1.0 SCOPE OF WORK
The work covered by this specification includes the design, testing, and quality control required for the proper production of an emulsified asphalt seal coat product.
2.0 GENERAL
This specification applies to asphalt based seal coats, intended to be used for sealing various asphalt surfaces.
3.0 DESCRIPTION
The seal coat material shall be a plant blended product composed of mineral aggregates, select fillers/fibers and specific additives uniformly distributed, proportioned and mixed in a petroleum-based asphalt emulsion.
4.0 BASE EMULSIONS
The asphalt emulsion shall conform to ASTM D977, SS-1h. The properties of the emulsified asphalt given in table 1 shall be determined in accordance with ASTM test methods D244.
5.0 TESTING REQUIREMENTS
The seal coat materials, undiluted except as noted, shall conform to the following requirements:
SPECIFICATIONS LIMITS TEST METHODS
Cone Flow 2 - 3 ISSA TB 106
% Non-Volatile(1*) Soluble in Triichlorooethlene 10-35 ASTM D2042
Wet Track Abrasion g/ft2 , loss 5 Max ASTM D3910
Loaded Wheel Sand Adhesion(excess Asphalt) g/ft2 10 Max ISSA TB 109
Density, #/gal 9.2(1.114) Min ATSM D244
Mineral Aggregate (2*) Component No. 20 Sieve ASTM C 136
-100% passing
Dried Film Color Black
Viscosity, Poise SP #3, Brookfield 60 Min. ASTM D 2162
Accelerated Weathering SPEC (2 year exposure) No Deterioration FED TT-C-555B
Flow Table, *in. (CM) Diameter 6.5(16.51) - 8.0(20.3)
(1*) Weigh 10 grams of homogenous product into a previously tared small ointment can lid. Place in a constant temperature oven @ 325 F for 90 minutes. Cool, re-weight and calculate non-volatile components.
(2*) Mineral aggregate components shall conform to AB 3098 SMARA compliance list as published in the California Regulatory notice register.
(3*) Determined by flow table apparatus, 25 revolutions.
PRECAUTIONS
Air temperature shall be 55oF and rising. Do not apply if rain is forecast within 48 hours after application. Asphalt should be thoroughly cured before application. New asphalt should be allowed to cure at least 30 days before application. Do not apply if rain is forecast within 48 hours after application. Wash tools in water. Use paint thinner if material has dried. Keep from freezing. Do not store indirect sunlight or where temperatures exceed 100oF. Container should be closed when not in use. Keep out of reach of children.
Due to the wide range of variables affecting the results of application, such as weather conditions, construction equipment, and quality of other materials, there is no warranty, expressed or implied, that following this specification, or using the materials covered thereby, will assure satisfactory results.
MATERIAL SAFETY DATA SHEETS AVAILABLE ON REQUEST
-70 YEARS OF SERVICE TO THE ROAD CONSTRUCTION INDUSTRY-
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
Related searches
- introduction to asphalt pavement course
- asphalt pavement repair
- asphalt pavement thickness design guide
- asphalt pavement association
- national asphalt pavement association
- national asphalt pavement association members
- california asphalt pavement association
- home depot asphalt pavement repair
- national asphalt pavement association 2020
- national asphalt pavement association meeting
- pa asphalt pavement association
- iowa asphalt pavement association