TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS …
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
1/23 FRIDAY, JULY 26, 2019
BIDS WILL BE RECEIVED ELECTRONICALLY THROUGH THE BID EXPRESS BIDDING SERVICE UNTIL 10:00 AM FRIDAY, JULY 26, 2019
THEREAFTER, BIDS WILL BE CHECKED IN THE DIVISION OF CONSTRUCTION PROCUREMENT AND POSTED ALONG WITH THE ENGINEER'S ESTIMATE ON THE FOLLOWING WEBSITES: WWW.TRANSPORTATION. AND WWW.. THE PROJECTS ARE FOR THE IMPROVEMENT OF :
CALL 100
CONTRACT ID 191226
CHRISTIAN COUNTY NHPP 0411 (030) : EDWARD T. BREATHITT PENNYRILE PARKWAY (EB 9004) (MP 12.053) ADDRESS CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY, BOTH DIRECTIONS (MP 16.239), A DISTANCE OF 4.19 MILES. ASPHALT REHAB INTERSTATE/PARKWAY. SYP NO. 02-20006.00. THE DBE PARTICIPATION GOAL IS 7.00%.
CALL 101
CONTRACT ID 191224
FLEMING COUNTY STP 0321 (027) : KY 32 (MP 17.450) ADDRESS PAVEMENT CONDITION OF AC PAVEMENT (MP 28.290), A DISTANCE OF 10.84 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 09-20009.00. THE DBE PARTICIPATION GOAL IS 7.50%.
CALL 102
CONTRACT ID 191227
MCCRACKEN COUNTY STP 3015 (028) : US 45 (MP 10.343) ADDRESS PAVEMENT CONDITION OF AC PAVEMENT (MP 10.802), A DISTANCE OF 0.46 MILES. ASPHALT PAVEMENT & ROADWAY REHAB. SYP NO. 01-20019.00. THE DBE PARTICIPATION GOAL IS 6.00%.
CALL 103
CONTRACT ID 191036
MONROE COUNTY STP 5102(011) : TOMPKINSVILLE BYPASS(NEW ROUTE) CONSTRUCT HEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACING ONLY", A DISTANCE OF 4.81 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 03-07020.17. THE DBE PARTICIPATION GOAL IS 7.00%.
CALL 104
CONTRACT ID 191039
FAYETTE COUNTY STPM 0754(064) : I-75 SB RAMP TO MAN O WAR BLVD WIDEN I-75 SOUTHBOUND EXIT RAMP AT MAN O WAR BLVD TO CONSTRUCT LEFT TURN LANES AND INSTALL TRAFFIC SIGNAL, A DISTANCE OF 0.16 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 07-00442.00. THE DBE PARTICIPATION GOAL IS 5.50%.
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
2/23 FRIDAY, JULY 26, 2019
CALL 105
CONTRACT ID 191041
MASON COUNTY STP BRO 5462(028) : US-68 REPLACE BRIDGE ON US-68 OVER LAWRENCE CREEK 0.13 MILE SOUTHWEST OF KY-3056, A DISTANCE OF 0.15 MILES. BRIDGE REPLACEMENT. SYP NO. 09-01095.00. THE DBE PARTICIPATION GOAL IS 0.00%.
* A MANDATORY PRE-BID MEETING WILL BE HELD ON JULY 12, 2019 10:00 A.M. PREVAILING TIME, AT KENTUCKY TRANSPORTATION CABINET, DISTRICT 9 OFFICE BUILDING, 822 ELIZAVILLE AVENUE, FLEMINGSBURG, KY 41041.
* ANY COMPANY THAT IS INTERESTED IN BIDDING ON THE SUBJECT PROJECT OR BEING PART OF A JOINT VENTURE MUST BE REPRESENTED AT THE PRE-BID MEETING.
* NO INDIVIDUAL CAN REPRESENT MORE THAN ONE COMPANY. AT THE MEETING, A ROSTER WILL BE TAKEN OF THE REPRESENTATIVES PRESENT. ONLY COMPANIES REPRESENTED AT THE MEETING WILL BE ELIGIBLE TO HAVE THEIR BIDS OPENED AT THE DATE OF LETTING.
CALL 106
CONTRACT ID 191037
JEFFERSON COUNTY STP BRZ 8760(004) : GRADE LANE(CR-1001) ADDRESS DEFICIENCIES OF BRIDGE OVER NORTHERN DITCH OF GRADE LANE(CR-1001G) 0.34 SOUTH OF KY-1747, A DISTANCE OF 0.04 MILES. BRIDGE REPLACEMENT. SYP NO. 05-01077.00. THE DBE PARTICIPATION GOAL IS 3.50%.
