Disposition Codes, Description and Fees - Alberta Parks

Disposition Codes, Description and Fees*

SCHEDULE 1 - ADMINISTRATIVE FEES

PART 1. Application, Renewal or Amendment of Disposition or Authorization

CATEGORY

Code

Disposition Type

Industrial

Application (see note #2)

FEES (see note #1)

Renewal/Amendment (see note #2)

PLC

Licence of Occupation

PEZ

Easement

PPA Pipeline Agreement

PMS Mineral Surface Agreement

$900.00

$400.00

PML Miscellaneous Lease

Sand & Gravel

PSM Surface Materials Lease

Exploration

Exploration

Utility

PLC

Licence of Occupation

PEZ

Easement

PPA Pipeline Agreement

$1,800.00 $1,100.00 $525.00 $900.00

$400.00 $400.00

$400.00

PML Miscellaneous Lease

Commercial

PLC

Licence of Occupation

PEZ

Easement

PPA Pipeline Agreement

$1,800.00 $900.00

$400.00

PML Miscellaneous Lease

Non-Commercial

PLC

Licence of Occupation

PEZ

Easement

PPA Pipeline Agreement

PML Miscellaneous Lease

Agricultural

PHP Haying Permit PGP Grazing Permit

Miscellaneous Permit

PMP Miscellaneous Permit

$1,800.00 $900.00 $25.00 $50.00

$400.00 N/A N/A

*All fees are based on the Provincial Parks Fee Order 2016 - 1

09-15-2016 - Page 1 of 9

Trapping

PLC

Licence of Occupation

$25.00

$25.00

Authorizations

PTA Temporary Field

Authorization

$50.00

N/A

LOA Letter of Authorization

Disposition Digital Mapping

Code Disposition Type

Application-Renewals-Replacement

Amendment

All

All

$125.00

$50.00

Disposition Inspection

Code

Disposition Type

First 3 Hours

Each Additional Hour

All

All

$250.00

$80.00

Reclamation Certificate Inspection

Code

Disposition Type

Inspection Fee

All

All

$300.00

Land Use Information Search and Routine Disclosure

Code

Disposition Type

First 2 Hours

Each Additional Hour

All

All

$100.00

$50.00

Damage Assessments and Deposits

Code

Disposition Type

Assessment/Deposit

Fee

Variable (based on Alberta Agriculture and Forestry's

All

All

Timber Damage Assessment (Note 4)

annual Agriculture and Forestry Timber Damage

Assessment Billing Rate Table)

All

All

Construction Reclamation Deposit (Note 5)

All

All

Reclamation Deposit (Note 6)

Not less than $5,000.00 Not less than $10,000.00

PART 2. Assignment of Disposition or Addition of Lessees

CATEGORY

ASSIGNMENT/ADDITION OF LESSEES FEE

Code

Disposition Type

Single Disposition Assignment

Multiple Disposition Assignment

PLC PEZ PPA PMS PML PSM

Industrial Sand & Gravel Utility Commercial Non-Commercial Cottages

$3,150.00

For The First Disposition: For Each Additional Disposition:

$3,150.00 $400.00

09-15-2016 - Page 2 of 9

ANNUAL OR ADDITIONAL DISPOSITION FEES

CATEGORY

Code Disposition Type

Use

Industrial

PLC Licence of Occupation Structure

Definition/Example Term

Annual & Other Fees

Grants permission for the use of an area for an industrial-related structure.

e.g. road, water intake, drainage or irrigation ditch, waste disposal site

Variable

Annual Base Fee:

not less than $25.00

Additional Fees: Roads (per km):

- under 15m wide:

$10.00

- 15-18m wide:

$15.00

- more than 18m wide:

$20.00

Water Intake (per site):

$50.00

Drainage/Irrigation Ditch (per acre):

$50.00

Waste disposal site (per acre): $1,500.00

PEZ Easement

Right-of-Way

Grants permission to construct and/or operate an electricity or communication distribution line (above or below ground) within a park for industrial use.

Up to 25 Years

Other fees & deposits may apply: See Notes #3 , 4, 5, 6

Annual Fee (per acre):

$25.00

PPA Pipeline Agreement Pipeline

PMS

Mineral Surface Lease

Mineral Surface Disposition

e.g. power line, telephone line, fiber optic, internet cable Grants permission to construct and/or operate a pipeline (for any fluid or gaseous substance) from a wellsite inside a park to a collection system outside the park, or for an existing transmission pipeline.

e.g. oil, gas or water pipeline

Grants permission to drill and/or operate a petroleum or natural gas well and facilities for the removal of petroleum or natural gas for an existing commitment.

e.g. oil and gas wellsites, battery site, water well

Up to 25 Years

Up to 25 Years

Other fees & deposits may apply: See Notes #3, 4, 5, 6

Installation Fee (per acre):

1st Pipeline: 2nd Pipeline:

$1,500.00

(within same right-of-way) Related Additional Pipeline

$500.00

(installed at a later date in the same or

expanded right-of-way resulting in a

new disturbance or re-disturbance):

