Concept Development Report Table of Contents Template



INTRODUCTION

A. Foreword

B. Original and Successor Projects

C. Data Reviewed

D. Design Standards

E. Characteristics of the Roadways and Surrounding Area

F. Concept Development Scope Statement

G. CD Public Involvement Action Plan

PURPOSE AND NEED

H. Bridge Needs

I. Scour Needs

J. Maintenance Needs

K. Roadway Needs

L. Goals and Objectives

EXISTING INVENTORY AND CONDITION

M. Existing Bridge Inventory and Condition

N. Scour

O. Maintenance Issues

P. Existing Roadway Inventory and Condition

Q. Existing Utilities

R. Summary of Existing Deficiencies

S. List of Substandard Design Elements

T. Management Systems Input

U. As-Built Plans, Right of Way Maps and Jurisdiction Map

TRAFFIC AND CRASH SUMMARY

V. Traffic Operations

W. Traffic Data

X. Traffic Volume Forecasts

Y. Crash Data Analysis and Crash Diagram

SOCIAL, ECONOMIC AND ENVIRONMENTAL SCREENING

Z. Community Outreach

AA. Noise and Air Quality

AB. Socioeconomics

AC. Cultural Resources

AD. Section 4(f) Properties

AE. Highlands/Pinelands

AF. Wetlands

AG. Reforestation

AH. Floodplain

AI. Sole Source Aquifer

AJ. Threatened/Endangered Species

AK. Category 1 Waters

AL. Vernal Pools

AM. Stormwater

AN. Hazardous Waste

AO. Anticipated Environmental Permits or Approvals

AP. Environmental Summary with Probable NEPA Document required

EVALUATION OF CONCEPTUAL ALTERNATIVES

AQ. Bridge Rehabilitation versus Bridge Replacement

AR. Temporary Bridge Location and Widening Constraints

AS. Conceptual Alternatives

AT. Traffic Analysis

AU. Hydrology & Hydraulics Analysis

AV. Right of Way Impacts and Review

AW. Utility Impacts

AX. ITS Facilities

AY. Complete Streets Policy

AZ. Access Impacts and Review

BA. Constructability and Staging Plans and Detour Plan

BB. Controlling Substandard Design Elements and Reasonable Assurance

BC. Construction Cost Estimate

BD. Value Engineering Study and Report

BE. Life Cycle Cost Analysis

BF. Alternatives Matrix

BG. Risk Analysis Summary

BH. Discussions with Subject Matter Experts

BI. Preliminary Preferred Alternative (PPA)

BJ. Preliminary Engineering Scope Statement

CONCEPT DEVELOPMENT RECOMMENDATION

BK. Federal Highway Administration (FHWA) Approval of Report

BL. Capital Program Screening Committee (CPSC) Recommendation

BM. Capital Program Committee (CPC) Approval

Appendices

2 Problem Statement/Charter

3 Bridge Re-evaluation Survey Report (latest cycle)

4 Bridge Scour Evaluation Report (latest cycle)

5 As-Built Plans, ROW Maps, and Jurisdiction Map

6 Tax Maps

7 Crash Data

8 Traffic Counts

9 Aerial Plan and Photographs

10 Straight Line Diagrams

11 Traffic Volumes (VPH) Graph

12 Collision Diagrams

13 Environmental Screening and Constraint Map

14 Conceptual Alignments, Right of Way Impacts, Environmental Constraints, Bridge Staging, Profile and Local Detour

15 Public Communications

16 Design Communications Report (DCR)

17 Resolutions of Support

18 NJDOT Communications

19 Cost Estimates

20 Alternatives Matrix

21 Risk Register

22 Quantitative Risk Analysis Report

23 Utility Risk Assessment Plan

24 Complete Streets Checklist

25 Life Cycle Cost Analyses

26 Systems Engineering Review Form

27 Preliminary Engineering Public Involvement Action Plan

28 Preliminary Engineering Scope Statement

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download