Www.dhs.pa.gov



COMMONWEALTH OF PENNSYLVANIA

HEALTH & HUMAN SERVICES DELIVERY CENTER

INFORMATION TECHNOLOGY PROCEDURE

|Name of Procedure: |Number: |

|Network Assessments |PRO-ENSS006 |

|Domain: |Category: |

|Network |Network Design |

|Date Issued: |Issued By: |

|05/09/2001 |[pic] |

| |John Tamosaitis, Network Manager |

| |Health & Human Services Delivery Center |

| Date Revised: | |

|05/15/2020 | |

Abstract:

The Health and Human Services Delivery Center (HHS DC) supports the Departments of Health (DOH), Human Services (DHS), Aging (PDA), Drug and Alcohol Programs (DDAP) and Military and Veterans Affairs (DMVA).

General:

Each site at the Health & Human Services Delivery Center (HHS DC) connected to the HHS DC network may need upgrades and performance improvements to its site network. The HHS DC, Health & Human Services Delivery Center contracts vendors for site-specific network surveys and upgrades. It creates and submits a statement of work (SOW) to vendors to do the survey(s). A chosen vendor that agrees to the SOW performs the network survey(s).

The deliverable expected of the vendor doing the network survey(s) is a Network Design Report (NDR) for each site surveyed. The vendor uses the network assessment information in this document to create one NDR per site-specific, network survey.

See Example of a Statement of Work to a Vendor for a Network Survey and Analysis for an example of an SOW for a network survey.

See “Appendix I: ” for assistance completing this template.

The Network Assessment starts at the “Network Design Report” section and runs to the “Appendix I: Completing the Network Design Report” section of this document.

The purpose of this document is to provide instructions for creating an NDR.

Procedure:

Network Design Report

I. Executive Summary (to be completed by TSO person)

This section is a brief summary of the overall site assessment results including costs, timelines for projection completion, summary of the work and changes to be made. The expected improvements in performance and other points will be included as well.

II. Overview (to be completed by site ITC person)

Date of the Initial Request from Program Office:

POC Name:

Phone: Email:

Site Contact:

Phone: Email:

Location:

Address:

Address:

Phone:

Date the site assessment assigned:

BTE Person Name:

Phone: Email:

List of the buildings, floors, and rooms to be included in the assessment (attach additional sheet, maps, Visio drawings, if needed):

|Building/Room |Floor |Equipment |IP ADDRESS |

|12 |1 |Router |xxx.xxx.xxx.xxx |

| | | | |

| | | | |

| | | | |

Description of the major problems:

Summarize the kinds of problems users are experiencing in performance, recurring troubles, disconnections, and so on.

|Problem Name |Problem Summary Description |

| | |

| | |

| | |

| | |

| | |

| | |

III. Site Assessment Findings (to be completed by TSO)

General Description of the Findings from the site visit:

(List persons involved by name and title.)

Environmental Issues:

(List specific problems of space, access to wiring and conduits).

Changes to Section II inventory:

|Building/Room |Floor |Equipment |IP ADDRESS |

|12 |1 |Router |xxx.xxx.xxx.xxx |

| | | | |

| | | | |

| | | | |

List any training issues, problems or needs:

Summarize Site Assessment observations:

(A brief descriptive of the visit and any changes, suggestions and discussions. Include names, action plan responsibilities, and so on.)

IV. Site design recommendations (new or existing) (to be completed by TSO)

General description:

(Include and overview and rationale for the recommendation…how will users benefit?)

List specific recommendations for upgrades and changes:

1. Cabling and infrastructure changes:

2. Electronics recommendations:

3. List any areas not included in the plan and the reasons:

(What equipment will remain in the network and why)?

4. List the plan phases for implementation, if appropriate:

List training by title and job function with reasons:

Summarize Site Assessment recommendations:

(Include a brief descriptive of the observations and plans as listed above.)

V. Recommended Implementation stages and timeframes (to be completed by TSO)

VI. Estimates of time and materials (attach vendor quotes)

Site Preparations:

Cabling:

Electronics:

SLA and maintenance contracts:

VII. Project Costs (to be completed by TSO)

(Summarize all related costs in time, materials, and other items.)

Appendix I

Completing the Network Design Report

Use the following outline while writing the network design report (NDR).

I. Executive Summary

Write a short narrative including conclusions and recommendations.

II. Overview of Work Completed

Survey assessment process description. Include times, dates and contacts.

Location Description: department, bureau, and so on.

Building Description: for each building surveyed, assessed, and included in the recommendations.

Local staff-interview summaries: findings and needs as identified.

III. Survey Assessments Findings

General Observations.

Environmental Observations (include potential problems for design changes).

Existing Infrastructure (by building and as configured to the network).

Existing Cabling (by building and as configured to the network).

Existing Electronics (by building and as configured to the network).

Training Issues.

Summary of Findings.

IV. Recommendations for Infrastructure Upgrades

General Recommendations.

Infrastructure Upgrade Recommendations Overview and Rational.

Site Preparations Recommendations (by building and as configured).

Cabling Recommendations (by building and as configured to the network).

Electronics Recommendations (by building and as configured to the network).

Training Recommendations.

Summary of the upgrade recommendations.

V. Recommended Implementation Strategies

Site/Cabling Implementation Strategy: includes a schematic diagram and projected completion timetable.

Electronics Implementation Strategy: includes a projected completion timetable.

Workstation Implementation Strategy: include a projected completion timetable.

Overall Location Upgrade Strategy: including a phased approach to allow for budget or staff support limitations, includes a projected completion timetable for each phase and interdependencies between phases.

VI. Estimate of Time and Materials (Listed)

Site Preparations – including all incidentals (be specific).

Cabling.

Electronics.

Other System Incidentals (be specific).

VII. Projected Costs

Design

Materials

Labor

Refresh Schedule:

All procedures and referenced documentation identified in this document will be subject to review and possible revision annually or upon request by the HHS Delivery Center Domain Leads.

Procedure Revision Log:

|Change Date |Version |Change Description |Author and Organization |

|05/09/2001 |1.0 |Initial creation |DPW |

|08/16/2002 |1.1 |Edited for style |Beverly Shultz |

|12/13/2004 |1.1 |Date Changed |Tom Zarb, DTE |

|01/18/2008 |1.2 |Minor changes placed into new format |Doug Rutter, DTE |

|06/21/2010 |1.3 |Changed BTE to DTE |Doug Rutter |

|11/12/2013 |1.4 |Reviewed with minor grammar corrections |Matthew Messinger |

|3/16/15 |1.5 |Changed DPW to DHS brand |Bob Gordon |

|03/07/2016 |1.5 |Reviewed content – No change |Aamir Qureshi |

|4/29/2020 |1.6 |Organization Name Change |HHS TSO |

|05/06/2020 |1.6 |Reviewed content |Bob Gordon, HHS Network |

................
................