | | | | | |

| |Buildings Department] | | | | | | |

Water Pollution Control

1 Ordinances and Regulations

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

| |Water Pollution Control |Gives practical effect to the ordinance | | | | | |

| |(General) Regulations | | | | | | |

| |Technical Memorandum Standards |Specifies legal limits for quality (physical, chemical and| | | | | |

| |for Effluents Discharged into |microbial) of effluent discharged into foul sewers, storm | | | | | |

| |Drainage and Sewerage Systems, |water drains, inland and coastal waters. | | | | | |

| |Inland and Coastal Waters | | | | | | |

| |(Cap 358AK) | | | | | | |

|D2 |Shipping and Port Control |Prohibits pollution of the sea by oil or mixture | |( |Marine work |Inspection records |G9-9 |

| |Ordinance (Cap. 313) |containing oil from land-based as well as marine sources, | | | | |G9-10 |

| | |and also the dumping of refuse and general littering from | | | | | |

| | |vessels or port-based operations. | | | | | |

|D3 |Sewage Services Ordinance (Cap. |Provides for the imposition of sewage charges and trade |( |( |Wastewater discharge |Sewage charge bill |G10-1 – 5 |

| |463) |effluent surcharges and other related matters. | | | | |G10-8 |

| | | | | | | |T25-4 |

| | | | | | | |T25-9 |

|D4 |Waterworks Ordinance (Cap.102) |Prohibits polluting discharges in water gathering grounds.|( |( |Earth work and drainage |Inspection records |G10-1 – 5 |

| | | | | |work | |G10-8 |

|D5 |Buildings (Demolition Works) |Regulates building demolition, including the sealing of |( |( |Design and operations of |Inspection records |T2-6 |

| |Regulations |all sewers and drainage connections before demolition | | |demolition work | | |

2 Other Requirements

1 Professional Guidelines

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|D7 |ProPECC Practice Note PN 3/97 A |Drainage plan of development projects submitted to the |( |( |Drainage plan of |Drainage plan of development |G10-1 – 5 |

| |Revised Streamlined Approach for|Building Department are referred to the EPD for comment | | |development projects |projects |G10-8 |

| |vetting of Drainage Plans |whenever there is a concern for pollution control. | | | | | |

| |Referred to EPD for Comments | | | | | | |

| |[Source: Environmental | | | | | | |

| |Protection Department] | | | | | | |

|D8 |PNAP 144 Control of |Construction sites if not properly managed may become the |( |( |Activities causing |Monitoring records. |G10-1 – 5 |

| |Environmental Nuisance from |source of serious environmental nuisance and related | | |environmental nuisance | |G10-8 |

| |Construction Sites [Source: |pollution affecting not only the workers on site but also | | |(noise, air, water, | |T25-4 |

| |Buildings Department] |adjoining occupants and the general public. Authorized | | |health, associated with | | |

| | |persons and registered structural engineers are therefore | | |drains, roads / footpaths,| | |

| | |strongly urged to take appropriate steps to minimize the | | |hoardings / covered | | |

| | |impact of construction activities on the surrounding | | |walkways) | | |

| | |environment. | | | | | |

Dangerous Goods Management

1 Ordinances and Regulations

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|E2 |Pesticides Ordinance (Cap. 133) |Controls the supply and use of agricultural pesticides. |( |( |Pest control |Types of pesticides use for |OF-17 |

| | | | | | |landscaping and pest control | |

| | | | | | |activities. | |

2 Other Requirements

1 Professional Guidelines

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

Environmental Impact Assessment

1 Ordinances and Regulations

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

4 Other Requirements

1 Technical Memorandum

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

2 Professional Guidelines

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|F5 |EIAO Guidance Notes (GN1/2002): |Sets out some common basic principles of the Environmental|( |( |Designated Projects |EIA |Various aspects|

| |EIA Principles |Impact Assessment (EIA) process. The purpose of the EIA | | | |EM&A and/or other manuals |will be covered|

| | |process is to protect the environment through prevention. | | | |and/or plans required under the|under permit |

| | | | | | |Environmental Permit |condition. |

|F6 |EIAO Guidance Notes (GN2/2002): |Project proponents are encouraged to have dialogues at the|( |( |Designated Projects |EIA |Various aspects|

| |Environmental Study Management |early planning stages to exchange views on preparation of | | | |EM&A and/or other manuals |will be covered|

| |Group |Environmental Impact Assessment (EIA) reports, especially | | | |and/or plans required under the|under permit |