CALL 107
CONTRACT ID 195130
GRAYSON COUNTY STP BRZ 9030 (129) : HORNTOWN ROAD (MP 2.945) ADDRESS DEFICIENCIES OF HORNTOWN RD BRIDGE OVER ROCK CREEK (043C00011N), FROM MP 2.945 TO MP 2.953. (MP 2.953), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 04-10000.00. THE DBE PARTICIPATION GOAL IS 6.50%.
CALL 108
CONTRACT ID 195131
TAYLOR COUNTY STP BRZ 9030 (081) : SOUTH JACKSON STREET (CR 1241) (MP .070) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1141 OVER BUCKHORN CREEK (109C00028N), FROM MP .07 TO MP .09. (MP .090), A DISTANCE OF 0.02 MILES. BRIDGE REPLACEMENT. SYP NO. 04-10007.00. THE DBE PARTICIPATION GOAL IS 4.50%.
CALL 110
CONTRACT ID 195133
SPENCER COUNTY STP BRZ 9030 (109) : FEATHERBED HOLLOW ROAD (CR 1155) (MP .088) ADDRESS DEFICIENCIES OF FEATHERBED HOLLOW ROAD (CR 1155) BRIDGE OVER LITTLE PLUM CREEK (108C00019N), FROM MP .088 TO MP .112. (MP .112), A DISTANCE OF 0.02 MILES. BRIDGE REPLACEMENT. SYP NO. 05-10026.00. THE DBE PARTICIPATION GOAL IS 5.50%.
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
3/23 FRIDAY, JULY 26, 2019
CALL 111
CONTRACT ID 195134
CAMPBELL COUNTY STP BRZ 9030 (152) : KY 2238 (MP 1.682) ADDRESS DEFICIENCIES OF GIBSON RD BRIDGE OVER THREE MILE CREEK (019B00060N) (MP 1.69), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 06-10000.00. THE DBE PARTICIPATION GOAL IS 4.00%.
CALL 112
CONTRACT ID 192038
LETCHER COUNTY HSIP 5335 020 : COWAN MOUNTAIN ROAD (KY 931) (MP 0.679) FROM LARRY'S ROAD EXTENDING NORTH TO PACK DRIVE (MP 5.505), A DISTANCE OF 4.83 MILES. GUARDRAIL. SYP NO. 12-00965.00. THE DBE PARTICIPATION GOAL IS 0.00%.
CALL 113
CONTRACT ID 194121
KENTON COUNTY HSIP 9010 (330) : FOWLER CREEK RD (KY 1486) (MP 2.800) FROM 0.200 MILES NORTH OF KY 2047 EXTENDING NORTH TO 0.08 MILES SOUTH OF KY 1486C (MP 3.200), A DISTANCE OF 0.40 MILES. HIGH FRICTION SURFACE. SYP NO. 06-09020.00. THE DBE PARTICIPATION GOAL IS 0.00%.
CALL 114
CONTRACT ID 194218
HARDIN COUNTY HSIP 0311 (042) : N DIXIE HIGHWAY (US 31W) (MP 22.099) INTERSECTION AND CORRIDOR IMPROVEMENTS TO REDUCE CONFLICT POINTS AND ENHANCE SAFETY AND CAPACITY ALONG US 31W FROM FIRST STREET TO KY 1500 (MP 26.251), A DISTANCE OF 4.15 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 04-09008.40. THE DBE PARTICIPATION GOAL IS 4.50%.
CALL 115
CONTRACT ID 194219
GRAYSON COUNTY HSIP 9010 (299) : GRAYSON SPRINGS ROAD (KY 1214) (MP 6.300) FROM KY 2778 EXTENDING NORTH TO KY 3155 (MP 14.028), A DISTANCE OF 7.73 MILES. ASPHALT PAVEMENT & ROADWAY REHAB. SYP NO. 04-09007.00. THE DBE PARTICIPATION GOAL IS 7.00%.
CALL 116
CONTRACT ID 194118
VARIOUS COUNTY HSIP 9010 (394) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 4 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 4 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 04-00942.00. THE DBE PARTICIPATION GOAL IS 0.00%.
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
4/23 FRIDAY, JULY 26, 2019
CALL 117
CONTRACT ID 194123
VARIOUS COUNTY HSIP 9010 (395) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 5 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 5 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 05-00935.00. THE DBE PARTICIPATION GOAL IS 0.00%.
CALL 118
CONTRACT ID 194122
VARIOUS COUNTY HSIP 9010 (396) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 6 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 6 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 06-00939.00. THE DBE PARTICIPATION GOAL IS 0.00%.
