Current Contract Information Form .gov



State of Washington

Current Contract Information

Revision date: December 23, 2009

Effective date: January 1, 2010

|Contract number: |03705 (replaces 14399) |Commodity code: |5610 |

|Contract title: |Asphalt, Bulk Products |

|Purpose: |Contract extension and price adjustments on select items. |

|Original award date: |06/08/2005 |

|Current period: |01/01/2010 |through: |06/30/2011 |

|Contract term: |Not to exceed six (6) years or 06/30/2011 |

|Contract type: |This contract is designated as convenience use. |

|Scope of contract |This contract is for the “as-needed” purchase of Bulk Asphalt products (see Products/Services available below). Due to|

| |the need for statewide availability, this contract has been awarded to multiple contract vendors. |

|For use by: |General use: All State Agencies, Political Subdivisions of Washington and Oregon State, Qualified Non-profit |

| |Corporations, Materials Management Center, Participating Institutions of Higher Education (College and Universities, |

| |Community and Technical Colleges). |

|Contractors: |See page 6. |

|Pricing Main Products: |See page 8. |

|Other Products pricing |See page 12 represented by contractors alphabetically. |

|Products/Services available: |Liquid Asphalt, Hot Asphalt Rubber Crack Sealants, Asphalt Pavement Patching & Repair Products, Concrete Pavement |

| |Repair Products. |

|Ordering procedures: |See page 2 Note I |

|Term worth: |$2,320,800/1.5 yr term |

|Current participation: |$0 MBE |$0 WBE |$2,320,800.00 OTHER |$0 EXEMPT |

| |MBE 0% |WBE 0% |OTHER 100% |Exempt 0% |

This page contains key contract features. Find detailed information on succeeding pages. For more information on this contract, or if you have any questions, please contact your local agency Purchasing Office, or you may contact our office at the numbers listed below.

Contract Administrator: Corey Larson Contract Assistant: Christine Schoepfer

Phone Number: (360) 902-7444 Phone Number: (360) 902-7193

Fax Number: (360) 586-2426 Fax Number: (360) 586-2426

Email: clarson@ga. Email: cschoep@ga.

Contact Customer Service at (360) 902-7400 or csmail@ga. for more information.

Visit our Internet site:

Notes:

I. State Agencies: Submit Order directly to Contractor for processing. Political Subdivisions: Submit orders directly to Contractor referencing State of Washington contract number. If you are unsure of your status in the State Purchasing Cooperative call (360) 902-7415. Only authorized purchasers included in the State of Washington Purchasing Cooperative (WSPC) and State of Oregon Cooperative Purchasing Program (DASCPP/ORCPP) listings published and updated periodically by OSP and DAS may purchase from this contract. It is the contractor’s responsibility to verify membership of these organizations prior to processing orders received under this contract. Washington State agencies and Higher Education are already members of the WSPC. A list of Washington members is available on the Internet, and a and a list of the Oregon members is available at . Contractors shall not process state contract orders from unauthorized users.

II. Contract Terms: This Document includes by reference all terms and conditions published in the original IFB #03705, including Standard Terms and Conditions, and Definitions, included in the Competitive Procurement Standards published by OSP (as Amended).

Special Conditions:

1. (12/28/09) Contract Extension. Contract is extended for an eighteen (18) month period (01/01/2010 through 06/30/2011 under the existing terms, conditions, specifications and pricing. Price decrease from Partner Construction Products, items 115 though 123 and items 132 and 133. Price changes are highlighted in red in the “Other Products” Pricing pages.

2. (10/01/08) Incorporate a price increase for Partner Construction Products effective 10/03/08. Delete items 131, 145 & 146. Estimated term value has been adjusted to $410,000 based on reported usage.

3. (7/23/08) Incorporate a price increase for Maxwell Products Inc. effective 7/24/08 and, add items 3B and 4A as available products.

Previous notes:

4. (7/3/08) Incorporate a price increase for Albina Asphalt effective 7/9/08.

5. (7/01/08) Contract Extension. Contract is extended with 6 of 9 contractors for an eighteen (18) month period (7/1/08 through 12/31/09) under the existing contract terms, conditions, specifications and pricing. The estimated term value has been adjusted to $350.000 based on reported usage. Three contractors-Lakeside Industries, McAsphalt Industries Limited and Sullivan Supply-have elected NOT to extend their portion of the contract. There are numerous changes to vendor contact names, phone numbers, etc.

6. (3/14/08) Incorporate a price increase for Albina Asphalt effective 3/15/08.

7. Administrative change. OSP contact specialist Deborah Chakos retires on November 30, 2007. A new contract specialist will be assigned at a later date.

8. (7/12/07) Rate Decrease. Special Asphalt is decreasing their rate on the “Other Products” List, item #170, Resurfacer XLR8 Seal Coat. Rate was $1.96/per gallon and is now (effective immediately) $1.63/per gallon. The price sheet incorporates this change.

9. (6/18/07) Extension. Contract is extended for a Twelve (12)-month period effective 07/01/2007. New term 07/01/2007 thru 06/30/2008. The term value modified $449,740.72 (based on reported usage combined with requested rate increases and reduction of term from 2 years down to 1 year). There is a possibility of additional contract extensions up through 06/30/2011.

10. (6/18/07) Rate Increase. The table below indicates the contractors increased rate averages that go into effect on 07/01/2007. The price sheets attached include in increased rates. The Producer Price Index supported from 20% up to 31.6% increases based on the last date of contractor increase.

