Chapter 3 FOUNDATIONS AND FOUNDATION WALLS

Chapter 3, Foundations and Foundation Walls 55 In SDCs D1 and D2, No. 4 vertical reinforcing is required at 48-inch maximum spacing if a construction joint (also called a “cold joint”) occurs between the footing and the stem wall. This often is referred to as a “two-pour” foundation because the concrete for … ................
................