CALL 119
CONTRACT ID 194119
VARIOUS COUNTY HSIP 9010 (397) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 7 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 7 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 07-00950.00. THE DBE PARTICIPATION GOAL IS 0.00%.
CALL 120
CONTRACT ID 194116
VARIOUS COUNTY HSIP 9010 (398) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 8 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 8 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 08-00944.00. THE DBE PARTICIPATION GOAL IS 0.00%.
CALL 121
CONTRACT ID 194120
VARIOUS COUNTY HSIP 9010 (401) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 11 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 11 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 11-00970.00. THE DBE PARTICIPATION GOAL IS 0.00%.
CALL 123
CONTRACT ID 191040
KENTON COUNTY CM 3002(239) : US-25 DIXIE HIGHWAY AT KY-1072 KYLES LANE RECONSTRUCT TO ALIGN THE INTERSECTIONS OF US-25 AND KYLE'S LANE IN THE CITY OF FORT WRIGHT, A DISTANCE OF 0.18 MILES. ASPHALT SURFACING NEW CONSTRUCTION. SYP NO. 06-00287.00. THE DBE PARTICIPATION GOAL IS 10.00%.
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
5/23 FRIDAY, JULY 26, 2019
CALL 204
CONTRACT ID 191225
ADAIR, TAYLOR COUNTIES 121GR19D025 - NHPP NEW COLUMBIA ROAD (KY 55) IN TAYLOR & ADAIR COUNTIES THE DBE PARTICIPATION GOAL IS 8.00%.
ADAIR COUNTY NHPP 0551 047 : NEW COLUMBIA ROAD (KY 5) IN ADAIR COUNTY (MP 20.868) HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY 55 FROM SOUTH OF THE TAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS (MP 21.305), A DISTANCE OF 0.44 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 04-08920.00.
TAYLOR COUNTY NHPP 0551 047 : NEW COLUMBIA ROAD (KY 55) IN TAYLOR COUNTY (MP 0.000) HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY 55 FROM SOUTH OF THE TAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS (MP 8.003), A DISTANCE OF 8.31 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 04-08920.00.
CALL 205
CONTRACT ID 191222
LAUREL, ROCKCASTLE COUNTIES 121GR19D016 - NHPP IM I-75 (LAUREL & ROCKCASTLE COUNTIES) THE DBE PARTICIPATION GOAL IS 9.00%.
LAUREL COUNTY NHPP IM 0752 (101) : I-75 (LAUREL COUNTY) (MP 50.200) ADDRESS PAVEMENT CONDITION OF I-75 (LAUREL COUNTY) IN BOTH DIRECTIONS (MP 50.705), A DISTANCE OF 0.51 MILES. ASPHALT REHAB INTERSTATE/ PARKWAY. SYP NO. 11-20013.00.
ROCKCASTLE COUNTY NHPP IM 0753 (102) : I-75 (ROCKCASTLE COUNTY) (MP 50.800) ADDRESS PAVEMENT CONDITION OF I-75 (ROCKCASTLE COUNTY) IN BOTH DIRECTIONS (MP 55.300), A DISTANCE OF 4.50 MILES. ASPHALT REHAB INTERSTATE/PARKWAY. SYP NO. 08-20003.00.
CALL 206
CONTRACT ID 191034
MENIFEE COUNTY 083GR19D034-FH FLAP KY-1274 THE DBE PARTICIPATION GOAL IS 6.00%.
MENIFEE COUNTY FH FLAP 006 : KY-1274 ROCKFALL SLOPE IMPROVEMENTS ALONG KY-1274 NORTH OF THE LONG BOW BOAT RAMP IN MENIFEE COUNTY, A DISTANCE OF 0.25 MILES. GRADE & DRAIN. SYP NO. 10-00372.00.
MENIFEE COUNTY FH FLAP 008 : KY 1274 ROCKFALL SLOPE IMPROVEMENTS ALONG KY-1274 SOUTH OF THE MENEFEE/ ROWAN COUNTY LINE, A DISTANCE OF 0.83 MILES. GRADE & DRAIN. SYP NO. 10-00373.00.
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
6/23 FRIDAY, JULY 26, 2019
CALL 207
CONTRACT ID 195123
BALLARD, CALLOWAY, GRAVES, MARSHALL COUNTIES 121GR19D123-STP BRZ VARIOUS ROUTES IN DISTRICT 1 THE DBE PARTICIPATION GOAL IS 6.00%.