11.

|Contractor: |Averaged rate increase |Last rate increase |Other changes |

|Albina Asphalt |No rate increase |February 2007 |None |

|Arrow Construction Supply |13.6% |July 2005 |None |

|Crafco Inc. |No rate increase |July 2005 |None |

|Maxwell Products Inc. |No rate increase |April 2007 |None |

|McAsphalt Industries Limited |22% |April 2007 |None |

|Partner Construction Products |No rate increase |March 2007 |None |

|Special Asphalt Products |20% |June 2006 |None |

|Sullivan Supply |7% |July 2005 |Items on “Other |

| | | |Products” List |

12. (6/18/07) Contractor Removal. Lakeside Industries has elected NOT to extend their portion of the contract. They have been encouraged to participate in future term contract bidding opportunities.

13. (03/22/07) Rate increase. Maxwell Products has increased their rates by an average of 21%. The rate changes go into effect on 04/01/2007 and will remain firm and fixed through 07/01/07. Items with rate increases are: 2B, 2D, 2E, 4C, and from the “Other Products list” items: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, and 110. The price sheet includes the increased rates. Maxwell also updated order placement information, and corrected item product number information on items #107 and #108.

14. (03/13/07) Administrative change. Contact person for Maxwell Products has changed and the new contact person is reflected on the “Contractor Information Sheet.” Also, 5 new items added to the “Other Products List” numbered 111 thru 115.

15. (03/01/07) Rate increase/decrease. Partner Construction has increased product rates on “Other Products List” at an average of 18%. The rate increase is effective March 13, 2007 and will remain firm for a minimum term of three (3)-months (06/12/07). The rate increase is supported by the PPI index which shows an averaged rate increase from 12/05 to 12/06 @ 36%. This is Partner Constructions first rate increase since the award of the contract in 06/05. Items increased on the “Other Products List” are: #112, #114, #116, #117, #118, #119 (Decreased by 11%), #120, #126, and #131. The products on the price sheet include the increased rates.

16. (02/16/07) Rate increase. Albina has increased product rates at an average of 7.3%. The rate increase is supported by the PPI index which shows an averaged rate increase from 06/06 to 12/06 @ 7.4% and product purchase increase supported by invoices of 60%. The rate increase is effective March 1, 2007 and will remain firm for a minimum term of three (3)-months (05/31/07). Items increased are “Main products” items #1A, 1B, 1C, 1D, 1J, 1L, 1M, 1N, 1O, 1P, 1Q, and “Other products list” item 1. The products on the price sheet include the increased rates.

17. (02/16/07) Rate decrease. Albina has decreased certain product rates by 13%. The decrease in rates are effective March 1, 2007. Items decreased are “Main products” items #1E, 1F, 1G, 1H, and 1I. The products on the price sheet include the decreased rates.

18. (02/06/07) Rate increase. McAsphalt Industries have increased product rates by 20%, for items 1E thru 1R, 2F, 2G, and 6B on the main contract. The rate increase is effective February 9, 2007. The products on the price sheets include the increased rates. The increased rates are in effect from 02/09/2007 for a minimum term of three (3)-months (05/08/2007). The rate increase of 20% is substantiated by the producer price index (Non-adjusted asphalt paving mixture & blocks mfg, adjusted asphalt paving mixture & blocks mfg, asphalt & tar paving, and crude petroleum) that indicates an average combined increase of 35%.

19. (08/18/06) Rate increase. Lakeside Industries have increased product rates by 72.1%, for items 4B on the main contract and for item number 99 on the “Other Products” list. The rate increase is effective September 1, 2006. The products on the price sheets include the increased rates. The increased rates are in effect from 09/01/2006 for a minimum term of three (3)-months (12/01/2006). The rate increase of 72.1% is substantiated by the producer price index which indicates an actual increase of 74.9%.

20. (6 29 06) Rate increase. Special Asphalt Products have increased product rates for items 2A through 3A on the main contract and for “Other Products” list item numbers 148 through 164 by 18%. On “Other Products” list item numbers 165 and 166 there is a rate increase of 25%. The rate increases are effective June 28, 2006. The products on the price sheets include the increased rates. The increased rates are in effect from 06/28/2006 for a minimum term of three (3)-months (09/28/2006). McAsphalt Industries Limited have increased their product rates by 31%. The rate increases are effective June 28, 2006 and will remain firm through 09/28/2006. The products on the price sheet include the increased rates.

21. (3/23/06) Rate increase. Albina Asphalt has increased the rates of their provided products by 15%. The rate increase is effective June 9, 2006. Albina products on the price sheets include the increased 15% rates. The increased rates are in effect from 06/09/2006 for a minimum term of three (3)-months.

22. (3/21/06) Rate change. Partner Construction has lowered their rate on “Other Products” Pricing list of Roadsaver low tack 2500# pallet. Previous price was $0.55, the lowered current rate is $0.42

23. (3/21/06) Administrative change. Line item numbers have been assigned to the “Other Products” Pricing list for convenience of locating product only.

24. (3/9/06) Contact change. Albina has moved the corporate headquarters to Vancouver Washington. Address and telephone numbers have changed. See Contractor Information sheet.

25. (3/9/06) Rate increases. Albina has increased rates an overall average as supported by the PPI index at 18% on item numbers 1A, 1B, 1C, 1D, 1E, 1F, 1G, 1H, 1I, 1J, 1L, 1M, 1N, 1O, 1P, and 1Q. Increased rates are retroactive to March 1, 2006.

26. (3/9/2006) Administrative change. Inactivate Albina vendor numbers 20842 and 20842-1 and replace with new vendor number W7002. Inactivate Sullivan vendor number 2678 and replace with new vendor number W221. The replacement vendor numbers are as represented in their WEBS registration for in-house tracking purposes.

27. (6/29/2005) Include the “after hours” rates and percentage of recycled material as referenced in the accepted submitted offers.

28. (6/29/2005) Correct page 6 line item #1Q to be consistent with product as listed on page 9, line 6.

29. (6/29/2005) Correct Lakeside Industries service coverage on their “Other products” list per their submittal.

30. (6/29/2005) Special Asphalts has added two items to their “Other Products” list, re-surfacer seal coat and re-surfacer XLR8 seal coat.

