SECTION 407 - VicRoads

Determine the minimum contract duration (or duration or each separable part) from typical asphalt paving rates given in Section 4 of these guide notes. 5. Establish if red asphalt is required and either include appropriate contract specific clauses for the extent of the red asphalt, or strikeout Clause 407.10. ................
................