BALLARD COUNTY STP BRZ 9030 (132) : PALMORE LANE (MP 1.712) ADDRESS DEFICIENCIES OF BRIDGE ON CR 1309 (PALMORE LANE) OVER BRANCH OF CLANTON CREEK (004C00047N), FROM MP 1.712 TO MP 1.747. (MP 1.747), A DISTANCE OF 0.04 MILES. BRIDGE REPLACEMENT. SYP NO. 01-10019.00.
BALLARD COUNTY STP BRZ 9030 (133) : JOHNSON ROAD (MP .380) ADDRESS DEFICIENCIES OF BRIDGE ON JOHNSON ROAD OVER SHAWNEE CREEK (004C00081N), FROM MP .38 TO MP .42. (MP .420), A DISTANCE OF 0.04 MILES. BRIDGE REPLACEMENT. SYP NO. 01-10014.00.
CALLOWAY COUNTY STP BRZ 9030 (130) : SPRING ROAD ADDRESS DEFICIENCIES OF BRIDGE ON SPRING ROAD OVER WEST FORK ROCKHOUSE CREEK (018C00111N). BRIDGE REPLACEMENT. SYP NO. 01-10016.00.
GRAVES COUNTY STP BRZ 9030 (134) : ALBEN BARKLEY ROAD (MP .765) ADDRESS DEFICIENCIES OF BRIDGE ON CR 1408 OVER BRANCH OF WILSON CREEK (042C00219N), FROM MP .765 TO MP .807. (MP .807), A DISTANCE OF 0.04 MILES. BRIDGE REPLACEMENT. SYP NO. 01-10015.00.
MARSHALL COUNTY STP BRZ 9030 (131) : KY 1949 (MP 7.319) ADDRESS DEFICIENCIES OF KY-1949 BRIDGE OVER SMITH CREEK (079B00110N), FROM MP 7.319 TO MP 7.329. (MP 7.329), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 01-10003.00.
CALL 208
CONTRACT ID 195126
CHRISTIAN, OHIO, UNION COUNTIES 121GR19D126 - STP BRZ VARIOUS BRIDGES IN DISTRICT 2 THE DBE PARTICIPATION GOAL IS 6.00%.
CHRISTIAN COUNTY STP BRZ 9030 (100) : KY 189 (MP 3.179) ADDRESS DEFICIENCIES OF KY-189 BRIDGE OVER BRANCH OF BUCK FORK. (024B00064N) (MP 3.187), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 02-10001.00.
OHIO COUNTY STP BRZ 9030 (101) : KY 85 (MP 9.614) KY 85, ADDRESS DEFICIENCIES OF KY 85 BRIDGE OVER BRANCH OF WEST FORK LEWIS CREEK. (092B00053N) (MP 9.627), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 02-10010.00.
UNION COUNTY STP BRZ 9030 (102) : KY 359 (MP 6.147) KY 359, ADDRESS DEFICIENCIES OF KY 359 BRIDGE OVER LITTLE MASON CREEK. (113B00008N) (MP 6.166), A DISTANCE OF 0.02 MILES. BRIDGE REPLACEMENT. SYP NO. 02-10017.00.
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
7/23 FRIDAY, JULY 26, 2019
CALL 209
CONTRACT ID 195127
HOPKINS, MCLEAN, OHIO COUNTIES 121GR19D127 - STP BRZ VARIOUS BRIDGES IN DISTRICT 2 THE DBE PARTICIPATION GOAL IS 0.00%.
HOPKINS COUNTY STP BRZ 9030 (151) : KY 109 (MP .092) ADDRESS DEFICIENCIES OF KY 109 BRIDGE OVER TRADEWATER RIVER (054B00079N), FROM MP .092 TO MP .154. (MP .154), A DISTANCE OF 0.06 MILES. BRIDGE REPAIRS. SYP NO. 02-10025.00.
MCLEAN COUNTY STP BRZ 9030 (150) : US 431 (MP .743) ADDRESS DEFICIENCIES OF US-431 BRIDGE OVER DRAIN TO CYPRESS CREEK (075B00019N), FROM MP .743 TO MP 3.327. (MP 3.327), A DISTANCE OF 0.84 MILES. BRIDGE REPAIRS. SYP NO. 02-10007.00.
OHIO COUNTY STP BRZ 9030 (061) : CR 1067 - SUNNYDALE ROAD (MP 2.377) ADDRESS DEFICIENCIES ON SUNNYDALE ROAD BRIDGE OVER BRANCH OF ROUGH RIVER (092C00020N) (MP 2.386), A DISTANCE OF 0.01 MILES. BRIDGE REPAIRS. SYP NO. 02-10012.00.
