Self build COST BREAKDOWN - Pacific Modern Homes Inc

ESTIMATED CONSTRUCTION COST BREAKDOWN- Self Build

Borrower:________________________________________________________________________________________________

Location:_________________________________________________________________________________________________

1.

Land - Acquisition Cost

$________

2.

Development Costs

Site Improvements

Total Development Costs

$________

$________

3.

Building Costs

(see total of right column)

4.

Soft Costs

Interest (during construction)

Legal Fees - Borrower¡¯s

Architect/Engineering

Estimated Closing Costs

Brokerage Fees

Total Soft Costs

0

$________

$______

$______

$______

$______

$______

TOTAL ESTIMATED COST

Less Deposit Paid to Builder

Less Deposit on Land

Less Cash Payments Made to Date:

___________________________

0

$________

0

$________

$________

$________

$________

Net Amount Required to Build

Loan Amount Requested

0.00

$_______

$________

Cash Balance Required to Complete

0

$________

Source of cash balance required: ____________________

_______________________________________________

_______________________________________________

______________________________________

Borrower Signature

Date

_______________________________________

Borrower Signature

Date

2001Lending/Forms&DisclosuresCabinet/costbreakdowns

Building Costs

PMHI PACKAGE COST:

$__________

Demolition

$__________

Foundation - basement/garage

$__________

Poured concrete

$__________

Trench/backfill/waterproofing

$__________

Structural steel

$__________

Lumber (included in PMHI)

$__________

Other Lumber (if applicable)

$__________

Rough framing - labor

$__________

Trusses (included in PMHI)

$__________

Trusses installation labor

$__________

Roofing including labor

$__________

Sheathing (including in PMHI)

$__________

Gutters

$__________

Windows (included in PMHI)

$__________

Exterior/painting/trim with labor

$__________

Doors- interior/exterior

$__________

Exterior doors (included in PMHI) $__________

Rough heating

$__________

Rough plumbing

$__________

Rough electric

$__________

Fireplace(s)

$__________

Insulation

$__________

Furnace/AC Unit

$__________

Drywall

$__________

Finish carpentry/trim

$__________

Acoustical

$__________

Wood flooring

$__________

Tile flooring

$__________

Linoleum/carpet flooring

$__________

Interior Painting

$__________

Cabinets - kitchen/bathrooms

$__________

Finish tile work

$__________

Marble Tile

$__________

Countertops

$__________

Appliances

$__________

Plumbing Fixtures

$__________

Showers/tubs

$__________

Electrical fixtures

$__________

Elevator

$__________

Propane/oil tank

$__________

Fire/security system

$__________

Exterior porches/patios/decks

$__________

Electric/water/sewer lines

$__________

Septic system

$__________

Well

$__________

Blacktop/sidewalks

$__________

Final grading/seeding/landscaping

$__________

Other:_________________________ $__________

Contingencies

$__________

Total Building Costs

0

$__________

................
................