Solicitation for Federal Project 1 step Project Management



[pic]

NEW JERSEY

DEPARTMENT OF TRANSPORTATION

SOLICITATION # 947

FOR TECHNICAL PROPOSALS

ONE STEP PROCUREMENT PROCESS

DESIGN PROJECT

MULTI-PROJECT SOLICITATION FOR INTERSECTION IMPROVEMENTS

ROUTE 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS,

ROUTE 18 EDGEBORO ROAD & TICES ROAD INTERSECTION IMPROVEMENTS

ROUTE 27 AND GRAND STREET NB INTERSECTION IMPROVEMENTS &

ROUTE 40 WOODSTOWN INTERSECTION IMPROVEMENTS

FOUR (4) THREE (3) SELECTIONS WILL BE MADE FROM TECHNICAL PROPOSALS RECEIVED.

ONLY ONE (1) TECHNICAL PROPOSAL SUBMISSION IS ALLOWED PER FIRM (NO TEAMS).

|DATE OF SOLICITATION: |7/30/13 |CLOSING DATE: |8/27/13 |

| | | | |

|LAST DATE TO REVIEW PROJECT MATERIALS: | |LAST DATE TO SUBMIT QUESTIONS: | |

| |N/A | |8/20/13 |

PROJECT DESCRIPTION

FEDERAL PROJECT

ROUTE 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS PROJECT WILL BE USED AS REPRESENTATIVE PROJECT FOR THIS SOLICITATION. CONCEPT DEVELOPMENT REPORT FOR ROUTE 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS IS PROVIDED FOR USE IN PREPARING TECHNICAL PROPOSALS.

ROUTE 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS:

ROUTE 202 IN THE VICINITY OF C.R. 567, FIRST AVENUE, IS A DIVIDED FOUR-LANE URBAN PRINCIPAL ARTERIAL LOCATED IN THE BOROUGH OF RARITAN, MIDDLESEX COUNTY. FIRST AVENUE, AT ITS INTERSECTION WITH ROUTE 202 IS AN UNDIVIDED URBAN MINOR ARTERIAL AND IS UNDER THE JURISDICTION OF SOMERSET COUNTY. ROUTE 202 AND FIRST AVENUE FORM A FOURLEGGED SIGNALIZED INTERSECTION. THE EASTBOUND APPROACH OF FIRST AVENUE CONSISTS OF AN EXCLUSIVE LEFT TURN LANE, A THROUGH/RIGHT LANE AND TWO RECEIVING LANES. THE WESTBOUND APPROACH OF FIRST AVENUE CONSISTS OF AN EXCLUSIVE LEFT TURN LANE, A THROUGH LANE, A THROUGH/RIGHT TURN LANE AND ONE RECEIVING LANE. BOTH THE ROUTE 202 NORTHBOUND AND SOUTHBOUND APPROACHES CONSIST OF TWO THROUGH LANES AND TWO RECEIVING LANES WITH ALL TURNING MOVEMENTS PROVIDED VIA FORWARD JUGHANDLES. BOTH FORWARD JUGHANDLES CONSIST OF AN EXCLUSIVE LEFT TURN LANE AND RIGHT TURN LANE AT THEIR INTERSECTION WITH FIRST AVENUE AND INTERSECT FIRST AVENUE APPROXIMATELY 115 FEET FROM ROUTE 202.

NJDOT PROPOSES TO CONSTRUCT AN AUXILIARY LANE ALONG BOTH DIRECTIONS OF ROUTE 202 IN THE VICINITY OF FIRST AVENUE ALONG WITH MINOR MODIFICATIONS TO BOTH APPROACHES OF FIRST AVENUE. MAJORITY OF THE WIDENING WOULD OCCUR IN THE EXISTING GRASS MEDIAN WHICH WOULD BE REPLACED WITH CONCRETE BARRIER AND ATTENUATORS. A DECELERATION LANE WOULD BE ADDED ALONG ROUTE 202 SOUTHBOUND TO THE FORWARD JUGHANDLE AT FIRST AVENUE. THIS WOULD REQUIRE A CUL-DE-SAC ALONG LELAND STREET AT ITS INTERSECTION WITH ROUTE 202. THE EASTBOUND APPROACH OF FIRST AVENUE WOULD CONSIST OF AN EXCLUSIVE LEFT TURN LANE, A THROUGH RIGHT LANE, AND ONE RECEIVING LANE. THE WESTBOUND APPROACH WOULD CONSIST OF AN EXCLUSIVE LEFT TURN LANE, A THROUGH LANE, AN EXCLUSIVE RIGHT TURN LANE AND ONE RECEIVING LANE. THE SIDE STREET SIGNAL PHASING WILL BE CHANGED FROM SPLIT PHASING TO PROTECTED/PERMITTED.