$1,500.00

Other fees & deposits may apply: See Notes #3, 4, 5, 6

One-time New Disposition Fee: $1,500.00

Annual Fee (per acre):

$1,500.00

Other fees & deposits may apply: See Notes #3, 4, 5, 6

09-15-2016 - Page 3 of 9

PML Miscellaneous Lease Structure/Facility

Utility

PLC Licence of Occupation Structure

PEZ Easement

Right-of-Way

PPA Pipeline Agreement Pipeline PML Miscellaneous Lease Structure/Facility

Grants permission to construct and/or operate infrastructure or facilities for industrial use.

e.g. stockpile, storage

Variable

Annual Fee: 10% of the market value of the land on which improvements are located and 6% of the market value of the remaining land where the basis is for commercial (industrial) purposes.

Other fees & deposits may apply: See Notes #3, 4, 5, 6

Grants permission for the use of an area for public works.

e.g. road, trail, erosion control structure, storm water pond, drainage ditch, gabion, water intake, storm water outflow

Annual Base Fee: not less than $25.00

Variable

Additional Fees (not less than $50.00/acre):

Road/Trail (per km)

- under 15m wide:

$10.00

- 15-18m wide:

$15.00

- more than 18m wide:

$20.00

Erosion Control Structure/Storm Water

Pond/Drainage Ditch/Gabion (per acre):

$50.00 Water intake/Storm Water outflow:

$50.00

Grants permission to construct and/or operate an electricity or communication utility line (above or below ground) across or within a park for public use.

Other fees & deposits may apply: See Notes #3, 4, 5, 6

Annual Fee (per acre):

$50.00

Up to 25 Years

e.g. power line, telephone line, fiber optic, internet cable Grants permission to construct and/or operate a pipeline across or within a park for public use.

e.g. water, sewer or gas pipeline

Up to 25 Years

Other fees & deposits may apply: See Notes #3, 4, 5, 6, 10

Installation Fee (per acre):

1st Pipeline: 2nd Pipeline:

$1,500.00

(within same right-of-way) $500.00

Related Additional Pipeline

(installed at a later date in the same or

expanded right-of-way resulting in a

new disturbance or re-disturbance):

$1,500.00

Grants permission to construct and/or operate infrastructure or facilities for public use.

e.g. emergency telecommunication tower

Up to 25 Years

Other fees & deposits may apply: See Notes #3, 4, 5, 6, 10

Annual Fee: 10% of the market value of the land on which improvements are located and 6% of the market value of the remaining land where the basis is for commercial (utility) purposes (not less than $50.00/acre).

Other fees & deposits may apply: See Notes #3, 4, 5, 6

09-15-2016 - Page 4 of 9

Commercial

PLC Licence of Occupation Structure

PEZ Easement

Right-of-Way

PPA Pipeline Agreement Pipeline

PML Miscellaneous Lease Structure/Facility

Grants permission for the use of an area for a commercial/recreational structure.

e.g. road, trail, airstrip, pier, dock, boat launch, erosion control structure, storm water pond, drainage ditch, gabion, water intake, storm water outflow, commercial water line, water well, waste disposal site

Variable

Annual Base Fee:

$25.00

Additional Fees: Road/Trail/Airstrip (per km):

- under 15m wide:

$10.00

- 15-18m wide:

$15.00

- more than 18m wide:

$20.00

Pier/Dock/Boat Launch (each): $100.00

Erosion Control Structure/Storm Water

Pond/Drainage Ditch/Gabion (per acre):

$50.00 Water Intake/Storm Water Outflow

(per site):

$50.00

Water Line (per acre):

-1st Pipeline:

$150.00

-2nd Pipeline:

$50.00

Water Well (per acre)

$1,500.00

Waste Disposal Site (per acre) $1,500.00

Grants permission to construct and/or operate an electricity or communication utility distribution line (above or below ground) within a park to a commercial or recreational facility (i.e., cottage or lodge).

Other fees & deposits may apply: See Notes #3, 4, 5, 6

Annual Fee (per acre):

$25.00

Up to 25 Years

e.g. power line, telephone line, fiber optic, internet cable Grants permission to construct and/or operate a pipeline across or within a park for commercial services.

e.g. water, sewer or gas pipeline

Up to 25 Years

Other fees & deposits may apply: See Notes #3, 4, 5, 6, 10

Installation Fee (per acre):

1st Pipeline: 2nd Pipeline:

$1,500.00

(within same right-of-way) $500.00

Related Additional Pipeline

(installed at a later date in the same or

expanded right-of-way resulting in a

new disturbance or re-disturbance):

$1,500.00

Grants permission to construct and/or operate infrastructure or faciliies for commercial use.

e.g. storage

Up to 25 Years

Other fees & deposits may apply: See Notes #3, 4, 5, 6, 10

Annual Fee: 10% of the market value of the land on which improvements are located and 6% of the market value of the remaining land where the basis is for commercial purposes.

Other fees & deposits may apply: See Notes #3, 4, 5, 6