31. (6/08/2005) The award was made based on the lowest responsible responsive offer on the 6 main products. The lowest offered rate is noted in bold “RED.” The next lowest cost is also listed to assist customers in situations where the awarded contractor may not be able to provide product or if the location (liquid asphalt) is not cost productive to obtain the product, or if the contractor has not offered to provide the product to all counties. It is the responsibility of the customer to order from the company providing the lowest offer (taking freight costs into consideration) whenever feasible.

32. (6/08/2005) Zones Counties

|Zone 1, WSDOT Northwest |Island, King, San Juan, Skagit, Snohomish & Whatcom |

|Zone 2, WSDOT North Central |Chelan, Douglas, Ferry, Grant & Okanogan |

|Zone 3, WSDOT Olympic |Clallam, Grays Harbor, Jefferson, Kitsap, Mason, Pierce & Thurston |

|Zone 4, WSDOT Southwest |Clark, Cowlitz, Klickitat, Lewis, Pacific, Skamania & Wahkiakum |

|Zone 5, WSDOT South Central |Asotin, Benton, Columbia, Garfield, Franklin, Kittitas, Walla Walla & Yakima |

|Zone 6, WSDOT Eastern |Adams, Lincoln, Pend Oreille, Spokane, Stevens & Whitman |

Contractor Information

|Description/Contractor: |Albina Asphalt |Arrow Construction Supply Inc |Crafco Inc. |

|Vendor # |W7002 |W6633 |W1171 |

|Zone/Counties provided: |All counties |All counties |All counties |

|Federal ID No.: |93-0466510 |91-1917364 |86-0324978 |

|Primary Contact: |Dave Zillman |Dave Lawless |Greg Sharp |

|Email, primary: |dave.zillman@ |dave@ |Greg.sharp@ |

|Phone, primary: |360-816-8546 |509-922-7847 |503-284-4330 |

|Fax, primary: |360-816-8547 |509-922-9879 |503-284-1227 |

|Alternate contact: |Robert Davis |Marc Schwadderer |Bryan Darling |

|Email, alternate: |bdavis@ |marc@ |Bryan.darling@ |

|Phone, alternate: |360-816-8542 |208-772-4076 |480-505-8041 |

|Fax, alternate: |360-816-8543 |208-762-1177 |480-940-0313 |

|Address: |801 Main Street |PO Box 11133 |420 N Roosevelt Ave |

|City ST Zip |Vancouver WA 98660 |Spokane WA 99211-1133 |Chandler AZ 85226 |

|Order placement contact |Bob Olson |Marlon Moore |Tad McDonald |

|Email, order placement: |Bob.olson@ |sales@ |Tad.mcdonald@ |

|Phone, order placement: |888-308-5581 |509-922-7847 |503-284-4330 |

|Fax, order placement: |360-816-8583 |509-922-9879 |503-284-1227 |

|Send orders to: |See above address |See above address |2224 NE Argyle St |

| | | |Portland OR 97211 |

|Send payment to: |See above address |See above address |420 N Roosevelt Ave |

| | | |Chandler AZ 85226 |

|Billing will be from: |See above address |See above address |420 N Roosevelt Ave |

| | | |Chandler AZ 85226 |

|Warehouse address: |1112 W 7th St |10225 E Trent Avenue |2224 NE Argyle St |

|City ST Zip |Vancouver WA 98666 |Spokane WA 99206 |Portland OR 97211 |

|Payment Terms: |Net 30 |2% Net 30 |Net 30 |

|Accepted VISA |YES |YES |YES |

|Ordering procedures: |Email, phone, Fax |Email, phone, Fax |Email, phone, call, Fax |

|Delivery time: |As required |15 days ARO |14 days ARO |

|Shipping: |FOB Plant |FOB Plant |FOB Plant |

|Freight: |Pre-pay & add, when customer does not |Pre-pay & add, when customer does not |Pre-pay & add, when customer does not |

| |pickup from site |pickup from site |pickup from site |

|Contract worth: |$1,678,899.00- reported for 18 months |$108,548.00-reported for 18 months |None reported for 2008/2009 |

| |2008/2009 |2008/2009 | |

Contractor Information

|Description/Contractor: |Maxwell Products Inc. |Partner Construction Products |Special Asphalt Products |

|Vendor number: |W7706 |W5377 |W5808 |

|Zone/Counties provided: |All counties |All counties |All counties |

|Federal ID No.: |87-0319315 |75-2983837 |93-0823438 |

|Primary Contact: |Brenton Phelps |Bob Major |Royal Ingebretsen |

|Email, primary: |brenton@ |bmajor@ |royal@ |

|Phone, primary: |208-243-3738 |206-932-6683 |509-467-1662 |

|Fax, primary: |801-972-5536 |206-932-6681 |509-489-5408 |

|Alternate contact: |Larry Allen |Dan Major |Gary Cook |

|Email, alternate: |larry@ |dmajor@ |gary@ |

|Phone, alternate: |801-972-2090 |206-780-9290 |503-295-6490 |

|Fax, alternate: |801-972-5536 |206-780-1031 |503-295-2901 |

|Address: |650 Delong St |8965 Sands Ave NE |3117 E Everett Avenue |

|City ST Zip |Salt Lake City UT 84104 |Bainbridge Island WA 98110 |Spokane WA 99207 |

|Order placement contact |Brenton Phelps |Dan or Bob Major |Royal Ingebretsen |

|Email, order placement: |brenton@ |bmajor@ |royal@ |

|Phone, order placement: |208-243-3738 |206-932-6683 |509-981-8066 |

|Fax, order placement: |801-972-5536 |206-932-6681 |509-489-5408 |

|Send orders to: |650 Delong St |3518 W Marginal Way SW Terminal 7-B |3117 E Everett Avenue |

