FIELD INSPECTION CHECKLIST



Commercial Building Data Collection Checklist

2009 International Energy Conservation Code

Building ID:       Climate Zone:      

Date:       Name of Evaluator(s):      

Building Contact: Name:       Phone:       Email:      

Building Name & Address:       Conditioned Floor Area:       ft2

State:       County:       Jurisdiction:      

Compliance Approach (check all that apply): Prescriptive Trade-Off Performance

Compliance Software (if used):       Green/Above-Code Program:      

Building Use: Office Retail/Mercantile Warehouse/Storage Education/School Lodging/Hotel/Motel

Restaurant/Dining/Fast Food Public Assembly/Religious Healthcare High-Rise Residential Other

Building Ownership: State-owned Local government-owned National account Speculative Private Other

Project Type: New Building Existing Building Addition Existing Building Renovation Valuation (If Renovation): $      

|2009 IECC |Plan Review |Complies |Comments/Assumptions |

|Section # | | | |

| | |Y |N |N/A | |

|103.2 |Plans and/or specifications provide all information with which | | | |      |

|[PR1]1 |compliance can be determined for the building envelope and delineate | | | | |

| |and document where exceptions to the standard are claimed. | | | | |

|103.2 |Plans, specifications, and/or calculations provide all information | | | |      |

|[PR2]1 |with which compliance can be determined for the mechanical systems and| | | | |

| |equipment and delineate and document where exceptions to the standard | | | | |

| |are claimed. | | | | |

|103.2 |Plans, specifications, and/or calculations provide all information | | | |      |

|[PR3]1 |with which compliance can be determined for the service water heating | | | | |

| |systems and equipment and delineate and document where exceptions to | | | | |

| |the standard are claimed. | | | | |

|103.2 |Plans, specifications, and/or calculations provide all information | | | |      |

|[PR4]1 |with which compliance can be determined for the lighting and | | | | |

| |electrical systems and equipment and delineate and document where | | | | |

| |exceptions to the standard are claimed. Information provided should | | | | |

| |include interior and exterior lighting power calculations, wattage of | | | | |

| |bulbs and ballasts, transformers and control devices. | | | | |

Additional Comments/Assumptions:      

General building information only required if different than above Building ID:      

Date:       Name of Evaluator(s):      

Building Contact: Name:       Phone:       Email:      

Building Name & Address:       Conditioned Floor Area:       ft2

Compliance Approach (check all that apply): Prescriptive Trade-Off Performance

Compliance Software (if used):       Green/Above-Code Program:      

|2009 IECC |Footing / Foundation Inspection |Verified Value |Complies |Comments/Assumptions |

|Section # | | | | |

| | | |Y |N |N/A | |

|502.2.4 |Below-grade wall insulation R-value. |R-      | | | |      |

|[FO1]2 | | | | | | |

|303.2 |Below-grade wall insulation installed per manufacturer’s | | | | |      |

|[FO2]2 |instructions. | | | | | |

|303.2 |Slab edge insulation installed per manufacturer’s | | | | |      |

|[FO4]2 |instructions. | | | | | |

|503.2.4.5 |Freeze protection and snow/ice melting system sensors for | | | | |      |

|[FO9]3 |future connection to controls. | | | | | |

Additional Comments/Assumptions:      

General building information only required if different than above Building ID:      

Date:       Name of Evaluator(s):      

Building Contact: Name:       Phone:       Email:      

Building Name & Address:       Conditioned Floor Area:       ft2

Compliance Approach (check all that apply): Prescriptive Trade-Off Performance

Compliance Software (if used):       Green/Above-Code Program:      

|2009 IECC |Framing / Rough-In Inspection |Verified Value |Complies |Comments/Assumptions |

|Section # | | | | |

| | | |Y |N |N/A | |

|502.4.1, |Fenestration meets maximum air leakage requirements. |      cfm/ ft2 | | | |      |

|502.4.2 | | | | | | |

|[FR1]3 | | | | | | |

|303.2 |Roof insulation R-value installed per manufacturer’s | | | | |      |

|[FR6]1 |instructions. | | | | | |

|502.3.2 |Skylight fenestration U-Factor. |U-      | | | |      |

|[FR9]1 | | | | | | |

|502.3.2 |Vertical fenestration SHGC value. |SHGC: | | | |      |

|[FR10]1 | |      | | | | |

|502.3.2 |Skylight SHGC value. |SHGC: | | | |      |

|[FR11]1 | |      | | | | |

|303.1.3 |Fenestration products rated in accordance with NFRC. | | |

|[FR12]2 | | | |

| | |Y |N |N/A | |

|504.5 |Piping for recirculating and non-recirculating service hot-water | | | |      |

