Plan van aanpak “Doing the right things II”

The inspection cycle was mainly developed within the IMPEL project “Doing the right Things”. During the IED Inspections project it was adapted to the demands of the IED. In the last chapter of this guidance the inspection obligations derived from the IED are discussed and linked to the different steps of the previous chapters. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download