| |Salt Lake City UT 84104 |Seattle WA 98106 |Spokane WA 99207 |

|Send payment to: |650 Delong St |8965 Sands Ave NE |PO Box 83295 |

| |Salt Lake City UT 84104 |Bainbridge Island WA 98110 |Portland OR 97283 |

|Billing will be from: |650 Delong St |3518 W Marginal Way SW Terminal 7-B |PO Box 83295 |

| |Salt Lake City UT 84104 |Seattle WA 98106 |Portland OR 97283 |

|Warehouse address: | |3518 W Marginal Way SW Terminal 7-B |3117 E Everett Avenue |

|City ST Zip | |Seattle WA 98106 |Spokane WA 99207 |

|Payment Terms: |Net 30 |Net 30 |2% Net 30 |

|Accepted VISA |YES |YES |YES |

|Ordering procedures: |Email, phone, Fax |Email, phone, Fax |Email, phone, Fax |

|Delivery time: |10 days ARO |5 business days ARO |14 days ARO |

|Shipping: |FOB Plant |FOB Plant |FOB Plant |

|Freight: |Pre-pay & add, when customer does not pickup from|Pre-pay & add, when customer does not |Pre-pay & add, when customer does not |

| |site |pickup from site |pickup from site |

|Contract worth: |$81,100 – reported for 18 months 2008/2009 |$444,447.00 reported for 18 months |$7,816.00 reported for 18 months |

| | |2008/2009 |2008/2009 |

Contractor Information

PRICING, Main Products

|Item |Description |Contractor: Albina Asphalt All Counties |

|1 |Liquid Asphalt |Unit cost |After hours Cost |% recycled material |

|1A |Liquid Asphalt medium curing MC-250 |$813.10 per Ton |$813.10 per Ton |0 % |

|1B |Liquid Asphalt medium curing MC-800 |$813.10 per Ton |$813.10 per Ton |0 % |

|1C |Paving Asphalt PG58-22 |$519.45 per Ton |$519.45 per Ton |0 % |

|1D |Paving Asphalt PG64-22 |$519.45 per Ton |$519.45 per Ton |0 % |

|1E |Emulsified Asphalt slow setting CSS-1 |$875.00 per Ton |$875.00 per Ton |0 % |

|1F |Emulsified Asphalt slow setting CSS-1h |$875.00 per Ton |$875.00 per Ton |0 % |

|1G |Emulsified Asphalt medium setting CMS-2 |$875.00 per Ton |$875.00 per Ton |0 % |

|1H |Emulsified Asphalt medium setting CMS-2h |$875.00 per Ton |$875.00 per Ton |0 % |

|1I |Emulsified Asphalt medium setting CMS-2s |$875.00 per Ton |$875.00 per Ton |0 % |

|1J |Emulsified Asphalt rapid setting CRS-2 |$453.00 per Ton |$453.00 per Ton |0 % |

|1K |Emulsified Asphalt rapid setting CRS-2h |No bid |No bid | |

|1L |Emulsified Asphalt rapid setting CRS-2p |$562.50 per Ton |$562.50 per Ton |0 % |

|1M |Emulsified Asphalt rapid setting HFE-90 |$453.00 per Ton |$453.00 per Ton |0 % |

|1N |Emulsified Asphalt rapid setting HFE-100s |$575.00 per Ton |$575.00 per Ton |0 % |

|1O |Emulsified Asphalt rapid setting HFE-150 |$453.00 per Ton |$453.00 per Ton |0 % |

|1P |Emulsified Asphalt rapid setting HFE-901s |$562.50 per Ton |$562.50 per Ton |0 % |

|1Q |RSLTP low temp. polymer mod |$581.25 per Ton |$581.25 per Ton |0 % |

|1R |Special Tack STE-1 |No bid |No bid | |

PRICING, Main Products

|Item |Description |Contractor: Maxwell All Counties |Contractor: Special Asphalt All Counties |

|#2 |Hot Asphalt Rubber Crack Sealants: |Unit cost |After hours Cost |% recycled |Unit cost |After hours Cost |% recycled material|

| | | | |material | | | |

|2B |ASTM D 1190 Pallet # |$0.47/lb. |$0.47/lb. |12 % |$1,083.24 ($0.48/lb) 2250#|No offer |0 % |

| | |2800# pallet |2800# pallet | |pallet | | |

|2C |ASTM D 3405 Block # |$0.57/lb. |$0.57/lb. |8 % |$15.29 ($0.51/lb) Type 1, |No offer |0% |

| | |34# block |34# block | |30# block | | |

|2D |ASTM D 3405 Pallet # |$0.52/lb. |$0.52/lb. |8 % |$1,146.96 ($0.51/lb) type |No offer |0 % |

| | |34# block |34# block | |1, 2250# pallet | | |

|2E |WSDOT test method 412 for Joint and Crack Seal|$0.56/lb. |$0.56/lb. |3 % |$1,146.96 |$1,146.96 |0 % |

| |Bond | | | |($0.51/lb) 2250# pallet |($0.51/lb) 2250# pallet | |

|Item |Description |Contractor: Special Asphalt All Counties |

|#2 |Hot Asphalt Rubber Crack Sealants: |Unit cost |After hours Cost |% recycled |

| | | | |material |

|2F |ASTM D6690 Block # |$14.45 ($0.48/lb) Type 1, |No offer |0 % |

| | |30# block | | |

|2G |ASTM D 6690 Pallet # |$1,083.24 ($0.48/lb) Type |No offer |0 % |

| | |1, 2250# pallet | | |

PRICING, Main Products

|Item |Description |Contractor: Special Asphalt All Counties |Contractor: Crafco All counties |Contractor: Maxwell Products All Counties |

|#3 |Asphalt Pavement Patching and |Unit cost |After hours Cost |

| |Repair Products | | |

|#4 |Concrete Pavement Repair Products|Unit cost |After hours Cost |% recycled material |Unit cost |After hours Cost |% recycled |

