VE Group, LLC & Alabama Department of Transportation

[Pages:40]Consultant Assisted Statewide

Value Engineering Program

VE Group, LLC &

Alabama Department of

Transportation

9/16/2009

VE Group, LLC

INTRODUCTION

The Alabama Department of Transportation (ALDOT) obtained the services of a Value Engineering (VE) Consultant, VE Group, LLC

9/16/2009

VE Group assists ALDOT in the planning, organizing and management of the Statewide V E Program, project studies, employee training and Design/Constructability Reviews

VE Group, LLC

AAlalabbaammaaDDepepaartrmtmenent toof fTTrarannspspoortratatitoionn CCononsusultlatnant tMMananagaegmemenent tEEnngignineeerer

SStatannBBididddicickk, ,PP.E.E. .

VVEEGGrroouupp

PPrroojejecct tMMaannaaggeerr/V/VaalulueeEEnngginineeeerrininggCCoooorrddininaatotorr WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.C,C.V.V.S.S. .

VVEEGGrroouupp

QQuuaaliltiytyCCoonntrtrool l WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.C,C.V.V.S.S. .

VVEEGGrroouupp

PPrroojejecct tCCoooorrddininaatitoionn/D/DaatataInInppuut t LLaauurreennVVeenntrtryy

VVEEGGrroouupp VVEESStutuddyy/W/WoorrkkshshooppLLeeaaddeerrss WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.C,C.V.V.S.S. . JJeerrrryyLLoovvee, ,PPhhDD.,.,PP.E.E.,.C,C.V.V.S.S. . TThhoommaassAA. .HHaarrtlteleyy, ,PP.E.E.,.,CC.V.V.S.S. .

VVEEGGrroouupp PPrrooggrraammAAsssissitsatannccee WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.,CC.V.V.S.S. . TThhoommaassAA. .HHaarrtlteleyy, ,PP.E.E.,.,CC.V.V.S.S. .

AALLDDOOTT/F/FHHWWAA

VV.E.E. .TTeeaammMMeemmbbeerrss 9/16/2009

VE Group, LLC

VVEEGGrroouupp

VV. .EE. .TTeeaammMMeemmbbeerrss

IDENTIFYING PROJECTS

VE Group has assisted in the establishment and management of an annual Value Engineering Work Program

Projects at the Concept Phase, and/or early Design Phase are being considered potential Value Engineering candidates

The Value Engineering Work Program is reviewed and updated by the VE Group, as project schedules slip or advance

9/16/2009

VE Group, LLC

IDENTIFYING PROJECTS

9/16/2009

VE Group, LLC

IDENTIFYING PROJECTS

9/16/2009

VE Group, LLC

SCHEDULING PROJECT STUDIES

9/16/2009

VE Group has assisted in the scheduling of projects identified for Value Engineering studies

The projects include working with both Project managers of Consultants, as well as in-house designers

VE Group works with both Division Office Project Managers as well as Headquarters Project Managers

VE Group, LLC

ALABAMA DEPARTMENT OF TRANSPORTAION/VE GROUP ~ VALUE ENGINEERING STUDY PLAN

VE GROUP STUDY #

REFERENCE NUMBER

ROUTE

DESCRIPTION

DIVISION/DESIGN

CATEGORY

PROJECT MANAGER, ADDRESS,

EMAIL, & PHONE NUMBER

LETTING DATE

CONSTRUCTION COST

LENGTH OF STUDY STUDY DATES

STUDIES FOR FY08/09 (September 30, 2008-October 1, 2009)

1

100004580

US 331

Adl. Lns. for 2000' S of SR 94 to near Legrand

6th Division Montgomery

Carol Hall

Grade, Drain, Base, and

Pave

Hallc@doe.state.al.us

334/261-3736

2/2009

13,520,000

3-Days Constructability

November 12-14, 2008

SR 2

Design Location

Wade Henry Grade, Drain, Base,

2

100039057

(US-72,

From Maysville Rd to Shield's Rd inclu. Intch. @ Moore's Mill & Shield's Rd.

Section

henryw@dot.state.al.us

Pave, and Bridge

Corr. V)

Montgomery

334/242-6464

11/2009

20,315,044

5-Days

December 15-19, 2008

Pavt rubbl fr mp 182.09 to E end Snow CK BR MP; add inside lns for traf control;

4th Division

Steve Haynes

3

100033440

I-20

Pavement Rehab hayness@dot.state.al.us

replc BRGs @ SR21

Alexander City

256/234-8420

Addl outside Lns from MP 147.9 @ end of 40' median to MP 155.77 Near Bef

3rd Division

Lance Taylor Additional Roadway

4

100041158

I-20

taylorl@dot.state.al.us

Cons PVT to incl Brdg Repl, widening, & raising

Birmingham

Lanes

205/581-5623

I-59 Concrete Pavement Rehab w/unbounded overlay Fr Atalla City Limits to CR-

1st Division

Curtis Vincent

5

100049055

I-59

Pavement Rehab vincentc@dot.state.al.us

276 (Stephens Gap Road)

Guntersville

256/571-7250

SR-77 Fr CR-162 (Steel Station Rd) To I-59 Ramps (East Side) Attalla, Includes

1st Division

Curtis Vincent Additional Roadway

5a

100004851

SR-77

vincentc@dot.state.al.us

Bridge Replacement Bin 002037

Guntersville

Lanes

256/571-7250

3/2009 11/2010 3/2009 11/2009

41,100,800 60,817,988 69,561,444 $9,561,344

3-Days Constructability

January 21-23, 2009

3-Days

February 2-4, 2009

3-Days Constructability

February 9-11, 2009

3-Days Constructability

February 11-13, 2009

9th Division

Jackie Glasgow Grade, Drain, Base,

6

100004939

I-10

Additional Lanes on I-10 From CR-59 (Carol Plantation Rd.) To Halls Mill Creek

glasgowj@dot.state.al.us

Mobile

Pavement & Bridges

251/470-8220

11/2010

23,212,430

3-Days Constructability

February 17-19, 2009

5th Division

David Kemp Grade, Drain, Base, &

7

10004617

SR-6/US-82 SR-6 (US-82) Add Lanes in Northport from SR-69 To CR-30 (Rice Mine Road)

kempd@dot.state.al.us

Tuscaloosa

Pavement

205/554-3244

David Welch/Stan Biddick

8

100038084

SR 959

Birmingham N Beltline from S of CR 77 NE of Broookside to CR 21 N of

Design/ CMS

Grade, Drain,& Bridge welchd@dot.state.al.us

Crosston plus CR 21 to CR 79

Montgomery

334/242-6101

9

100050874

I-565

I-565 Interchange Modification @ County Line Road

Design CMS Montgomery

Interchange Modification

David Welch/Stan Biddick welchd@dot.state.al.us 334/242-6101

5th Division

David Kemp

10

I-59

Tuscaloosa E. Bypass

kempd@dot.state.al.us

Tuscaloosa

205/554-3244

11

100004982

I-59

Add lns from SR 7 (US 11, 1st Ave N) to I-459

3rd Division Birmingham

Additional Roadway Lanes

Lance Taylor taylorl@dot.state.al.us 205/581-5623

9/2009 6/2009 6/2009 9/2009 11/2009

26,976,602 263,184,000 20,000,000

33,745,920

3-Days Constructability

March 4-6, 2009

5Days

March 23-27, 2009

5-Days

April 6-10, 2009

5-Days

April 20-24, 2009

5-Days

May 11-15, 2009

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download