Overall Equipment Effectiveness (OEEd) - Return on Investment

ShopfloorOnlineTM

Overall Equipment Effectiveness (OEEd) - Return on Investment

[To use this form, please use Adobe Reader (not viewer) - ]

Availability - Performance - Quality! Get visibility to these 3 factors real-time to see where the issues are in your discrete manufacturing plant. Set targets and KPIs over different timelines to ensure that customer orders are always met. Get more from your assets resources and equipment. Drive cultural change to adopt a proactive approach to continuous improvement. Increase your business profitability.

ShopfloorOnline is a platform solution for all your manufacturing operations

needs. Our OEE software solution can be used by your business in order to: ? Reduce Operational Risk by assuring compliance and adherence to costs and schedule and increasing Availability ? Reduce Working Capital by having predictable manufacturing and fewer losses ? Reduce Direct Costs by eliminating give away, saving time and eliminating nonproductive operations and increasing Performance ? Improve Operation Efficiency through visual performance indicators ? Increase Quality by measuring good output against total output and reduce defects OEEd = Availability x Performance x Quality

Please complete all the fields below...

Currency

Euro Production (weeks/year) 50 Production (days/week)

5

No. Shifts (shifts/day)

3 Hours per Shift (hrs/shift) 8 Personnel (per shift)

10

Production Lines

1 Machines/Work Stations per Line

1 (required for quotation purposes only)

Total Cost of Units Sold (per year)

Euro

Cost of Materials (per year)

Euro Total Revenue (per year)

Euro

Labour Cost Rate (per hour) 20 Euro Energy Cost Rate (per hour) 250 Euro

Quality:

=100 ? ?

Total Good Units (per year)

Total Defective Units (per year) 0.00000000

Performance:

= 100 ? ?

Total Theoretical/Ideal Units Produced (per year)

(ideal throughput)

Total Units Produced (per year)

(including defects)

Availability:

= 100 ? ?

Time Excluded (breaks etc.) (per year)

hrs Total In-Production Stops

hrs

(per year)

Setup/Changeover (per year)

hrs

Scroll down to the next page to calculate your potential business ROI

Page 1 of 2

ShopfloorOnlineTM

Overall Equipment Effectiveness (OEEd) - Return on Investment

Availability:

Total Time Available for Production 6000.00 hrs Planned Production Time 6000.00 hrs

Downtime

hrs

Run Time

6000.00 hrs

Quality:

Quality Metric %

Performance:

0

Performance Metric %

(shifts x hours x days x weeks) (available time - time excluded) (total downtime) (planned prod time - downtime)

Availability:

0 Availability Metric %

OEE %

Overall Equipment Effectiveness (OEE)

0

Cost of Defects

Potential Savings (max) 0 Euro (time & materials)

Cost of Under Performance

0 Euro (revenue less costs for ideal)

Cost of Downtime

0 Euro (shift labour and energy cost)

TOTAL

0 Euro

Total potential cost savings with ShopfloorOnline

0.00 Euro

Get a quote for your ShopfloorOnline OEE solution and calculate your return

on investment...

LZ Lifescience's proposal for Shopfloor Online OEE:

Euro

Your investment is paid back in

months

Visit us now at for more information or contact us at sales@ for a quotation.