VE Group, LLC & Alabama Department of Transportation
[Pages:40]Consultant Assisted Statewide
Value Engineering Program
VE Group, LLC &
Alabama Department of
Transportation
9/16/2009
VE Group, LLC
INTRODUCTION
The Alabama Department of Transportation (ALDOT) obtained the services of a Value Engineering (VE) Consultant, VE Group, LLC
9/16/2009
VE Group assists ALDOT in the planning, organizing and management of the Statewide V E Program, project studies, employee training and Design/Constructability Reviews
VE Group, LLC
AAlalabbaammaaDDepepaartrmtmenent toof fTTrarannspspoortratatitoionn CCononsusultlatnant tMMananagaegmemenent tEEnngignineeerer
SStatannBBididddicickk, ,PP.E.E. .
VVEEGGrroouupp
PPrroojejecct tMMaannaaggeerr/V/VaalulueeEEnngginineeeerrininggCCoooorrddininaatotorr WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.C,C.V.V.S.S. .
VVEEGGrroouupp
QQuuaaliltiytyCCoonntrtrool l WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.C,C.V.V.S.S. .
VVEEGGrroouupp
PPrroojejecct tCCoooorrddininaatitoionn/D/DaatataInInppuut t LLaauurreennVVeenntrtryy
VVEEGGrroouupp VVEESStutuddyy/W/WoorrkkshshooppLLeeaaddeerrss WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.C,C.V.V.S.S. . JJeerrrryyLLoovvee, ,PPhhDD.,.,PP.E.E.,.C,C.V.V.S.S. . TThhoommaassAA. .HHaarrtlteleyy, ,PP.E.E.,.,CC.V.V.S.S. .
VVEEGGrroouupp PPrrooggrraammAAsssissitsatannccee WWilillilaiammFF. .VVeenntrtryy, ,PP.E.E.,.,CC.V.V.S.S. . TThhoommaassAA. .HHaarrtlteleyy, ,PP.E.E.,.,CC.V.V.S.S. .
AALLDDOOTT/F/FHHWWAA
VV.E.E. .TTeeaammMMeemmbbeerrss 9/16/2009
VE Group, LLC
VVEEGGrroouupp
VV. .EE. .TTeeaammMMeemmbbeerrss
IDENTIFYING PROJECTS
VE Group has assisted in the establishment and management of an annual Value Engineering Work Program
Projects at the Concept Phase, and/or early Design Phase are being considered potential Value Engineering candidates
The Value Engineering Work Program is reviewed and updated by the VE Group, as project schedules slip or advance
9/16/2009
VE Group, LLC
IDENTIFYING PROJECTS
9/16/2009
VE Group, LLC
IDENTIFYING PROJECTS
9/16/2009
VE Group, LLC
SCHEDULING PROJECT STUDIES
9/16/2009
VE Group has assisted in the scheduling of projects identified for Value Engineering studies
The projects include working with both Project managers of Consultants, as well as in-house designers
VE Group works with both Division Office Project Managers as well as Headquarters Project Managers
VE Group, LLC
ALABAMA DEPARTMENT OF TRANSPORTAION/VE GROUP ~ VALUE ENGINEERING STUDY PLAN
VE GROUP STUDY #
REFERENCE NUMBER
ROUTE
DESCRIPTION
DIVISION/DESIGN
CATEGORY
PROJECT MANAGER, ADDRESS,
EMAIL, & PHONE NUMBER
LETTING DATE
CONSTRUCTION COST
LENGTH OF STUDY STUDY DATES
STUDIES FOR FY08/09 (September 30, 2008-October 1, 2009)
1
100004580
US 331
Adl. Lns. for 2000' S of SR 94 to near Legrand
6th Division Montgomery
Carol Hall
Grade, Drain, Base, and
Pave
Hallc@doe.state.al.us
334/261-3736
2/2009
13,520,000
3-Days Constructability
November 12-14, 2008
SR 2
Design Location
Wade Henry Grade, Drain, Base,
2
100039057
(US-72,
From Maysville Rd to Shield's Rd inclu. Intch. @ Moore's Mill & Shield's Rd.