|[PL1]2 |systems insulated. | | | | |

|504.3 |Temperature controls installed on service water heating systems | | | |      |

|[PL2] 3C |2 fixtures in same space on same | | | | |

| |control. | | | | |

|505.4 |Exit signs do not exceed 5 watts per face. | | | |      |

|[EL6] 1 | | | | | |

|505.6.1 |Exterior grounds lighting over 100 W provides | | | |      |

|[EL7] 1 |>60 lm/W unless on motion sensor or fixture is exempt from scope | | | | |

| |of code or from external LPD. | | | | |

Additional Comments/Assumptions:      

General building information only required if different than above Building ID:      

Date:       Name of Evaluator(s):      

Building Contact: Name:       Phone:       Email:      

Building Name & Address:       Conditioned Floor Area:       ft2

Compliance Approach (check all that apply): Prescriptive Trade-Off Performance

Compliance Software (if used):       Green/Above-Code Program:      

|2009 IECC |Insulation Inspection |Verified Value |Complies |Comments/Assumptions |

|Section # | | | | |

| | | |Y |N |N/A | |

|502.4.3 |All sources of air leakage in the building thermal | | | | |      |

|[IN1] 1 |envelope are sealed, caulked, gasketed, weather | | | | | |

| |stripped or wrapped with moisture vapor-permeable | | | | | |

| |wrapping material to minimize air leakage. | | | | | |

|303.2 |Roof insulation installed per manufacturer’s | | | | |      |

|[IN3] 1 |instructions. | | | | | |

|303.2 |Above-grade wall insulation installed per | | | | |      |

|[IN7] 1 |manufacturer’s instructions. | | | | | |

|303.2 |Floor insulation installed per manufacturer’s instructions. | | |

|[IN9] 2 | | | |

| | |Y |N |N/A | |

|502.4.6 |Weatherseals installed on all loading dock cargo doors in all zones.| | | |      |

|[FI1] 1 | | | | | |

|503.2.4.1 |Heating and cooling to each zone is controlled by a thermostat | | | |      |

|[FI2] 2 |control. | | | | |

|503.2.4.2, |Temperature controls have the following features: dead band | | | |      |

|503.2.4.3 |controls, setpoint overlap restrictions, off-hour controls, | | | | |

|[FI3] 2 |automatic shutdown, setback controls. | | | | |

|503.2.4.1.1 |Heat pump controls prevent supplemental electric resistance heat | | | |      |

|[FI5] 3 |from coming on when not needed. | | | | |

|502.4.8 |Recessed luminaires in thermal envelope to limit infiltration and be| | | |      |

|[FI20iecc]3 |IC rated and labeled. Seal between interior finish and luminaire | | | | |

| |housing. | | | | |

|503.2.2 |HVAC systems and equipment capacity does not exceed calculated | | | |      |

|[FI21iecc]3 |loads. | | | | |

|504.3 |Public lavatory faucet water temperature not greater than 110 oF. | | | |      |

|[FI11] 3 | | | | | |

|504.5 |Insulate automatic circulating hot water systems and 1st eight feet | | | |      |

|[FI19iecc] 2 |of non-circulating systems without integral heat traps. | | | | |

|504.7.1 |Pool heaters are equipped with on/off switch and no continuous | | | |      |

|[FI13] 3C |burning pilot light. | | | | |

|504.7.3 |Pool covers are provided for heated pools and pools heated to >90˚F | | | |      |

|[FI4]2C |have a cover >R-12. | | | | |

|504.7.2 |Time switches are installed on all pool heaters and pumps. | | | |      |

|[FI15]3C | | | | | |

|503.2.9.3 |Furnished O&M instructions for systems and equipment to the building| | | |      |

|[FI17]3 |owner or designated representative. | | | | |

|505.5, |Installed lamps and fixtures are consistent with what is shown on | | | |      |

|505.6 |the approved lighting plans. | | | | |

|[FI18] 1 | | | | | |

Additional Comments:      

KEY |1 |High Impact (Tier 1) |2 |Medium Impact (Tier 2) |3 |Low Impact (Tier 3) |C |Complex Mechanical | |

Evaluator Assessment

Please provide a general description of what was discovered during the onsite evaluation, and a professional estimate of what you feel the compliance rating should be, regardless of the individual metrics scored above. Include your assessment of the most impactful energy requirements for this particular building.

     

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download