CMP Affaldsplan 2011 - Home - CMP



Annex 4 Sewage (Black water and Grey water)

|Ship name:       |Berth no. m602 |

|IMO number:       | |

|Estimated volume of Sewage:      m3 |Treated wastewater:      m3 | |

|Total volume Sewage tanks:      m3 |Wastewater tanks:      m3 |

| | |

|Date of last sewage discharge: DD/MM/YYYY |Total amount discharged:      m3 |

To treat sewage properly, Copenhagen Malmö port requests you to answer the following questions. Please mark if relevant:

Only black water

Only grey water

Black and grey water

Grinder in kitchen is connected to sewage tank

Sewage is untreated

Chemicals have been added to reduce hydrogen sulphide levels

Chemicals have been added to reduce methane levels

The sewage tank has been aerated to reduce hydrogen sulphide and / or methane levels

The sewage tank has been drained to reduce volume

The following conditions apply:

• Hose flushing shall be done from the ship

• Maximum discharge capacity in Malmö is 150 m3

• Maximum discharge pressure shall not exceed 5 bar

• Hose and flanges specifications shall correspond with the specifications for Copenhagen according to the Waste Management Plan, section 8, p. 11

I hereby declare the above stated to be true

|Delivery Date: DD/MM/YYYY |Time: HH:MM |Name / Signature:       |

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download