00 51 00.04 RETURN OF CERTIFIED CHECK

[Pages:4]CITY OF BALTIMORE DEPARTMENT OF PUBLIC WORKS SPECIFICATIONS FOR MATERIALS, HIGHWAYS, BRIDGES, UTILITIES, AND

INCIDENTAL STRUCTURES

00 51 00.04 RETURN OF CERTIFIED CHECK

A. All bids shall remain open and subject to acceptance at any time for sixty (60) Calendar Days after the award of the Contract to the successful Bidder. However, the City may, in its sole discretion, release any Bid and return the Bid security prior to the expiration of the sixty (60) day period set forth above. The Bid security of the successful Bidder shall be retained until such Bidder has executed the Contract, furnished any required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the successful Bidder fails to execute and deliver the Contract and/or furnish the required Contract security, insurance certificates and other required information within ten (10) business days after receipt of the Notice of Award, the City may annul the Notice of Award, whereupon the Bid security of that Bidder shall be forfeited to the City. B. In the case of Bid checks of less than five thousand dollars ($5,000), which have been deposited by the City, reimbursement will be made by the City in the amount of said check as indicated above.

Green Book 00 51 00.04 March 30, 2006 ? REV.

PATCH EXISTING PAVEMENT AND RESET UTILITY SERVICES

1. 32 01 30.10 Section 3.6 A3 a : Change, For Overall Condition Index (OCI) of 3,4,or 5: to For Overall Condition Index (OCI) of Standard:

2. 32 01 30.10 Section 3.6 A3 a1 : Change, If the existing wearing surface has an OCI of 3,4, or 5... to If the existing wearing surface has an OCI of Standard...

3. 32 01 30.10 Section 3.6 A3 b : Change, For Overall Condition Index (OCI) of 1 or 2: to For Overall Condition Index (OCI) of Revised:

4. 32 01 30.10 Section 3.6A 3b1 : Change, If the existing wearing surface has an OCI of 1 or 2...to If the existing wearing surface has an OCI of Revised...

5. 32 01 30.10 Section 3.6 B3 a : Change, For Overall Condition Index (OCI) of 3,4 or 5: to For Overall Condition Index (OCI) of Standard:

6. 32 01 30.10 Section 3.6 B3 a1 : Change, If the existing wearing surface has an OCI of 3,4 or 5...to If the existing wearing surface has an OCI of Standard...

7. 32 01 30.10 Section 3.6 B3 b : Change, For Overall Condition Index (OCI) of 1 or 2: to For Overall Condition Index (OCI) of Revised:

8. 32 01 30.10 Section 3.6 B3 b1 : Change, If the existing wearing surface has an OCI of 1 or 2...to If the existing wearing surface has an OCI of Revised...

Green Book 32 01 30.10 July 1, 2007 - REV

CONTRACTOR TO EXECUTE REQUIRED DOCUMENTS AND START WORK PROMPTLY

The successful Bidder shall promptly execute and submit a formal Contract, all subcontract agreements in accordance with Article 5 Subtitle 28 of the Baltimore City Code, any and all contract documents specified in an Award Letter, the required Bonds, and all insurance policies or certified copies thereof issued in favor of the Mayor and City Council of Baltimore, as provided in the Special Provisions, all of which shall be subject to the approval of the City Solicitor as to form, terms and conditions. Failure to comply with these requirements within thirty (30) calendar days after the Award shall be just cause for the annulment of the Award. It is understood and agreed that in the event of annulment of the Award, the Board of Estimates may require the Bidder to forfeit, to the use of the City, the amount of the certified check deposited with its Proposal, not as penalty, but as liquidated damages. As an alternative remedy, the City may elect to start the running of contract time (without allowing the Contractor to start work) or to pursue any other remedy allowed to the City under the law or equity.

Green Book 00 51 00.07 July 1, 2007 ? REV.

34 41 13 TRAFFIC SIGNALS 34 41 13.30 SIGNAL HEADS

PART 1 GENERAL 1.1 DESCRIPTION

This Work shall consist of furnishing and installing vehicle traffic control signal heads and countdown pedestrian traffic control....

PART 2 PRODUCTS 2.1 MATERIALS

A. Traffic Signal Heads shall conform to the following: 1. Countdown pedestrian signal indications..... a. remains the same b. remains the same c. remains the same d. remains the same e. remains the same f. Countdown pedestrian signal indicators will be used for all new installations and replacements of existing pedestrian signals.

Part 4 MEASUREMENT AND PAYMENT

Aluminum, Polycarbonate and Optically Programmed Signal Heads and Countdown Pedestrian Signal Indications......

Green Book 34 41 13.30 July 1, 2007 ? REV.

................
................