ELECTRONIC NAVIGATIONAL CHARTS (ENCs)

INTERNATIONAL HYDROGRAPHIC ORGANIZATION

ELECTRONIC NAVIGATIONAL CHARTS (ENCs)

"PRODUCTION, MAINTENANCE AND DISTRIBUTION GUIDANCE"

A guide to the requirements and processes necessary to produce, maintain and distribute ENCs

Publication S-65

Edition 2.1.0, May 2017

Published by the International Hydrographic Organization

4b, Quai Antoine 1er B.P 445 - MC 98011 MONACO Cedex

Principaut? de Monaco Telefax: (+377) 93 10 81 40

E-mail: info@iho.int Web:

? Copyright International Hydrographic Organization [2017] This work is copyright. Apart from any use permitted in accordance with the Berne Convention for the Protection of Literary and Artistic Works (1886), and except in the circumstances described below, no part may be translated, reproduced by any process, adapted, communicated or commercially exploited without prior written permission from the International Hydrographic Organization (IHO). Copyright in some of the material in this publication may be owned by another party and permission for the translation and/or reproduction of that material must be obtained from the owner. This document or partial material from this document may be translated, reproduced or distributed for general information, on no more than a cost recovery basis. Copies may not be sold or distributed for profit or gain without prior written agreement of the IHO Secretariat and any other copyright holders. In the event that this document or partial material from this document is reproduced, translated or distributed under the terms described above, the following statements are to be included:

"Material from IHO publication [reference to extract: Title, Edition] is reproduced with the permission of the IHO Secretariat (Permission No ......./...) acting for the International Hydrographic Organization (IHO), which does not accept responsibility for the correctness of the material as reproduced: in case of doubt, the IHO's authentic text shall prevail. The incorporation of material sourced from IHO shall not be construed as constituting an endorsement by IHO of this product." "This [document/publication] is a translation of IHO [document/publication] [name]. The IHO has not checked this translation and therefore takes no responsibility for its accuracy. In case of doubt the source version of [name] in [language] should be consulted."

The IHO Logo or other identifiers shall not be used in any derived product without prior written permission from the IHO Secretariat.

The IHO acknowledges the assistance of the United Kingdom Hydrographic Office in the preparation of this publication.

CONTENTS

Introduction ........................................................................................ 1 What is an ENC? ..................................................................................3 Hydrographic Office Responsibilities For Producing ENCs ...................4 ENC Production and Distribution Guidance...........................................7 STAGE 1 ? Design Production Process ...............................................7

STEP 1 ? Production Method ............................................................... 7 STEP 2 ? A Quality System ................................................................. 8 STAGE 2 ? Define ENC Production Requirement .................................9 STEP 1 ? Identify Requirements .......................................................... 9 STEP 2 ? Produce Production Plan........................................................ 9 STAGE 3 ? Acquire Production System .............................................13 STEP 1 ? Identify Requirement.......................................................... 13 STEP 2 ? Invitation to Tender ........................................................... 13 STEP 3 ? System Installation and Testing ........................................... 13 STEP 4 ? Live Running ..................................................................... 13 STAGE 4 ? Obtain and Train Staff.....................................................14 STEP 1 ? Staffing Levels ................................................................... 14 STEP 2 ? Determine Skill Levels ........................................................ 14 STEP 3 ? Identify Training Provider .................................................... 15 STAGE 5 ? Prepare Specifications for Data Capture ......................... 16 STEP 1 ? Published Specifications ...................................................... 16 STEP 2 ? Data Capture and Product Specifications ............................... 16 STAGE 6 ? Capture Data for New Cells .............................................18 STEP 1 ? Optionally, place external capture contract ............................ 18 STEP 2 ? Capture data ..................................................................... 18 STAGE 7 ? Edge Match Data ............................................................. 19 STEP 1 ?National data...................................................................... 19 STEP 2 ? Between Nations ................................................................ 19 STAGE 8 ? Verify and Validate Data .................................................21 STEP 1 ? Production Systems and Procedures ..................................... 21 STEP 2 ? Verification........................................................................ 21 STEP 3 ? Validation.......................................................................... 21

i

STAGE 9 ? Maintain ENCs .................................................................22 STEP 1 ? Establish mechanism for ENC updating ................................. 22 STEP 2 ? Notice to Mariners (Updates) ............................................... 22 STEP 3 ? New Editions or Notice to Mariners (NM) Blocks ..................... 22 STEP 4 ? ENC Re-issues ................................................................... 22 STEP 5 ? Distribution of ENC Data ..................................................... 23

STAGE 10 ? Distribute ENC Data ........................................................ 24 STEP 1 ? Identify Distribution Mechanism ........................................... 24 STEP 2 ? Sign Agreement ................................................................. 26 STEP 3 ? Distribution Format ............................................................ 26

Glossary of Terms .............................................................................29

ii

Introduction

Purpose and Scope

This document provides a high level guide to the production, maintenance and distribution of Electronic Navigational Charts (ENCs).

It offers a framework to inform hydrographic offices of the processes and requirements necessary to produce, maintain and distribute ENCs.

It provides references to documentation which can support each stage of the process. It is not intended to serve as a technical reference manual but to enable hydrographic offices to gain an overview of ENC production processes, and the requirements and procedures that need to be in place to set up an ENC production facility.

References

Standards and Conventions

A

IHO S-52, "Specifications for Chart Content and Display Aspects of ECDIS"

B

IHO S-57, "IHO Transfer Standard for Digital Hydrographic Data"

C

IHO S-58, "ENC Validation Checks"

D

IHO S-62, "List of Data Producer Codes"

E

IHO S-63, "IHO Data Protection Scheme"

F

IHO M-3, "Resolutions of the IHO", Resolution 1/1997 (as

amended), Principles of the Worldwide Electronic Navigational Chart

Database (WEND)

G

IHO S-4, "Regulations of the IHO for International (INT) Charts and

Chart Specifications of the IHO"

H

IHO S-11 Part A, Section 200, "Guidance on the Preparation and

Maintenance of ENC Schemes"

I

IHO S-8, FIG/IHO/ICA "Standards of Competence for Nautical

Cartographers"

J

IMO Resolutions MSC.232 (82) and A.817 (19), as amended by

MSC.64 (67) and MSC.86 (70), "Performance Standards for

Electronic Chart Display and Information Systems (ECDIS)"

K

International Convention for the Safety of Life at Sea (SOLAS) (as

amended)

L

IHO S-66, "Facts about Electronic Charts and Carriage

Requirements"

M

IHO C-47, "Training Courses in Hydrography and Nautical

Cartography

Indicative Documentation

N

UKHO ENC Product Specification

O

UKHO ENC Data Capture Specification

P

UKHO ENC Training Documentation and Job Descriptions

1

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download