CONSTRUCTION SUMMARY REPORT

EMERGENCY SAND BERM CONSTRUCTION PHASE I AND II BREVARD COUNTY, FLORIDA

Presented by: AMEC Earth and Environmental, Inc. 3815 North US 1, Suite 103 Cocoa, Florida 32926 (321) 433-0223

May 2, 2005

C-3

______________________________________________________________________________

May 2, 2005

Mr. Mike McGarry Brevard County Natural Resources Management Office 2725 Judge Fran Jamieson Way - Bldg. A Viera, Florida 32940

RE: Construction Summary Report Emergency Sand Berm Construction Phase I & II Brevard County, Florida AMEC Project Numbers: 3-524-00000 (Phase I) and 5-436-9000 (Phase II)

Dear Mr. McGarry:

In December 2004, AMEC was contracted to perform construction monitoring and technical support for the referenced project. The project involved three contractors rebuilding Brevard County's dunes and beaches. The first phase of the project included only FEMA funded properties with structures in danger of further damage from erosion of the dune. The second phase of the project included rebuilding dunes and beaches for extended reaches of Brevard County's shoreline.

This report contains a construction summary that includes a brief site description, project costs, and general notes related to the project. Appendix I contains a detailed table presenting FEMA and non-FEMA sand quantities by location for each contractor. Appendix II contains copies of laboratory testing results performed for the project. Appendix III contains costs and quantities associated with extra work performed by each contractor for the project. Appendix IV contains selected project photographs. The attached compact disks contain project data files and digital photographs for each of the contractor's work areas.

We appreciate this opportunity to be of service and look forward to continuing our relationship with Brevard County. If you have questions regarding this Construction Summary Report, please contact us at your convenience.

Sincerely, AMEC Earth & Environmental, Inc.

John H. Wonderly Jr. Field Manager

Edward Newman Project Manager

Cc: Virginia Barker (Brevard County) Kevin Bodge (Olsen and Associates)

Attachments

C-4

______________________________________________________________________________

CONSTRUCTION SUMMARY Emergency Sand Berm Construction Phase I & II

Brevard County, Florida

Project Description:

The project site is located along the coastline of the Atlantic Ocean within Brevard County, Florida. The total project length is approximately 17.2 miles and stretches from the south end of Patrick Air Force Base to north of Sebastian Beach Inlet. The project involved removal of debris; transporting beach quality sand from inland sources; and placing beach quality sand in order to partially rebuild dunes and beaches eroded by multiple hurricanes that occurred in 2004.

Three contractors placed over one-half million cubic yards of sand from January 3, 2005 to April 22, 2005. The beach quality sand was transported by tandem axle haul trucks from inland sources to staging areas and then distributed to the proper locations on the beach with off-road dump trucks. Subsequently, the sand was placed into template with bulldozers and tilled due to environmental concerns for nesting turtles.

Contractors:

Phillips and Jordan, Inc. (P&J) 4589-B Oleander Drive Myrtle Beach, SC 29577

J. P. Donovan Construction, Inc. (Donovan) P. O. Box 5666 Titusville, FL 32783

RKT Constructors, Inc. (RKT) 5220 S. Washington Avenue Titusville, FL 32780

Construction Dates:

P&J ? From February 7, 2005 to March 16, 2005

Donovan ? From February 5, 2005 to April 14, 2005

RTK ? From January 3, 2005 to April 25, 2005