|Construction of 4 Bedroom Home |

|Quotation Checklist |

|Client: |

|Client Phone : |

|Project: |

|Site Address: |

|Date: |Job No: |

| |

|Cost Component |(/( |Action/Comment |

|Design drawings | | |

|Any client supplied items | | |

|Building approval including inspections | | |

|Plumbing approval | | |

|Energy efficiency requirements and provisions | | |

|QBCC Insurance premium | | |

|Portable long service levy | | |

|Workplace health and safety requirements, | | |

|Construction Safety Plan | | |

|Foundations data, site classification and engineer | | |

|drawings | | |

|Temporary power | | |

|Temporary toilet | | |

|Temporary water | | |

|Temporary site fencing | | |

|Sediment control | | |

|Site access - temporary crossover/driveway etc | | |

|Rubbish removal | | |

|Site signs | | |

|Site survey & set out | | |

|Site preparation costs – clearing, trees etc | | |

|Excavator | | |

|Retaining walls | | |

|Fill | | |

|Compaction test of fill | | |

|Rock removal | | |

|Telecommunication mains | | |

|Underground power | | |

|Under slab and external drains | | |

|Termite protection system | | |

|Concrete/steel/boxing/ties/bar chairs | | |

|Concreter – footings/slab/piers | | |

|Concrete pump | | |

|Engineer inspection of footings/slab | | |

|Scaffolding, edge protection | | |

|Cranes and hoisting | | |

|Timber wall and roof framing | | |

|Bracing/hardware/wall wrap, | | |

|Window and door frames, flyscreens. Tinting? | | |

|Carpenter – frame | | |

|Sanitary, water supply pipe work and fittings | | |

|Plumber water supply, drainage, stormwater, gas rough| | |

|in and fit off | | |

|Electrician rough in and fit off | | |

|Telecommunications contractor rough in and fit off | | |

|Vacuum maid contractor rough in and fit off | | |

|Air conditioning contractor rough in and fit off | | |

|Fascia & gutter supply | | |

|Fascia & gutter contractor | | |

|Roof sheet and flashings | | |

|Sarking & under roof insulation | | |

|Roofer | | |

|Supply & install roller or panel lift door | | |

|Bricks/brick ties | | |

|Lintels | | |

|Bricklayer | | |

|Plasterboard and cornice supply | | |

|Fibre cement wall and soffit linings supply | | |

|Carpenter fix plasterboard and fibre cement wall and | | |

|ceiling linings | | |

|Drywall plasterer – walls and ceilings | | |

|Entry door and sidelights | | |

|Internal timber doors | | |

|Door jambs, architraves, skirtings | | |

|Timber for pantry, robe and linen shelving and | | |

|manhole cover | | |

|Carpenter – 2nd fix | | |

|Waterproofing | | |

|Supply wall, floor & decorative tiles and tile | | |

|accessories, soap holders, adhesive, grout | | |

|Tiler | | |

|Joiner – Supply and install kitchen, laundry cabinet | | |

|& 2 x vanity cupboards | | |

|Sanitary fixtures – spa bath, bath, sink, shower | | |

|base, WCs, vanity, sink, laundry tub | | |

|Whitegoods – hot plates, oven, microwave, range hood | | |

|etc | | |

|Hot water system | | |

|Ceiling insulation | | |

|Stormwater pipe & accessories | | |

|Rainwater tank | | |

|Plumber to connect tank to stormwater | | |

|Concrete – driveways and paths | | |

|Sealer to concrete | | |

|Concreter – driveways and paths | | |

|Final site grade & clean | | |

|Paint supply | | |

|Painter | | |

|Electrical light fittings, fans, exhaust fans etc | | |

|Door hardware – locks, hinges, stops, door seals | | |

|Towel rails, toilet roll holders, hanging rails | | |

|Shower screens | | |

|Mirrors | | |

|Sliding robe doors | | |

|Carpenter final fit | | |

|Protection of finishes | | |

|Carpet/vinyl | | |

|Install flyscreens | | |

|Supply and install security screens | | |

|Supply and install blinds | | |

|Fencing and gates | | |

|Letterbox | | |

|Clothes line | | |

|TV aerial | | |

|Turf and topsoil | | |

|Site clean, remove toilet, signs, temporary fencing, | | |

|sediment controls | | |

|House clean | | |

|Supervisor including hand over | | |

|Builders maintenance after hand over | | |

|Project administration and overheads | | |

|Profit | | |

|GST | | |

|Contractor : |QBCC Licence: |

-----------------------