PROJECCTT VVAALLUUAATTIIOONN ETTAABBLLE

City of Huntington Beach

Department of Community Development

BUILDING PERMIT FEES

2000 Main Street, Huntington Beach, CA 92648 Office: (714) 536-5241 Fax: (714) 374-1647

Fee Type Permit Processing Charge Building Inspection Fees

Foundation or Partial Building Inspection

How Determined

Flat fee @ Permit or Plan Review Submittal Based upon Building Valuation Table for construction costs per sq. ft. to determine project valuation Based upon Building Valuation Table for construction costs per sq. ft. to determine project valuation

Rate

$32.00 See Table

Below See Table

Below

PROJECT VALUATION TABLE

Based on Building Valuation Data Published in the 2008 July-August Building Standards Journal

by the International Code Council and

local miscellaneous categories that have been surveyed

Project Valuation

Inspection Fees

$1 to $500 $501 to $2,000 $2,001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,001 to $500,000 $500,001 to $1,000,000 $1,000,000 and up

$52.00 $52.00 for the first $500; plus $3.31 for each additional $100 or fraction thereof, to and Including $2,000 $101.00 for the first $2,000; plus $14.89 for each additional $1,000 or fraction thereof, to and including $25,000 $444.00 for the first $25,000; plus $10.75 for each additional $1,000 or fraction thereof, to and including $50,000 $713.00 for the first $50,000; plus $7.43 for each additional $1,000 or fraction thereof, to and including $100,000 $1,086.00 for the first $100,000; plus $5.39 for each additional $1,000 or fraction thereof, to and including $500,000 $3,461.00 for the first $500,000; plus $5.05 for each additional $1,000 or fraction thereof, to and including $1,000,000 $5,985.00 for the first $1,000,000; plus $3.88 for each additional $1,000 or fraction thereof

A 6.0% Automation Fee will be added to all fees listed pursuant to Resolution 2016-59

G:\BuildingAdmin/Web/Fee Schedule 01/06/17.doc Effective 01/06/2017

- 1 -

OTHER BUILDING DIVISION CHARGES

(714) 536-5241

Fee Type

How Determined

Building Plan Review

Refund Processing Fee Record Retention Fee

Counter Staff Research:

Copies from Microfilm (in addition to Research) Copies Not on Microfilm (in addition to Research) Plan Review Extension Building Permit Extension Building Relocation Inspection Investigation Fee-for work performed without a permit or inspection

Re-inspection NPDES Inspection Fee Processing Fee

(Change of contractor, owner, or Special Inspector Program)

Permit Supplement

(Issue Revised Permits, Adjust Permits, Admin. Permits, or those NOT LISTED)

Expired Permits

Collected at time of building plan review submittal &

assessed @ % of building inspection fee

($129.00min.)

Exception:

Standard production units after the model unit

has been reviewed @ % of building inspection

fee (changes to be reviewed on an hourly basis)

Projects requiring review in excess of the following:

Project Valuation

# of Reviews

$100,000 or less

2

$100,000 - $1,000,000

3

$1,000,001 ? more

4

Minimum Fee Retained by City

Each sheet of permitted drawings

Each permit issued

More than 10 minutes (estimate to complete) Hours x

Rate (Minimum Charge)

16mm or 35mm ? 1st copy

Each additional copy on same address or area

Each copy

Flat Fee Flat Fee 2 Hour Minimum ($129/hr) Equal to the amount of standard inspection fee for permit to which it applies OR the actual time spent investigating, whichever is greater, but not less than $250.00 minimum Flat fee Hourly ($65 minimum)

Flat Fee

Flat Fee, Plus Microfilm Fee Fee Schedule Line Items (Minimum Inspection Fee does not apply) Reactivate permit for projects that have been

expired for LESS than 6months.

Recording & Release of NonCompliance due to Permit Expiration & Similar Services

Reactivate permit for projects that have been expired for GREATER 6 months

Flat Fee

Rate

61%

26%

$ 129.00 per hour

$194.00 $4.04 $1.04 $129/hr

$3.00 $1.50 $0.10

$129.00 $129.00

$258

$250.00 Minimum.

$161.00 $129.00/hr

$32.00

$32.00 + $1.04 +

Line Items $43.00+

? New Inspect Fee

$43.00+New Inspect Fee

$129.00

A 6.0% Automation Fee will be added to all fees listed pursuant to Resolution 2016-59

G:\BuildingAdmin/Web/Fee Schedule 01/06/17.doc Effective 01/06/2017

- 2 -

BUILDING PERMIT FEES CERTIFICATE OF OCCUPANCY

(714) 536-5241

Fee Type

Certificate of Occupancy: To verify proper use and terms of occupancy in new and existing commercial and industrial buildings

How Determined

With Building Permit Modified Certificate w/out additional inspection or

Administrative services Certificate of Occupancy Review (No inspection) Certificate with additional inspection services

B & M Occupancies All Other Occupancies B & M Occupancies requiring services in excess of 75 minutes ? additional All Other Occupancies requiring services in excess of 250 minutes - additional Temporary Certificate (Actual fully burdened costs) B & M Occupancies All Other Occupancies

Rate No Fee $32.00

$43.00

$161.00 $516.00

$129.00/hr.