| | | | | | | |material |

|4B |Cold Applied Repair Products | | | |

|Item |Description |Contractor: Maxwell Products All Counties |

|#4 |Concrete Pavement Repair Products|Unit cost |After hours Cost |% recycled material |

|4C |Joint and Crack Sealants |$0.55 / lb. |$0.55 / lb. |0% |

| | | | | |

PRICING, Main Products

|Item |Description |Contractor: Arrow Const. All Counties |

|#6 |Miscellaneous |Unit cost |After hours Cost |% recycled material|

|6A |Dust Control Coherex, 54 gal bbl |$6.50 / gal |No offer |0 % |

|6B |Reclamite, 5 gallon pail | | | |

|Item |Description |Contractor: Arrow Const. All Counties |Contract: Partner Const. All Counties |

|#6 |Miscellaneous |Unit cost |

|#6 |Miscellaneous |Unit cost |After hours Cost |% recycled material|

|6F |Aggregate, BT #6 X 10 5/8 x 3/8 blend | | | |

|6G |Pour pots each |$125.00 |No offer |0 % |

|6H |Distance Measuring Wheels each |$140.00 |No offer |0 % |

“OTHER PRODUCTS” PRICING

|Item # |Contractor |Product |Price |% recycled |

|1 |Albina Asphalt |Paving asphalt, OG64-22 |$337.81/Ton |0 % |

|2 |All Counties |Solvs-it (asphalt release agent) 5 gal pail |$40.25 |0 % |

|3 |Albina Asphalt |Solvs-it (asphalt release agent) 55 gallon drum |$345.00 |0 % |

|4 |Albina Asphalt |Earthbind 100 (concentrate dust oil) |$3.62/gal |0 % |

|5 |Albina Asphalt |RS-LTP, low temp. Polymer mod |$293.25/Ton |0 % |

| | | | | |

|Item # |Contractor |Product |Price |% recycled |

| |Arrow Construction |Pavement sealant: | | |

|6 |All Counties |ASTM D6690 Type I (D1190) 38# block |$0.49 |4 % |

|7 |Arrow Construction |ASTM D6690 Type I (D1190) 2730# pallet, Crafco 211 Roadsaver Sealant |$0.49 |4 % |

|8 |Arrow Construction |ASTM D6690 Type I (D1190) 33# block |$0.49 |18 % |

|9 |Arrow Construction |ASTM D6690 Type I (D1190) 2730# pallet, Crafco 203 Roadsaver Sealant |$0.49 |18 % |

|10 |Arrow Construction |ASTM D6690 Type II (D3405) 35# block |$0.49 |4 % |

|11 |Arrow Construction |ASTM D6690 Type II (D3405) 2520# pallet, Crafco 221 Roadsaver Sealant |$0.55 |4 % |

|12 |Arrow Construction |ASTM D6690 Type II (D3405) 31# block |$0.55 |18 % |

|13 |Arrow Construction |ASTM D6690 Type II (D3405) 2230# pallet, Crafco 201 Roadsaver Sealant |$0.55 |18 % |

|14 |Arrow Construction |ASTM D6690 Type III (SS-S-1401C) 32# block |$0.57 |4 % |

|15 |Arrow Construction |ASTM D6690 Type III (SS-S-1401C) 2300# pallet, Crafco 222 Roadsaver |$0.57 |4 % |

| | |Sealant | | |

|16 |Arrow Construction |ASTM D6690 Type IV (D3405 low mod) 33# block |$0.58 |0 % |

|17 |Arrow Construction |ASTM D6690 Type IV (D3405 low mod) 2376# pallet, Crafco 231 Roadsaver |$0.43 |0 % |

| | |Sealant | | |

|18 |Arrow Construction |Roadsaver Low Tack 38# block |$0.55 |0 % |

|19 |Arrow Construction |Roadsaver Low Tack 2730# pallet, Crafco 543 Roadsaver Low Tack |$0.55 |0 % |

|20 |Arrow Construction |Superflex HT (direct fire) 32# block |$0.67 |0 % |

|21 |Arrow Construction |Superflex HT (direct fire) 2300# pallet, Crafco 533 Superflex HT |$0.67 |0 % |

|22 |Arrow Construction |Asphalt pavement patching & repair product: Cold applied pavement repair |$102.00 |0 % |

| | |material – black color .55 sq. ft. Kit, Crafco 33336 a, b, c Elastopatch | | |

| | |& Elastocrete | | |

| |Arrow Construction |Concrete pavement repair products: | | |

|23 |Arrow Construction |Primer used with item 4A, Crafco 34290 TechCrete |$25.00/gal |0 % |

|24 |Arrow Construction |Cover material used with item 4A, 50# bag, Crafco 34950 TechCrete |$0.48 |0 % |

| |Arrow Construction |Traffic & Safety Products: | | |

|25 |Arrow Construction |Hot applied loop sealant, single block box, 37# block |$1.60 |0 % |

|26 |Arrow Construction |Hot applied loop sealant, single block box, 2660# pallet, Crafco 271 Loop|$1.60 |0 % |

| | |Detector Sealant | | |

|27 |Arrow Construction |Cold applied loop sealant QT Tube, Crafco 34903 Roadsaver Silicone |$21.00/each |0 % |