CALL 210
CONTRACT ID 195125
GREENUP, LEWIS COUNTIES 121GR19D125-STP BRZ VARIOUS BRIDGES IN DISTRICT 9 THE DBE PARTICIPATION GOAL IS 8.50%.
GREENUP COUNTY STP BRZ 9030 (127) : SMITH BRANCH RD (MP 2.221) ADDRESS DEFICIENCIES OF SMITH BRANCH RD BRIDGE OVER LEFT FK SMITH BRANCH. (045C00114N) (MP 2.227), A DISTANCE OF 0.01 MILES. BRIDGE REPAIRS. SYP NO. 09-10008.00.
LEWIS COUNTY STP BRZ 9030 (128) : KY 1021 (MP 3.648) ADDRESS DEFICIENCIES OF KY-1021 BRIDGE OVER BRIERY CREEK. (068B00075N) (MP 3.654), A DISTANCE OF 0.01 MILES. BRIDGE REPAIRS. SYP NO. 09-10023.00.
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT
FRANKFORT, KENTUCKY
POSTED: 7/5/19 NOTICE TO CONTRACTORS
8/23 FRIDAY, JULY 26, 2019
CALL 211
CONTRACT ID 194310
MADISON COUNTY 121GR19T013-HSIP INSTALLATION OF DEDICATED DSRC SYSTEM ON KY-876 & US-25 THE DBE PARTICIPATION GOAL IS 0.00%.
MADISON COUNTY AID 6000 (153) : INSTALLATION OF DEDICATED DSRC SYSTEM ON KY-876 (MP 6.400) INSTALLATION OF A DEDICATED SHORT RANGE COMMUNICATION SYSTEM ON KY-876 FROM MILEPOINT 6.400 EXTENDING EAST TO MILEPOINT 9.950 (MP 9.950), A DISTANCE OF 3.55 MILES. SIGNS-LIGHTING-SIGNALS. SYP NO. 07-00443.00.
MADISON COUNTY AID 6000 (153) : INSTALLATION OF DEDICATED DSRC SYSTEM ON US-25 (MP 15.400) INSTALLATION OF A DEDICATED SHORT RANGE COMMUNICATION SYSTEM ON US-25 FROM MILEPOINT 15.400 EXTENDING NORTHWEST TO MILEPOINT 20.500 (MP 20.500), A DISTANCE OF 5.10 MILES. SIGNS-LIGHTING-SIGNALS. SYP NO. 07-00443.00.
* A MANDATORY PRE-BID MEETING WILL BE HELD ON JULY 12, 2019 1:30 P.M. PREVAILING TIME, AT KENTUCKY TRANSPORTATION CABINET, DISTRICT 7 OFFICE BUILDING, 800 NEWTOWN COURT, LEXINGTON, KY 40512.
* ANY COMPANY THAT IS INTERESTED IN BIDDING ON THE SUBJECT PROJECT OR BEING PART OF A JOINT VENTURE MUST BE REPRESENTED AT THE PRE-BID MEETING.
* NO INDIVIDUAL CAN REPRESENT MORE THAN ONE COMPANY. AT THE MEETING, A ROSTER WILL BE TAKEN OF THE REPRESENTATIVES PRESENT. ONLY COMPANIES REPRESENTED AT THE MEETING WILL BE ELIGIBLE TO HAVE THEIR BIDS OPENED AT THE DATE OF LETTING.
CALL 212
CONTRACT ID 194117
VARIOUS COUNTY 121GR19T012-HSIP THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 2 & 3 THE DBE PARTICIPATION GOAL IS 0.00%.
VARIOUS COUNTY HSIP 9010 (392) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 2 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 2 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 02-00924.00.
VARIOUS COUNTY HSIP 9010 (393) : THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 3 THERMOPLASTIC STRIPING ON VARIOUS ROUTES IN DISTRICT 3 THERMOPLASTIC PAVEMENT STRIPING. SYP NO. 03-00931.00.
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- c e r t i f i c a t e kcma
- 06 04 024ex canyon creek cabinet lean case study executive
- painted cabinets canyon creek cabinet company
- who we are canyon creek cabinet company
- 06 04 024 canyon creek cabinet lean case study
- transportation cabinet department of highways
- canyon creek cabinet company monroe wa
- planning for your kitchen
- the monroe county family history index
- washington lean and environment project final report
Related searches
- department of transportation columbus ohio
- department of transportation columbus ga
- texas department of transportation drivers license renewal
- pa department of transportation forms
- florida department of transportation toll pay
- florida department of transportation pay tolls
- oregon department of transportation forms
- department of transportation medical certificate
- ohio department of transportation website
- ohio department of transportation projects
- ohio department of transportation odot
- wyoming department of transportation bids