SECTION 096500 - Mats Inc



MASTER SPECIFICATIONDIVISION 12 - FURNISHINGSSECTION 12 48 16 ENTRANCE FLOOR GRILLESDri Track by Mats Inc. This document is provided to assist in the preparation of a Project or Master Specification and has been formatted in accordance with the Construction Specifications Institute (CSI)’s MasterFormat?.GENERALGENERAL PROVISIONSAttention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made a part of this Section of the Specifications.Section includes: [Entrance matting systems, recessed aluminum foot grilles]DESCRIPTION OF WORKWork Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following:Heavy duty rigid Floor Grilles for entrance with commercial traffic.Substrate preparation.Recessed FramesRelated Work: The following items are not included in this Section and are specified under the designated Sections:Section 03 06 30Schedules for Cast-In-Place Concrete.Section 03 06 30.19 Concrete Slab ScheduleSection 12 48 13Entrance Floor Mats and Frames.References (Industry Standards):ASTM International (ASTM):ASTM B117 Standard Practice for Operating Salt Spray (Fog) ApparatusASTM E1745Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete SlabsASTM F710Standard Practice for Preparing Concrete Floors to Receive Resilient FlooringASTM F2170Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ ProbesSUBMITTALSProduct Data: Submit manufacturer's product data, installation instructions and maintenance instructions for each material and accessory proposed for use.Samples: Submit three representative samples of each product specified for verification.QUALITY ASSURANCEManufacturer Qualifications: Manufacturer must be capable of providing technical field service representation.Installer Qualifications: Must be installed by professional flooring installer’s experienced at installing commercial resilient floor covering products and have sufficient professional liability insurance coverage (aka Errors and Omissions Insurance) for the project.DELIVERY, STORAGE, AND HANDLINGDeliver materials in labeled packages. Store and handle in strict compliance with manufacturer's recommendations. Protect from damage due to weather, excessive temperatures, and construction operations.Deliver materials sufficiently in advance of installation to condition materials to the required temperature for 48-hours prior to installation.PROJECT CONDITIONSMaintain ambient and concrete temperature and humidity levels as described within the installation instructions. WARRANTYProvide manufacturer’s standard limited warranty.PRODUCTSACCEPTABLE MANUFACTURERProvide Dri Track by Mats Inc., 179 Campanelli Parkway Stoughton MA 02072; Telephone 800-MATS-INC (800628-7462); Fax 781-344-1537; .ENTRANCE FLOOR GRILLES1Product name:Dri Track by Mats Inc.2Construction:Scraping and drying surface with bolted-thru design with individual aluminum spacers. Wedge, welded and key lock fastening of rails is not allowed. 3Limited wear warranty:10 years4Material:Aluminum Alloy type 6061-T6. Soft Aluminum alloy (such as 6063-T52) is not allowed5Inserts:Drying inserts to be nylon material with 5% post-consumer recycled content. 6Blades:T-Shaped blades, 1-5/16 x 1/8 x 1-1/2 inch size. Spacing between blades not to exceed 3/16 inch.7Color:Standard colors as offered8Material size:Each panel maximum size is 48" (length) x 42" (width), Grille depth to be 1-1/2”, with frame 1-5/8”10Rolling load limit350 lbs per wheel11LEED v3IEQ Credit 5: Dri Track is designed for permanent installationMR Credit 4: 51.84% pre-consumer and 14.86% post-consumerMR Credit 5: Material must be manufactured within 500 miles of project location.12LEED v4MR Sources of Raw Materials Credit: 51.84% pre-consumer and 14.86% post-consumer.MR Regional Material Credit: Material must be manufactured within 100 miles of project location.IEQ Enhanced Indoor Air Quality Strategies Credit: Dri Track is a LEED acceptable permanent entryway system.EXECUTIONGENERAL CONTRACTOR RESPONSIBILITIESSupply a safe, climate controlled building and subfloor that meets the requirements of ASTM F710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring is required, or as detailed in the Mats Inc. Advanced Track installation instructions. This includes a structurally sound concrete subfloor, new concrete slabs must conform to ASTM C33/C33M — Standard Specification for Concrete Aggregate. Chemical adhesive removers must not be used.A secure storage and installation area that is maintained permanently or temporarily at the required ambient service temperature and humidity, so the flooring contractor can acclimate the flooring materials, is required for at least 24-hours prior to and during the application of the flooring.Areas with direct prolonged exposure to sunlight must be protected with the use of Low E glass doors and windows, facades or a protective film over the glass.If required, protect the flooring from damage during construction operations using plywood or a similar product, ensuring first that the flooring surface is free of all debris. Lay panels so that the edges form a butt joint and tape the joint to prevent both movement and debris entrapment underneath them. Inspect immediately before covering and after removal for final acceptance.FLOORING CONTRACTOR RESPONSIBILITIESProvide professional flooring installers experienced at installing commercial resilient floor coverings with sufficient professional liability insurance coverage (aka Errors and Omissions Insurance) for the project.Provide an effective installation manager to manage the project and installers and ensure that all of the required procedures are followed as detailed in the installation instructions. END OF SECTION ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download