“OTHER PRODUCTS” PRICING Continued

|Item # |Contractor |Product |Price |% recycled |

|28 |Arrow Construction |Hot applied flexible marker adhesive pallet divided box, 37# block |$0.83 |0 % |

|29 |Arrow Construction |Hot applied flexible marker adhesive pallet divided box, 1800# pallet, |$0.83 |0 % |

| | |Crafco 270 Hot-applied Flexible Pavement Marker Adhesive | | |

|30 |Arrow Construction |Hot applied temporary marker adhesive divided box, 49# block |$0.45 |0 % |

|31 |Arrow Construction |Hot applied temporary marker adhesive pallet divided box, 2350# pallet, |$0.45 |0 % |

| | |Crafco 269 Hot-applied Bituminous Marker Adhesive | | |

|32 |Arrow Construction |Qwikstick, Crafco 34567 |$12.00/each |0 % |

| |Arrow Construction |Cleaners & Detackifiers: | | |

|33 |Arrow Construction |Liquid sealant detackifier, 5 gal pail, Crafco 34681 Detack |$12.00 |0 % |

|34 |Arrow Construction |Liquid sealant & asphalt remover, 5 gal pail, Crafco 33950 Roadsaver |$35.00 |0 % |

| | |Sealant & Asphalt Remover | | |

|35 |Arrow Construction |Geotac, Crafco |$0.55/sq. ft. |0 % |

|36 |Arrow Construction |Paveprep, Crafco |$1.05/sq. ft. |0 % |

|37 |Arrow Construction |Paveprep self adhesive, Crafco |$1.17/sq. ft. |0 % |

|38 |Arrow Construction |ISAC, Crafco |$2.39/sq. ft. |0 % |

|39 |Arrow Construction |TruPave, Owens-Corning |$1.65/sq. yd. |0 % |

|40 |Arrow Construction |Petromat, Amoco |$0.49/sq. yd. |0 % |

|41 |Arrow Construction |GlasGrid #8501, California Paving |$5.55/sq. yd. |0 % |

| |Arrow Construction |Waterproofing/pavement fabrics: | | |

|42 |Arrow Construction |Geofilm |$0.48/sq. ft. |0 % |

|43 |Arrow Construction |GlasGrid #8502 |$7.50/sq. yd. |0 % |

|44 |Arrow Construction |Amoco 2002, Propex |$0.62/sq. yd. |0 % |

|45 |Arrow Construction |Amoco 2006, Propex |$0.87/sq. yd. |0 % |

|46 |Arrow Construction |Amoco 4545, Propex |$0.57/sq. yd. |0 % |

|47 |Arrow Construction |Amoco 4553, Propex |$0.87/sq. yd. |0 % |

|48 |Arrow Construction |Tensar UX1100, Tensar Earth Technologies |$2.75/sq. yd |0 % |

|49 |Arrow Construction |Tensar UX1200, Tensar Earth Technologies |$4.10/sq. yd. |0 % |

|50 |Arrow Construction |Solvsit Extra Heavy Duty Cleaner/Degreaser 55 gal drum, Carroll Chemical|$350.00 |0 % |

| |Arrow Construction |Cold Applied Expansion Joint System: | | |

|51 |Arrow Construction |ElastoCrete Black .55 sq. ft. Kit, Crafco 33336 a, b, c |$102.00 |0 % |

|52 |Arrow Construction |Elastopatch Gray .55 sq. ft. Kit, Crafco 33338 a, b, c |$102.00 |0 % |

|53 |Arrow Construction |Rallithane 1.32 gallon Kit, Crafco 33325 |$76.95 |0 % |

|54 |Arrow Construction |Rallithane Primer Liter, Crafco 33328 |$31.00 |0 % |

|55 |Arrow Construction |Elastoprimer liter, Crafco 33335 |$21.00 |0 % |

| |Arrow Construction |High Friction Surface (HFS) System: | | |

|56 |Arrow Construction |HFS Binder 4.84 gallon Kit, Crafco 33351 |$225.00 |0 % |

|57 |Arrow Construction |HFS Cover material 50# bag, Crafco 34950, 33371, 33374 |$0.46 |0 % |

“OTHER PRODUCTS” PRICING Continued

|Item # |Contractor |Product: |Price |% recycled |

| |Crafco Inc. |Hot Asphalt Rubber Crack Sealants: | | |

|58 |All Counties |ASTM D6690 Type I (D1190) 38# block |$0.425 |4 % |

|59 |Crafco Inc. |ASTM D6690 Type I (D1190) 2730# pallet |$0.40 |4 % |

|60 |Crafco Inc. |ASTM D6690 Type I (D1190) 33# block |$0.43 |18% |

|61 |Crafco Inc. |ASTM D6690 Type I (D1190) 2370# pallet |$0.406 |18 % |

|62 |Crafco Inc. |ASTM D6690 Type II (D3405) 35# block |$0.47 |4 % |

|63 |Crafco Inc. |ASTM D6690 Type II (D3405) 2520# pallet |$0.44 |4 % |

|64 |Crafco Inc. |ASTM D6690 Type II (D3405) 31# block |$0.47 |18 % |

|65 |Crafco Inc. |ASTM D6690 Type II (D3405) 2230# pallet |$0.44 |18 % |

|66 |Crafco Inc. |ASTM D6690 Type III (SS-S-1401C) 32# block |$0.47 |4 % |

|67 |Crafco Inc. |ASTM D6690 Type III (SS-S01401C) 2300# pallet |$0.44 |4 % |

|68 |Crafco Inc. |ASTM D6690 Type IV (D3405 low-mod) 33# block |$0.50 |0 % |

|69 |Crafco Inc. |ASTM D6690 Type IV (D3405 low-mod) 2376# pallet |$0.468 |0 % |

|70 |Crafco Inc. |Roadsaver Low Tack 38# block |$0.48 |0 % |

|71 |Crafco Inc. |Roadsaver Low Tack 2730# pallet |$0.45 |0 % |

|72 |Crafco Inc. |Superflex HT (direct fire) 32# block |$0.56 |0 % |

|73 |Crafco Inc. |Superflex HT (direct fire) 2300# pallet |$0.53 |0 % |

|74 |Crafco Inc. |Asphalt pavement patching & repair product: Cold applied pavement repair |$98.00 |0 % |