$129.00/hr

$100.00min $225.00min

BUILDING DIVISION "SPECIAL SERVICES"

Fee Type

How Determined

Rate

During Normal Work Hours:

Counter, Inspection, Plan Review, and Supervisory

Hourly

$129.00/hr

Services

Outside Normal Work Hours:

Counter, Inspection, Plan Review, and Supervisory

Hourly

$156.00/hr

Services

a. The payment of such fees shall be in addition to other required fees.

b. Where the special service is provided during normal work hours, the fee shall be based on the actual

time expended, but not less than one-half (1/2) hour.

c. Where the special service is provided as overtime between the hours of 6:00 AM and 8:00 PM on a

normal work day, the fee shall be based on the actual time expended but not less than one (1) hour at

the outside normal work hour rate.

d. Where the special service is provided outside the hours of 6:00 AM to 8:00 PM on a normal work day

or during any hours on a typical City day off, as provided in the City's current MOU, the fee shall be

based on the actual time expended but not less than four (4) hours at the outside normal work hour rate.

A 6.0% Automation Fee will be added to all fees listed pursuant to Resolution 2016-59

G:\BuildingAdmin/Web/Fee Schedule 01/06/17.doc Effective 01/06/2017

- 3 -

BUILDING PERMIT FEES COLLECTED FOR OTHER DEPARTMENTS & AGENCIES

AGENCY/Fee Type

How Determined

HB PLANNING DIVISION. (714) 536-5271

Planning Plan Review

Collected at time of building plan review submittal &

assessed @ % of building inspection fee

Exception:

Standard production units after the model unit has

been reviewed @ % of building inspection fee

(changes to be reviewed on an hourly basis

Rate 46% 20%

STATE OF CALIFORNIA State Tax (SMIP) Residential Calif. State Tax (SMIP) Commercial/Industrial

Up to $3,850 valuation ? Fee amount is fixed Over $3,850 valuation ? Fee amount is Valuation x Rate Up to $1,786 Valuation ? Fee amount is fixed Over $1,786 Valuation ? Fee amount is Valuation x Rate

$0.50 $0.00013

$0.50 $0.00028

HUNTINGTON BEACH LIBRARY

Library Enrichment-

Applied to all new development & additions which

Residential

increase existing sq. ft. by over 50% (including garage

area) ? Rate per sq. ft. Payment is due at time of permit

issuance

Library Enrichment-

Applied to all new development and additions ? Rate per

Commercial/Industrial

sq. ft. Payment is due at time of permit issuance.

Library Development -

Applied to all new development & additions which

Residential

increase existing sq. ft. by over 50% (including garage

area) ? Rate per sq. ft. Payment is due prior to final

inspection but may be paid at time of permit issuance.

Library Development -

Applied to all new development and additions ? Rate per

Commercial/Industrial

sq. ft. Payment is due at time of permit issuance.

Exceptions:

Warehouse on commercial/industrial Facilities

Government or public facilities

Churches, temples synagogues, and other buildings

or structures used for religious worship

Private schools which meet California Education

Code Section 48222 requirements

$0.15 $0.15 $0.44

$0.04

HB SCHOOL DISTRICT School District Residential

School District Commercial/Industrial

(714) 536-7521 Applied to new residential development and additions of 500 sq. ft. or more (excluding garage area) ? Rate per sq. ft. Applied to all new development and additions ? Rate per sq. ft. Payment is due at time of permit issuance.

$3.48 $0.54

A 6.0% Automation Fee will be added to all fees listed pursuant to Resolution 2016-59

G:\BuildingAdmin/Web/Fee Schedule 01/06/17.doc Effective 01/06/2017

- 4 -

Fee Type Permit Processing Charge Inspection Fee (Min)

Inspection Fee (Sq. Ft.)

OR Inspection Fee (Items)

ELECTRICAL PERMIT FEES

(714) 536-5241

How Determined

Flat Fee

Minimum fee charged (Sq. Ft Calculation or Item

Calculation) in addition to the Processing Charge

Per Square Foot in lieu of listed items. (New single and

multiple-family residential buildings including additions

and attached garages)

Minimum $30.45

Each service meter. Per AMP Charge.

(Minimum $30.45)

Each sub-panel

Each self-contained, factory-wired, approved unit such as

cooking appliances, home appliances, heating appliances,

HVAC units, vegetable cases, drinking fountains, etc.

(2-HP Max)

Over 2-HP, see generators, motors and transformers)

Lighting Fixtures (each):

1 ? 50

Each additional fixture

Each pole with fixtures

Generators, Motors and Transformers:

H.P., kW, or KVA Rating of equipment up to and

including two (2)

Over two (2) and not over ten (10)

Over ten (10) and not over fifty (50)

Over fifty (50)

Receptacle and Switch Outlets:

First fifty (50), each

Each additional outlet

Each section of track lighting or multiple outlet assembly

Fuse Up

Temporary Service:

Each temporary construction pole (including lights

and outlets for outdoor lot use)

Each sub-pole with panel

Signs at each address:

1st Sign at one address

Each additional sign at same address

Each misc. item regulated by the Huntington Beach

Electrical Code where no fee is listed

Photovoltaic Residential 15 kW or less

Photovoltaic Residential Charge per kW over 15kW

Rate $32.00 $39.00

$.18

$.94

$45.30

$24.15

$3.75 $1.85 $24.15

$24.15 $45.30 $95.15 $234.00

$3.75 $1.85 $12.05 $60.40

$95.15 $45.30

$234.00 $95.15 $45.30

$216.64 $15.00

A 6.0% Automation Fee will be added to all fees listed pursuant to Resolution 2016-59

G:\BuildingAdmin/Web/Fee Schedule 01/06/17.doc Effective 01/06/2017

- 5 -

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download

To fulfill the demand for quickly locating and searching documents.

It is intelligent file search solution for home and business.

Literature Lottery

Related searches