ROUTE 18 EDGEBORO ROAD & TICES ROAD INTERSECTION IMPROVEMENTS:

ROUTE 18 WITHIN THE PROJECT LIMITS IS A DIVIDED SIX-LANE URBAN PRINCIPAL ARTERIAL RUNNING SOUTH TO NORTH WITH A POSTED SPEED LIMIT OF 45 MPH. THE NORTHBOUND AND SOUTHBOUND TRAFFIC ALONG ROUTE 18 IS SEPARATED BY A CONCRETE BARRIER CURB. THE PROJECT IS LOCATED IN EAST BRUNSWICK TOWNSHIP, MIDDLESEX COUNTY.

Route 18 and Tices Lane form a four-legged intersection. The northbound approach of Route 18 consists of three through lanes and one auxiliary lane for the loop ramp in the northeast quadrant of the intersection. The southbound approach of Route 18 consists of three through lanes with a fourth lane opening up immediately after the intersection to serve as a deceleration lane for the shopping center. Left turns are prohibited along the eastbound approach of Tices Lane.

Route 18 and Edgeboro Road along with a reverse jughandle from Route 18 southbound form a four-legged signalized intersection. Edgewood Road, Old Bridge Turnpike and a one-way ramp onto Route 18 northbound form a four-legged signalized intersection approximately 75 feet east of Route 18. All turns are prohibited along Route 18 with the turning movements provided via jughandles.

The NJDOT is proposing to prohibit left turns from Old Bridge Turnpike northbound and Edgeboro Road westbound onto Route 18 southbound. Left turns would only be permitted from Edgeboro Road westbound onto Old Bridge Turnpike southbound.

Traffic travelling to Route 18 southbound would be redirected to the Route 18 and Tices Lane intersection. To accommodate the relocated traffic volume at the Route 18 and Tices Lane and Tices Lane and Old Bridge Turnpike intersections, the NJDOT is proposing the following:

Modify the westbound approach of Tices Lane to Dual left turn lanes, a through lane, a through/right lane and two receiving lanes.

Modify the signal phasing to three phases consisting of Route 18 right of way, Tices Lane westbound protected left, and Tices Lane right of way.

Modify the southbound approach of Old Bridge Turnpike at Tices Lane to consist of a through lane and an exclusive right turn lane and modify the signal timing.

Remove the U-Turn sign along Route 18 northbound between Tices Lane and Edgeboro Road and redirect this movement to the existing U-Turn at S. Woodland Avenue.

Route 27 and Grand Street NB Intersection Improvements:

ROUTE 27 AT GRAND ST IS A FOUR LEGGED SIGNALIZED INTERSECTION IN ELIZABETH CITY, UNION COUNTY MP. 33.96. ROUTE 27 IS ONE-WAY IN THE NORTHBOUND DIRECTION WITH TWO LANES SHARED THROUGH-RIGHT AND THROUGH-LEFT LANES. EASTBOUND GRAND ST. IS ONE LANE WITH A SHARED THROUGH-LEFT LANE. WESTBOUND GRAND ST. IS A SINGLE LANE APPROACH PROVIDING FOR THROUGH AND RIGHT TURNS. THE INTERSECTION HAS A HISTORY OF ACCIDENTS, NON ADA COMPLIANT EQUIPMENT OR GEOMETRY, POOR PAVEMENTS, ANTIQUATED TRAFFIC SIGNAL AND NO PEDESTRIAN PUSH BUTTONS OR CROSSING SIGNALS.

 

THE NJDOT IS PROPOSING TO IMPROVE TRAFFIC SIGNAL BY REPLACING THE EXISTING, MAKE ALL CURB RAMPS ADA COMPATIBLE, IMPROVE CROSSWALK PAVEMENT MARKINGS, MILL AND PAVE WITHIN LIMITS OF INTERSECTION, TREE TRIMMING AND UPGRADE EXISTING SIGNING AND ADD ADDITIONAL SIGNS IF NEEDED. AT THIS TIME WE ARE NOT ANTICIPATING ANY UTILITY OR ROW.