| | |about the consideration of possible alternatives, any | | | |Environmental Permit |condition. |

| | |major environmental concerns, and the likely | | | | | |

| | |environmentally friendly designs. | | | | | |

|F7 |EIAO Guidance Notes (GN3/2002): |Provides potential applicants, project proponents, |( |( |Designated Projects |EIA |Various aspects|

| |Mitigation Measures |environmental consultants and members of the public with | | | |EM&A and/or other manuals |will be covered|

| | |some guiding principles on the approach to assess the | | | |and/or plans required under the|under permit |

| | |recommended environmental mitigation measures in | | | |Environmental Permit |condition. |

| | |Environmental Impact Assessment (EIA) reports. | | | | | |

|F8 |EIAO Guidance Notes (GN4/2002): |Sets out some basic requirements and duties of the |( |( |Designated Projects |EIA |Various aspects|

| |Independent Environmental |Independent Environmental Checker (IEC) in the | | | |EM&A and/or other manuals |will be covered|

| |Checker |verification and validation of the environmental | | | |and/or plans required under the|under permit |

| | |performance of an designated project from the issue of its| | | |Environmental Permit |condition. |

| | |environmental permit. | | | | | |

|F9 |EIAO Guidance Notes (GN5/2002): |Provides potential applicants, project proponents, |( |( |Designated Projects |EIA |Various aspects|

| |Implementation Schedule |environmental consultants and contractors with specific | | | |EM&A and/or other manuals |will be covered|

| | |guidelines on the use and the format of the implementation| | | |and/or plans required under the|under permit |

| | |schedule as a tool and an output of an Environmental | | | |Environmental Permit |condition. |

| | |Impact Assessment (EIA) study to present and summarize the| | | | | |

| | |recommended environmental mitigation measures. | | | | | |

|F10 |EIAO Guidance Notes (GN6/2002): |Although the Environmental Impact Assessment (EIA) |( |( |Designated Projects |EIA |Various aspects|

| |Ecological Assessment |Ordinance - Technical Memorandum on Environmental Impact | | | |EM&A and/or other manuals |will be covered|

| | |Assessment Process (TM), particularly Annexes 8 and 16, | | | |and/or plans required under the|under permit |

| | |has sought to provide some guidance on conducting | | | |Environmental Permit |condition. |

| | |ecological assessment, there are many areas which may | | | | | |

| | |require further elaboration. This guidance note serves to| | | | | |

| | |clarify the requirements and share our experience with all| | | | | |

| | |practitioners. | | | | | |

|F11 |EIAO Guidance Notes (GN7/2002): |Providing the general guidelines for conducting an |( |( |Designated Projects |EIA |Various aspects|

| |Ecological Baseline Survey |ecological baseline survey in order to fulfil the | | | |EM&A and/or other manuals |will be covered|

| | |requirements stipulated in the TM in respect of ecological| | | |and/or plans required under the|under permit |

| | |assessment for a proposed development. | | | |Environmental Permit |condition. |

|F12 |EIAO Guidance Notes (GN8/2002): |Advises on the requirements in vetting Landscape and |( |( |Designated Projects |EIA |Various aspects|

| |Landscape and Visual Impact |Visual Impact Assessment (LVIA) of designated projects | | | |EM&A and/or other manuals |will be covered|

| |Assessment |(DPs) under the Technical Memorandum on EIA Process (TM) | | | |and/or plans required under the|under permit |

| | |for the Environmental Impact Assessment (EIA) Ordinance. | | | |Environmental Permit |condition. |

| | |The main aim is to facilitate practitioners to prepare | | | | | |

| | |LVIA and to satisfy their own Quality Management System | | | | | |

| | |prior to making submissions under the EIA Ordinance. | | | | | |

3 Technical Circular

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

Resources Utilisation

1 Other Requirements

1 Technical Circular

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|G2 |ETWBTC No. 2/97 Use of PFA in |Promulgates the mandatory use of pulverised fuel ash (PFA,|( |( |Use of PFA in concrete |Material procurement records |T10 |

| |Concrete Pile Caps and |also known as pulverised fly ash) in both thick concrete | | |pile caps and | | |

| |Substructures [Source: |pile caps and substructures. It should be read in | | |substructures | | |

| |Environment, Transport and Works|conjunction with Works Branch Technical Circular No. | | | | | |

| |Bureau] |14/90. | | | | | |

|G3 |ETWBTC No. 4/98A Use of Public |Promulgates policy requiring reclamation or earth filling |( |( |Disposal of construction |Trip tickets |T27 |

