Chapter 4--Activity-Based Costing

Theoretical activity level—the level of activity achieved under ideal operating conditions (absolute maximum production activity). 4. Practical activity level—the level of activity achieved under efficient operating conditions (it allows for some imperfections). ... The difference between actual overhead and applied overhead is the ... ................
................