11.3 Calculate Projected Costs with the Cumulative Average ...

The cumulative average time per building is .9 person-years. Therefore, the building team can be said to be on a 90% cumulative average learning curve. The table below shows the expected cumulative average for the 1st, 2nd, 4th, 8th and 16th buildings, based on this learning curve. ................
................