ROUTE 40 WOODSTOWN INTERSECTION IMPROVEMENTS:

THE US ROUTE 40 WOODSTOWN INTERSECTION IMPROVEMENT PROJECT IS BEING UNDERTAKEN TO IMPROVE TRAFFIC SAFETY AND EFFICIENCY AT THE US ROUTE 40 AND MAIN STREET INTERSECTION (M.P. 10.67), AS WELL AS TO IMPROVE THE QUALITY OF PEOPLE’S LIVES IN THE BOROUGH OF WOODSTOWN, SALEM COUNTY. TASKS TO BE COMPLETED INCLUDE REVISING INTERSECTION GEOMETRY AND DESIGN OF TRAFFIC CONTROL DEVICES CONSISTENT WITH DIRECTIONS AND GUIDELINES ESTABLISHED BY THE STATE HISTORIC PRESERVATION OFFICE (SHPO), DRIVEWAY CLOSURE AT THE NORTHEAST CORNER, AS WELL AS UPGRADING TRAFFIC SIGNAL EQUIPMENT AND HANDICAP RAMPS FOR COMPLIANCE WITH CURRENT DESIGN STANDARDS UNDER THE AMERICANS WITH DISABILITIES ACT (ADA). TRAFFIC CONTROL DEVICES ALONG EACH LEG OF THE INTERSECTION, INCLUDING STREET PARKING SPACES, WILL BE REVISED TO COMPLEMENT THE CHANGES AT THE INTERSECTION OR UPGRADED TO MEET CURRENT NJDOT AND MUTCD REQUIREMENTS. LIGHTING WILL BE UPGRADED AS REQUIRED UNDER CURRENT NJDOT CRITERIA. RIGHT OF WAY IMPACTS ARE NOT ANTICIPATED, BUT THERE IS POTENTIAL FOR UTILITY IMPACTS.

IN ADDITION, PEDESTRIAN AMENITIES (HANDICAP RAMPS, SIGNING AND CROSSWALKS) WILL BE IMPROVED AT THE ROUTE 45 AND BOWEN AVENUE INTERSECTION (M.P. 9.52) AND AT THE US ROUTE 40 AND MAPLE COURT INTERSECTION (M.P. 10.83), LOCATED NORTH AND EAST RESPECTIVELY OF THE PRIMARY PROJECT INTERSECTION. LIGHTING AT EACH INTERSECTION WILL BE UPGRADED AS REQUIRED UNDER CURRENT NJDOT CRITERIA.

INCLUDE WHEN APPROPRIATE - TECHNICAL PROPOSALS ARE BEING SOLICITED FOR PRELIMINARY ENGINEERING, FINAL DESIGN AND CONSTRUCTION ENGINEERING SERVICES. HOWEVER, SERVICES UNDER THE ORIGINAL AGREEMENT SHALL BE LIMITED TO THE COMPLETION OF PRELIMINARY ENGINEERING SERVICES. FINAL DESIGN SERVICES AND CONSTRUCTION ENGINEERING SERVICES MAY BE INITIATED AT A LATER DATE AS A CONSULTANT AGREEMENT ADDENDUM, AT THE SOLE DISCRETION OF THE STATE.

HARD COPY PROJECT MATERIALS

| | |

|ON DISPLAY |NONE |

| |

| |

|PROJECT MATERIALS (DISPLAY BOARDS, SCHEMATICS, PLANS, STUDIES, ETC.) WILL BE AVAILABLE FOR REVIEW FROM 8:00AM TO 5:00PM ON, MONDAY THROUGH FRIDAY, IN THE |

|BUREAU OF PROFESSIONAL SERVICES, PROCUREMENT DIVISION, UNTIL N/A . VIEWING OF THESE DOCUMENTS WILL BE BY APPOINTMENT ONLY AND IS LIMITED TO A DURATION|

|OF TWO HOURS SO THAT ALL INTERESTED FIRMS MAY HAVE AN OPPORTUNITY TO VIEW THESE DOCUMENTS. TO MAKE AN APPOINTMENT PLEASE CALL THE MANAGER, PROFESSIONAL |

|SERVICES AT 609-530-2452. |

| |

|ELECTRONIC PROJECT MATERIALS |

| | | |

|AVAILABLE ELECTRONICALLY |NOT AVAILABLE ELECTRONICALLY |PARTIALLY AVAILABLE ELECTRONICALLY |

| |

| |

|AS AN ALTERNATE TO SCHEDULING AN APPOINTMENT TO REVIEW HARD COPY DISPLAY MATERIALS AT THE PROFESSIONAL SERVICES OFFICE, WE HAVE ALSO INCLUDED INSTRUCTIONS |

|FOR DOWNLOADING ELECTRONIC DISPLAY MATERIALS. IF YOU NEED ASSISTANCE DOWNLOADING THE MATERIALS, PLEASE E-MAIL PSPD@DOT.STATE.NJ.US. THE DEPARTMENT WILL |

|NOT PROVIDE ELECTRONIC OR ANY OTHER TYPE OF COPIES OF PROJECT MATERIALS TO CONSULTANTS UNLESS OTHERWISE NOTED. |

ELIGIBLE FIRMS

SEE THE ATTACHED LIST OF FIRMS THAT ARE PRESENTLY PREQUALIFIED FOR THIS PROJECT. THESE FIRMS ARE ELIGIBLE TO SUBMIT A TECHNICAL PROPOSAL. IF YOUR FIRM IS NOT ON THIS LIST, YOUR TECHNICAL PROPOSAL WILL ONLY BE ACCEPTED IF YOUR FIRM BECOMES PREQUALIFIED WITH THE NJDOT AS OF 3:00 PM ON THE CLOSING DATE OF THIS SOLICITATION IN THE FOLLOWING DISCIPLINE(S) AND LEVEL OF SERVICE. FIRMS ARE URGED TO CALL THE MANAGER, BUREAU OF PROFESSIONAL SERVICES AT 609-530-2452 IF YOUR FIRM IS NOT ON THE ATTACHED ELIGIBLE FIRM LISTING BUT INTENDS TO SUBMIT A TECHNICAL PROPOSAL.

