Visitor NET Touch Preinstallation
VISITOR NET TOUCH CLIENT WORKSTATION SYSTEM REQUIREMENTS
Pre-Installation Check List
|Check Here |Hardware Item |
| |Computer CPU |
| |Required: Intel i3 - 2.00GHz |
| |Recommended: Intel i5 - 2.90 GHz |
| |Computer RAM |
| |Required: 4 GB |
| |Recommended: 8 GB |
| |Note: the machine must be free of all adware, spyware, malware, viruses and any other malicious software |
| |Computer Video |
| |Required: Video Adapter Capable of 1024x768 at 24 bit color resolution |
| |Computer Drives |
| |Required: 10 GB HD or better with a minimum of 1.5 GB free space |
| |Computer Ports |
| |1 Open USB Port if using a USB printer |
| |1 Open Parallel Port if using a Parallel printer |
| |1 Open USB Port if using a barcode reader |
| |1 Open Serial Port if using a barcode reader |
| |1 Open USB Port if using an ID scanner (driver’s license/passport/business card) |
| |1 Open USB Port if using a camera |
| |1 Open Serial Port if using the Canon camera pan & tilt PC controls |
| |1 Open USB Port if using a signature pad |
| |1 Open USB Port if using a fingerprint reader |
| |If Networked Installation |
| |The appropriate Network Interface Card installed |
| |Functioning Network Connection (with all network protocols installed and configured) |
| |Optional: If background check option was purchased Internet access is required |
|Check Here |Software Item |
| |Required: Windows 10 |
| |Required: Internet Explorer 11 |
| |Required: For an Oracle installation full Administrator Oracle client installed and configured (10g or 11g) |
|Check Here |Other Item |
| |A power strip capable of providing power for at least 4 power supplies |
| |Database installed and configured as detailed in the installation manual |
| |Visitor NET Touch website installed and configured as detailed in the installation manual (please have the URL) |
Please Sign and Date when completed and email to support@ or fax to 973.625.4104.
|Print Name |Print Company |
| | |
|Signature |Date |
| | |
Important Note: Additional costs will be incurred, at the prevailing All-Star labor rates, in the event the required minimum specifications listed above are not met and technicians require multiple onsite visits to complete an installation. If you are unsure or have any questions with regard to these specifications, please contact us prior to the scheduled installation at the number listed above.
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- avaya data ports list for products
- hp1022n network setup
- networking taxwise for tax ade
- if the signature scribbles all over the place the
- server installation checklist
- revised sim support practices for lm standalone and networks
- visitor net touch preinstallation
- integrated drug testing operations management information
Related searches
- hong kong visitor guide
- free printable visitor log sheets
- cda home visitor philosophy statement
- australian visitor visa form
- cdc flu visitor restriction recommendations
- website visitor statistics
- canada visitor visa documents checklist
- boston visitor guide
- boston common visitor information center
- australian visitor visa
- sedona arizona visitor guide
- sedona visitor center