Section
henryw@dot.state.al.us
Pave, and Bridge
Corr. V)
Montgomery
334/242-6464
11/2009
20,315,044
5-Days
December 15-19, 2008
Pavt rubbl fr mp 182.09 to E end Snow CK BR MP; add inside lns for traf control;
4th Division
Steve Haynes
3
100033440
I-20
Pavement Rehab hayness@dot.state.al.us
replc BRGs @ SR21
Alexander City
256/234-8420
Addl outside Lns from MP 147.9 @ end of 40' median to MP 155.77 Near Bef
3rd Division
Lance Taylor Additional Roadway
4
100041158
I-20
taylorl@dot.state.al.us
Cons PVT to incl Brdg Repl, widening, & raising
Birmingham
Lanes
205/581-5623
I-59 Concrete Pavement Rehab w/unbounded overlay Fr Atalla City Limits to CR-
1st Division
Curtis Vincent
5
100049055
I-59
Pavement Rehab vincentc@dot.state.al.us
276 (Stephens Gap Road)
Guntersville
256/571-7250
SR-77 Fr CR-162 (Steel Station Rd) To I-59 Ramps (East Side) Attalla, Includes
1st Division
Curtis Vincent Additional Roadway
5a
100004851
SR-77
vincentc@dot.state.al.us
Bridge Replacement Bin 002037
Guntersville
Lanes
256/571-7250
3/2009 11/2010 3/2009 11/2009
41,100,800 60,817,988 69,561,444 $9,561,344
3-Days Constructability
January 21-23, 2009
3-Days
February 2-4, 2009
3-Days Constructability
February 9-11, 2009
3-Days Constructability
February 11-13, 2009
9th Division
Jackie Glasgow Grade, Drain, Base,
6
100004939
I-10
Additional Lanes on I-10 From CR-59 (Carol Plantation Rd.) To Halls Mill Creek
glasgowj@dot.state.al.us
Mobile
Pavement & Bridges
251/470-8220
11/2010
23,212,430
3-Days Constructability
February 17-19, 2009
5th Division
David Kemp Grade, Drain, Base, &
7
10004617
SR-6/US-82 SR-6 (US-82) Add Lanes in Northport from SR-69 To CR-30 (Rice Mine Road)
kempd@dot.state.al.us
Tuscaloosa
Pavement
205/554-3244
David Welch/Stan Biddick
8
100038084
SR 959
Birmingham N Beltline from S of CR 77 NE of Broookside to CR 21 N of
Design/ CMS
Grade, Drain,& Bridge welchd@dot.state.al.us
Crosston plus CR 21 to CR 79
Montgomery
334/242-6101
9
100050874
I-565
I-565 Interchange Modification @ County Line Road
Design CMS Montgomery
Interchange Modification
David Welch/Stan Biddick welchd@dot.state.al.us 334/242-6101
5th Division
David Kemp
10
I-59
Tuscaloosa E. Bypass
kempd@dot.state.al.us
Tuscaloosa
205/554-3244
11
100004982
I-59
Add lns from SR 7 (US 11, 1st Ave N) to I-459
3rd Division Birmingham
Additional Roadway Lanes
Lance Taylor taylorl@dot.state.al.us 205/581-5623
9/2009 6/2009 6/2009 9/2009 11/2009
26,976,602 263,184,000 20,000,000
33,745,920
3-Days Constructability
March 4-6, 2009
5Days
March 23-27, 2009
5-Days
April 6-10, 2009
5-Days
April 20-24, 2009
5-Days
May 11-15, 2009
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- ve group llc alabama department of transportation
- all facilities in alabama alabama department of public
- etowah 1 cemetery locale location church affiliation and
- 015203 07 15 2015 name of provider
- number of portables used as classrooms as of march 1999
- attalla city schools local wellness policy
- alabama 468 s perry street montgomery alabama 36130 0900
- 2020 rsvp competition areas affected houston henry and
- nursing home survey report details for attalla health and
Related searches
- department of transportation columbus ohio
- department of transportation columbus ga
- texas department of transportation drivers license renewal
- pa department of transportation forms
- florida department of transportation toll pay
- florida department of transportation pay tolls
- oregon department of transportation forms
- department of transportation medical certificate
- ohio department of transportation website
- ohio department of transportation projects