| |Fill in Reclamation and Earth |projects with imported fill requirements of 300,000 m3 | | |and demolition materials | |T3-14 |

| |Filling Projects [Source: |(three hundred thousand cubic metres) or more to consider | | |for beneficial use | | |

| |Environment, Transport and Works|using public fill (alternatively termed inert construction| | | | | |

| |Bureau] |and demolition (C&D) material) for the Works. | | | | | |

|G4 |ETWBTC No. 19/2001 Metallic Site|Establishes the revised policy requiring the use of |( |( |Design the site hoardings |Materials procurement records |T3-1 |

| |Hoardings and Signboards |metallic site hoardings and signboards, in order to reduce| | |and signboards | |T3-4 |

| |[Source: Environment, Transport |the amount of timber used on construction sites. | | | | | |

| |and Works Bureau] | | | | | | |

|G5 |ETWBTC No. 32/92 The Use of |To reduce the amount of hardwood timber used on |( |( |Material selection: the |Materials procurement records |SP-6 |

| |Tropical Hardwood on |construction sites. | | |use of tropical hardwood | | |

| |Construction Sites [Source: | | | | | | |

| |Environment, Transport and Works| | | | | | |

| |Bureau] | | | | | | |

|G6 |PNAP 153 Tropical Hardwood |Concern is mounting that unless action is taken soon, the |( |( |Use of tropical hardwood |Material procurement records |T11-1 |

| |Timber [Source: Buildings |world's tropical rainforests will be destroyed. The finger| | |timber | | |

| |Department] |has been pointed at Hong Kong as a major user of timber | | | | | |

| | |from the rainforests | | | | | |

2 Code of Practice

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|G8 |Code of Practice for Energy |To set out the minimum requirements on energy efficiency |( |( |All fixed electrical |Electrical installations |SP-15 |

| |Efficiency of Electrical |of electrical installations in buildings. It forms a part | | |installations |summary | |

| |Installations [Source: |of a set of comprehensive Building Energy Codes that | | | |Electrical power distribution /| |

| |Electrical & Mechanical, Service|addresses energy efficiency requirements on building | | | |utilisation / power quality | |

| |Department] |services installations. Designers are encouraged to adopt | | | |worksheet | |

| | |a proactive approach to exceed the minimum requirements of| | | | | |

| | |this code. | | | | | |

|G9 |Code of Practice for Energy |To set out the minimum design requirements on energy |( |( |Provision of |Installations summary |SP-16 |

| |Efficiency of Air Conditioning |efficiency of air conditioning installations. It forms a | | |air-conditioning |Design parameters | |

| |Installations [Source: |part of a set of comprehensive Building Energy Codes that | | |installation |AC systems and controls | |

| |Electrical & Mechanical, Service|addresses energy efficiency requirements on building | | | |Air duct leakage test results | |

| |Department] |services installations. Designers are encouraged to adopt | | | |AC equipment efficiency | |

| | |a proactive approach to exceed the minimum requirements. | | | |Fan motor power calculations | |

|G10 |Code of Practice for Energy |Aims to set out the minimum design requirements on energy |( |( |Provision of lighting |Data of lamps and luminaries |SP-18 |

| |Efficiency of Lighting |efficiency of lighting installations. It forms a part of a| | |installation |Lighting power density | |

| |Installations [Source: |set of comprehensive Building Energy Codes that addresses | | | |List of submitted drawings and | |

| |Electrical & Mechanical, Service|energy efficiency requirements on building services | | | |documents | |

| |Department] |installations. Designers are encouraged to adopt a | | | | | |

| | |proactive approach to exceed the minimum requirements of | | | | | |

| | |this code. | | | | | |

Others

1 Ordinances and Regulations

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|H2 |Marine Parks Ordinance (Cap. |To provide for the designation, control and management of |( |( |Project involving / |Site inspection records |T27 |

| |476) |marine parks and marine reserves, and for purposes | | |affecting marine parks | | |

| |Marine Parks and Marine Reserves|connected therewith. | | | | | |

| |Regulations | | | | | | |

|H3 |Antiquities and Monuments |To provide for the preservation of objects of historical, |( |( |Projects of historical and|Site inspection records |G4-3 |

| |Ordinance (Cap. 53) |archaeological and palaeontological interest and for | | |archaeological interest | | |

| | |matters ancillary thereto or connected therewith. | | | | | |

|H4 |Public Health and Municipal |Makes provision for urban services and public health; |( |( |Applicable to potential |Site inspection records |G6-1 |