| | |material Black color .55 sq. ft. Kit | | |

| |Crafco Inc. |Concrete pavement repair products: | | |

|75 |Crafco Inc. |Primer used with item #4A, Gal. |$24.95 |0 % |

|76 |Crafco Inc. |Cover material used with Item #4a, 50# bag |$0.47 |0 % |

| |Crafco Inc. |Loop Sealants & Adhesives: | | |

|77 |Crafco Inc. |Hot applied loop sealant (single block box) 37# block |$1.75 |0 % |

|78 |Crafco Inc. |Hot applied loop sealant (single block box) 2660# pallet |$1.568 |0 % |

|79 |Crafco Inc. |Cold applied loop sealant QT Tube, each |$17.95 |0 % |

|80 |Crafco Inc. |Hot applied flexible marker adhesive pallet (divided box) 37# block |$0.80 |0 % |

|81 |Crafco Inc. |Hot applied flexible marker adhesive pallet (divided box) 1800# pallet |$0.75 |0 % |

|82 |Crafco Inc. |Hot applied temporary marker adhesive (divided box) 49# block |$0.40 |0 % |

|83 |Crafco Inc. |Hot applied temporary marker adhesive pallet (divided box) 2350# pallet |$0.375 |0 % |

|84 |Crafco Inc. |Qwikstick, each |$9.50 |0 % |

| |Crafco Inc. |Cleaners & Detackifiers: | | |

|85 |Crafco Inc. |Liquid sealant detackifier 5 gal pail |$7.95 |0 % |

|86 |Crafco Inc. |Sealant & asphalt remover 5 gal pail |$29.80 |0 % |

| |Crafco Inc. |Waterproofing/pavement fabrics: | | |

|87 |Crafco Inc. |Geofilm, sq. ft. |$0.48 |0 % |

|88 |Crafco Inc. |Geotack sq. ft. |$0.48 |0 % |

|89 |Crafco Inc. |Paveprep sq. ft. |$0.80 |0 % |

|90 |Crafco Inc. |Paveprep self adhesiver sq. ft. |$0.89 |0 % |

“OTHER PRODUCTS” PRICING Continued

|Item # |Contractor |Product |Price |% recycled |

|91 |Crafco Inc. |ISAC sq. ft |$2.39 |0 % |

| |Crafco Inc. |Cold Applied Expansion Joint System: | | |

|92 |Crafco Inc. |ElastoCrete-Black .55 sq. ft. Kit |$98.00 |0 % |

|93 |Crafco Inc. |Elastopatch-Gray .55 sq. ft. Kit |$98.00 |0 % |

|94 |Crafco Inc. |Rallithane 1.32 gallon Kit |$74.95 |0 % |

|95 |Crafco Inc. |Rallithane primer, Liter |$29.00 |0 % |

|96 |Crafco Inc. |Elastoprimer, Liter |$19.50 |0 % |

| |Crafco Inc. |High Friction Surface (HFS) System: | | |

|97 |Crafco Inc. |HFS Binder, 4.84 gallon Kit |$220.00 |0 % |

|98 |Crafco Inc. |HFS Cover material, 50# bag |$0.45 |0 % |

| | | | | |

|Item # |Contractor |Product |Price |% recycled |

|99 |Maxwell Products |Elastoflex 65 ASTM D5078, 2800# pallet |$0.45 |8 % |

|100 |All Counties |Elastoflex 2010, Custom Premium, lb. |N/A |0 % |

|101 |Maxwell Products |Elastoflex 61 ASTM D6690 Type II & ASTM D3405 |$0.52 |0 % |

|102 |Maxwell Products |Elastoflex 52 ASTM D6690 Type I & ASTM D1190 |$0.47 |0 % |

|103 |Maxwell Products |Elastoflex 63, ASTM D6690 Type III |$0.57 |0 % |

|104 |Maxwell Products |Elastoflex 71, ASTM D6690 Type IV |$0.64 |0 % |

|105 |Maxwell Products |Elastoflex 98 WSDOT test method 412 joint & crack seal bond |$0.56 |0 % |

|106 |Maxwell Products |Joint & crack sealant, ASTM D6690, Type I |$0.47 |0 % |

|107 |Maxwell Products |Joint & crack sealant, ASTM D6690, Type II |$0.52 |0 % |

|108 |Maxwell Products |Joint & crack sealant ASTM D6690 (SS-S-1401C) Type III |$0.57 |0 % |

|109 |Maxwell Products |Joint & crack sealant ASTM D6690 Type IV |$0.64 |0 % |

|110 |Maxwell Products |NUVO CS, Type A, per lb. |$0.57 |0 % |

|111 |Maxwell Products |NUVO, Type B, per lb. |$0.55 |0 % |

|112 |Maxwell Products |NUVO, Type C, per lb. |$0.55 |0 % |

|113 |Maxwell Products |NUVO CS 3405 ASTM D 6690 Type I & II, per lb. |$0.57 |0 % |

|114 |Maxwell Products |NUVO Elite, per lb. |$0.68 |0 % |

| | | | | |

|Item # |Contractor |Product |Price |% recycled |

| |Partner Construction |Hot asphalt rubber crack sealants: | | |

|115 |All Counties |ASTM D1190 Type I (D6690) 30# block |$0.65 |4 % |

|116 |Partner Construction |ASTM D1190 Type I (D6690) 2500# Pallet |$0.65 |4 % |

|117 |Partner Construction |ASTM D1190 Type I (D6690) 30# Block |$0.65 |18 % |

|118 |Partner Construction |ASTM D1190 Type I (D6690) 2500# pallet |$0.65 |18 % |

|119 |Partner Construction |ASTM D3405 Type II (D6690) 30# Block |$0.55 |4 % |

|120 |Partner Construction |ASTM D3405 Type II (D6690) 2500# Pallet |$0.55 |4 % |

