Guide for Classification and Certification of Subsea ...

Guide for

Classification and Certification of Subsea Production Systems Equipment and Components

August 2017

GUIDE FOR

CLASSIFICATION AND CERTIFICATION OF SUBSEA PRODUCTION SYSTEMS EQUIPMENT AND COMPONENTS AUGUST 2017

American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862

? 2017 American Bureau of Shipping. All rights reserved. ABS Plaza 1701 City Plaza Drive Spring, TX 77389 USA

Foreword

The advantages of subsea systems have made subsea production a top choice for developments in many environments around the world. Innovations and improvements are being introduced that will increase the reliability and robustness of these systems, which will be used in even more developments over time.

Verification and validation plays an important role in safe and reliable operations of these subsea production systems. This Guide specifies the ABS requirements and process for Certification and Classification of subsea production systems and their associated subsystems, equipment and/or components. An optional class notation CSS ? Production is offered for a subsea production system that has been reviewed, surveyed, installed and commissioned in full compliance with the applicable sections of this Guide.

In addition, Independent third party (I3P) services that can be provided by ABS at different project phases are also described in this Guide. These are customized services based on the request of clients and could include the following:

Design verification (design review) and design validation (survey during manufacturing)

Installation/commissioning verification

In-service examination

Life extension assessment

Decommissioning verification

Certified Verification Agent (CVA) review to meet the government requirements can be provided during design, manufacturing and installation phases for subsea risers. For safety and pollution prevention equipment (SPPE) and subsea equipment in high-pressure high-temperature (HPHT) applications, I3P services for conformance with 30 CFR 250 Subpart H and applicable BSEE requirements can also be provided.

This Guide is to be used in conjunction with other applicable ABS Rules and Guides, codes and standards as referenced therein, and applicable national regulations.

This Guide becomes effective on the first day of the month of publication.

Users are advised to check periodically on the ABS website to verify that this version of this Guide is the most current.

We welcome your feedback. Comments or suggestions can be sent electronically by email to rsd@.

ABS GUIDE FOR CLASSIFICATION AND CERTIFICATION OF SUBSEA PRODUCTION SYSTEMS

ii

EQUIPMENT AND COMPONENTS ? 2017

GUIDE FOR

CLASSIFICATION AND CERTIFICATION OF SUBSEA PRODUCTION SYSTEMS EQUIPMENT AND COMPONENTS

CONTENTS

SECTION

1 Scope and Conditions of Classification and Certification...............8

1

Certification.....................................................................................9

3

Classification (Optional)..................................................................9

3.1 ABS Class Notation........................................................... 9

3.3 Systems Not Built Under Survey..................................... 10

5

I3P Services..................................................................................10

7

Application and Scope.................................................................. 11

7.1 Application....................................................................... 11

7.3 Scope...............................................................................12

7.5 Alternatives...................................................................... 13

7.7 New Technologies and Novel Concepts.......................... 13

7.9 Risk Evaluations for Alternative Arrangements and Novel Features................................................................ 14

7.11 Certification and Classification Process...........................14

9

Other Regulations.........................................................................14

9.1 International and Other Regulations................................ 14

9.3 Governmental Regulations.............................................. 15

11

References................................................................................... 15

13 Definitions..................................................................................... 15

15 Abbreviations................................................................................ 22

TABLE 1

I3P Services for the Different Phases of Design, Manufacturing, Installation/Commissioning, Operation and Decommissioning.......................................................... 11

FIGURE 1 Typical Elements in a Subsea Production System...............13

SECTION

2 Documents to be Submitted............................................................. 25

1

General......................................................................................... 25

3

Design and Manufacturing Specifications.....................................28

3.1 Design Specification........................................................ 28

ABS GUIDE FOR CLASSIFICATION AND CERTIFICATION OF SUBSEA PRODUCTION SYSTEMS

iii

EQUIPMENT AND COMPONENTS ? 2017

3.3 Manufacturing Specification.............................................28

5

General Arrangement for Subsea Production System..................28

7

System Level Documents to be Submitted for Review.................28

9

Subsystem/Equipment/Component Level Documents to be

Submitted for Review....................................................................29

9.1 Design Documents.......................................................... 29

9.3 Manufacturing Documents...............................................31

9.5 Installation/Commissioning Documents...........................32

9.7 In-service Documents...................................................... 32

9.9 Life Extension Documents............................................... 33

9.11 Decommissioning Phase (for I3P service).......................33

TABLE 1

Documents to be Submitted for Subsea Production Systems, Subsystems, Equipment and/or Component........26

SECTION

3 Requirements for Classification/Certification.................................34

1

General Design Considerations....................................................34

1.1 Recognized Standards.................................................... 34

1.3 Alternative Basis of Design..............................................34

1.5 Risk Assessments for Subsea Production Systems........ 35

1.7 Design Loading Conditions..............................................36

1.9 Design Load Types.......................................................... 36

3

General Design Requirements..................................................... 38

3.1 Design Principle and Philosophy..................................... 38

3.3 System Requirements..................................................... 38

3.5 Field Layout..................................................................... 38

3.7 Materials, Welding and Nondestructive Examination...... 38

3.9 Corrosion/Erosion Allowance...........................................39

3.11 Overpressurization Protection......................................... 39

3.13 Loads............................................................................... 39

3.15 Strength........................................................................... 39

3.17 Fatigue/Fracture.............................................................. 40

3.19 High-Pressure High-Temperature (HPHT) Applications.. 40

5

Subsystem/Equipment Requirements.......................................... 40

5.1 Subsea Connectors......................................................... 40

5.3 Wellhead, Tree and Tubing Hanger................................. 40

5.5 Flowline, Jumper and Riser............................................. 41

5.7 HIPPS.............................................................................. 42

5.9 Manifold/PLEM/PLET and Template................................42

5.11 Injection and Service Systems.........................................43

5.13 Umbilical/Flying Lead.......................................................43

5.15 Electrical System............................................................. 43

5.17 Control and Monitoring System....................................... 44

5.19 Capping Stack................................................................. 45

ABS GUIDE FOR CLASSIFICATION AND CERTIFICATION OF SUBSEA PRODUCTION SYSTEMS

iv

EQUIPMENT AND COMPONENTS ? 2017

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download