| |Services Ordinance (Cap. 132) |including control of nuisance caused by emission of dust | | |nuisance claims from our | |G6-3 |

| | |and fumes, discharges of hazardous materials to sewers and| | |activities | | |

| | |littering, and places restrictions on the storage of | | | | | |

| | |wastes in buildings. | | | | | |

|H5 |Summary Offences Ordinance (Cap.|Contains provisions relating to littering offences |( |( |Applicable to potential |Site inspection records |G9-7 – 15 |

| |228) |including marine littering. | | |nuisance claims from our | | |

| | | | | |activities | | |

|H6 |Fixed Penalty (Public |Fixed penalty is set out opposite to the offence of marine|( |( |Littering |Site inspection records |G9-7 – 15 |

| |Cleanliness Offences) Ordinance |littering, unlawful depositing of waste, depositing of | | | | | |

| |(Cap.570) |litter in public places, country parks and special areas, | | | | | |

| | |etc. | | | | | |

3 Other Requirements

1 Technical Circular

|No. |Title |Descriptions |Applicable to |Area of |Licenses / Compliance |Relevant EA( | |

| | | | |Applicability |Records Required | | |

|H8 |ETWBTC No. 22/2003 Additional |Introduces additional measures to improve site cleanliness|( |( |Control Mosquito Breeding |Monitoring records. |G6-3 |

| |Measures to Improve Site |and control mosquito breeding on construction sites. | | | |Pest control plan. | |

| |Cleanliness and Control Mosquito| | | | | | |

| |Breeding on Construction Sites | | | | | | |

| |[Source: Environment, Transport | | | | | | |

| |and Works Bureau] | | | | | | |

|H9 |PNAP 267 Felling, Trimming or |It is the government policy to ensure that no trees are |( |( |Felling, Trimming or |Monitoring records. |T2-7 |

| |Replanting of Trees [Source: |felled or damaged unnecessarily. Developers should be | | |Replanting of Trees | |T2-8 |

| |Buildings Department] |encouraged to save trees whenever possible. | | | | | |

| | |Precautionary measures such as erection of a protective | | | | | |

| | |fence should be implemented to safeguard all preserved | | | | | |

| | |trees from damage during construction. | | | | | |

|H10 |Lands Administration Officer |Land Owners and their Authorized Persons have a |( |( |Felling, Trimming or |Monitoring records. |T2-7 |

| |(LAO) Practice Note PN 8/2002 |responsibility in certain leases to ensure that no trees | | |Replanting of Trees | |T2-8 |

| |Application for Tree Felling or |are unnecessarily felled and that proposed tree felling or| | | | | |

| |Transplanting for private |transplanting obtains my prior written consent. | | | | | |

| |projects [Source: Lands | | | | | | |

| |Department] | | | | | | |

|H11 |ETWBTC No. 4/97 Guidelines for |Sets out guidelines for the implementation of the |( |( |New or re-redevelopment |EIA Study brief |Various aspects|

| |Implementing the Policy on |Government’s policy on off-site ecological mitigation | | |under the scope of EIA | |will be covered|

| |Off-site Ecological Mitigation |measures which, in brief, requires that where such a | | | | |under permit |

| |Measures [Source: Environment, |measure is required, it would be provided to the extent | | | | |condition. |

| |Transport and Works Bureau] |that it is practicable, on a ‘like for like’ basis and | | | | | |

| | |within the boundaries of Hong Kong. | | | | | |

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( These wastes should be classified as chemical wastes depending on the actual contents.

( These wastes should be classified as chemical wastes depending on the actual contents.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( These wastes should be classified as chemical wastes depending on the actual contents.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

( The code listed in the Relevant EA (Column K) is referred to EAR-01 as reference and shall be hidden.

-----------------------

Attention

1. According to the ISO 14001 Standard (ISO 14001:2004 ), there are no defined formats on the legal register but only required organization to identify relevant legal and other requirements.

2. The framework presented in this legal register is for reference only; users shall include legal and other requirements applicable to the activities, services and products of their operations, in the legal register.

3. In general, the major environmental legislations in Hong Kong cover the following areas:

• Air emission control

• Noise control

• Waste management

• Water pollution control

• Environmental Impact Assessment

As a starting point, users may visit the following websites of the Environmental Protection Department for an overview of the environmental legislations, standards and guidelines of Hong Kong:

• Environmental Legislations

()

• Environmental Standards and Guidelines

()