|121 |Partner Construction |ASTM D3405 Type II (D6690) 30# Block |$0.55 |18 % |

|122 |Partner Construction |ASTM DD3405 Type II (D6990) 2500# Pallet |$0.55 |18 % |

|123 |Partner Construction |Roadsaver low tack 2750# pallet |$0.65 |0 % |

|124 |Partner Construction |Superflex HT (Direct Fire) 2500# Pallet |$0.84 |0 % |

|125 |Partner Construction |Asphalt paving patching & repair product: Cold applied pavement repair |$98.00 |0 % |

| | |materials .55 sq. ft Kit | | |

“OTHER PRODUCTS” PRICING Continued

|Item # |Contractor |Product |Price |% recycled |

| |Partner Construction |Concrete pavement repair products: | | |

|126 |Partner Construction |Delpatch elastomeric concrete .30 cu. Ft. Kit each |$145.00 |0 % |

|127 |Partner Construction |Delpatch elastomeric concrete 3.7 cu ft. Kit each |$950.00 |0 % |

|128 |Partner Construction |Primer used with item 4A. gallon |$24.95 |0 % |

|129 |Partner Construction |Cover material used with item 4A 50# bag |$0.47 |0 % |

| |Partner Construction |Loop sealants & adhesives: | | |

|130 |Partner Construction |Hot applied loop sealant 1700# pallet |$1.75 |0 % |

|131 |Partner Construction |Cold applied loop sealant QT tube each |N/A |0 % |

|132 |Partner Construction |Hot applied flexible marker adhesive 1770# Pallet |$1.05 |0 % |

|133 |Partner Construction |Hot applied temporary marker adhesive #1800 Pallet |$0.65 |0 % |

|134 |Partner Construction |Quickstick each |$16.00 |0 % |

| |Partner Construction |Cleaners & Detackifiers: | | |

|135 |Partner Construction |Liquid sealant detackifier 5 gal pail |$12.75 |0 % |

|136 |Partner Construction |Sealant & asphalt remover 5 gal pail |$29.80 |0 % |

|137 |Partner Construction |Solvs-It asphalt release agent 55 gal drum |$6.30 |0 % |

|138 |Partner Construction |Solvs-It asphalt release agent 5 gal pail |$6.95 |0 % |

|139 |Partner Construction |Oil flo asphalt release & solvent 5 gal pail |$26.95 |0 % |

| |Partner Construction |Waterproofing/pavement fabrics: | | |

|140 |Partner Construction |Geofilm sq. ft. |$0.75 |0 % |

|141 |Partner Construction |Geotac sq. ft. |$0.75 |0 % |

|142 |Partner Construction |Paveprep sq. ft |$1.02 |0 % |

|143 |Partner Construction |Paveprep self adhesive sq. ft. |$1.02 |0 % |

|144 |Partner Construction |Isac sq. ft. |$2.39 |0 % |

| |Partner Construction |Cold Applied Expansion Joint System: | | |

|145 |Partner Construction |ElastroCrete-Black .55 sq. ft. Kit |N/A |0 % |

|146 |Partner Construction |Elastropatch-Gray .55 sq. ft. Kit |N/A |0 % |

|147 |Partner Construction |Rallithane 1.32 gal Kit |$74.95 |0 % |

|148 |Partner Construction |Rallithane primer Liter |$29.00 |0 % |

|149 |Partner Construction |Elastoprimer Liter |$19.50 |0 % |

| |Partner Construction |High Friction Surface (HFS) System: | | |

|150 |Partner Construction |HFS Binder 4.84 gal Kit |$285.00 |0 % |

|151 |Partner Construction |HFS Cover material lb. |$0.60 |0 % |

| | | | | |

|Item # |Contractor |Product |Price |% recycled |

| |Special Asphalt |Hot Pour Crack Sealant: | | |

|152 |All Counties |ASTM D1190 Type I 30# block |$14.45 |0 % |

|153 |Special Asphalt |ASTM D1190 Type I 2250# Pallet |$1,083.24 |0 % |

|154 |Special Asphalt |ASTM D3405 Type II 30# block |$15.29 |0 % |

|155 |Special Asphalt |ASTM D3405 Type II 2250# pallet |$1,146.96 |0 % |

|156 |Special Asphalt |SAP 200 Type I 30# block |$12.32 |18 % |

|157 |Special Asphalt |SAP 200 Type I 2250# Pallet |$923.94 |18 % |

|158 |Special Asphalt |SAP Premier 30# Block |$24.22 |0 % |

|159 |Special Asphalt |SAP Premier 2250# pallet |$1,816.02 |0 % |

|160 |Special Asphalt |SAP 5078 Type I 30# block |$11.89 |20 % |

|161 |Special Asphalt |ASP 5078 Type I 2250# pallet |$892.08 |20 % |

“OTHER PRODUCTS” PRICING Continued

|Item # |Contractor |Product |Price |% recycled |

|162 |Special Asphalt |Loop sealant, hot applied 2250# pallet |$3,759.48 |0 % |

| |Special Asphalt |Deery American: | | |

|163 |Special Asphalt |103 GL, ASTM D6690 Type I, 2500# pallet |$1,019.52 |0 % |

|164 |Special Asphalt |102 GL ASTM D6690, 2250# pallet |$1,083.24 |0 % |

|165 |Special Asphalt |Superflex Cold Pour 5 gal pail |$77.88 |18 % |

|166 |Special Asphalt |EZ Street Cold Mix 50# bag |$14.86 |18 % |

|167 |Special Asphalt |Poly-Oil Seal 5 gal pail |$73.62 |0 % |

|168 |Special Asphalt |Crack Stix 2 gal pail |$70.80 |0 % |

|169 |Special Asphalt |Resurfacer seal coat, gallon |$1.80/gallon |0 % |

|170 |Special Asphalt |Resurfacer XLR8 seal coat, gallon |$1.63/gallon |0 % |

| | | | | |

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download