|DISCIPLINE (S) |LEVEL OF SERVICE |

| H-1 HIGHWAY DESIGN |B |

| E-4 ENVIRONMENTAL PERMITTING |A |

| | |

ONLY ONE (1) TECHNICAL PROPOSAL SUBMISSION IS ALLOWED PER FIRM (NO TEAMS) UNLESS OTHERWISE NOTED ON PAGE 1 OF THIS SOLICITATION. SUB CONSULTANTS THAT PLAN TO PARTICIPATE IN THIS SOLICITATION MUST BE COST BASIS APPROVED BY THE NJDOT AS OF 3:00 PM ON THE CLOSING DATE OF THIS SOLICITATION. FAILURE TO COMPLY WITH THIS REQUIREMENT MAY RESULT IN DISQUALIFICATION FROM THE PROJECT.

FIRMS WANTING TO JOINT VENTURE MAY DO SO BY RETURNING A COMPLETED STATEMENT OF JOINT VENTURE AS PART OF THEIR SUBMISSION OF A TECHNICAL PROPOSAL. EACH FIRM PARTICIPATING IN THE JOINT VENTURE MUST BE PREQUALIFIED BY THE NJDOT. EACH DISCIPLINE AND LEVEL OF SERVICE REQUIREMENT OF A PROJECT MUST BE SATISFIED BY AT LEAST ONE MEMBER OF THE JOINT VENTURE. PLEASE REFER TO OUR WEBSITE FOR THE STATEMENT OF JOINT VENTURE FORM.

CONSULTANT’S QUESTIONS

E-MAIL QUESTION(S) TO PSPD@DOT.STATE.NJ.US, ATTENTION MANAGER, BUREAU OF PROFESSIONAL SERVICES. SPECIFY "TP # 947 QUESTION" IN SUBJECT LINE. IF YOUR FIRM DOES NOT HAVE ACCESS TO E-MAIL YOU MAY FAX YOUR QUESTIONS TO 609-530-2212. THE BUREAU OF PROFESSIONAL SERVICES WILL FORWARD THE QUESTION(S) TO THE PROJECT MANAGER AND POST ALL QUESTIONS AND ANSWERS ON THE PROFESSIONAL SERVICES WEBSITE.

PROCUREMENT PROCESS

ONE STEP PROCUREMENT PROCESS. RECOMMENDATIONS TO THE CONSULTANT SELECTION COMMITTEE WILL BE BASED ON THE EVALUATION CRITERIA LISTED IN TABLE A. THE DEPARTMENT ANTICIPATES A SELECTION WILL BE MADE DURING SEPTEMBER 2013.

CERTIFIED FIRM UTILIZATION

| | |PRIME CONTRACTORS MAY USE DBE AND/OF ESBE FIRMS IN ORDER TO SATISFY THESE ESBE GOALS. |

|FEDERAL GOAL |15.7% ESBES | |

AN UPDATED CERTIFIED FIRM LIST MAY BE OBTAINED FROM THE DEPARTMENT’S WEB SITE AT:

OR BY CONTACTING THE OFFICE OF CIVIL RIGHTS/AFFIRMATIVE ACTION AT 609-530-3009. ALL FIRMS TO BE UTILIZED TO MEET THE GOALS SHOULD BE LISTED UNDER THE ADMINISTRATIVE REQUIREMENTS IN SECTION 2 OF THE SOLICITATION. FAILURE TO MAKE A GOOD FAITH EFFORT TO MEET THE ESTABLISHED GOAL MAY BE CAUSE FOR CANCELING NEGOTIATIONS WITH A SELECTED FIRM AND SELECTING A NEW FIRM.

SUBMITTAL DUE DATE / TIME

TECHNICAL PROPOSALS FOR THIS SOLICITATION MUST BE RECEIVED BY THE DEPARTMENT OF TRANSPORTATION, 1035 PARKWAY AVENUE, TRENTON, NEW JERSEY 08625-0600 AND LOGGED IN AT THE RECEPTIONIST/LOBBY AREA AT THE DAVID J. GOLDBERG BUILDING (MAIN OFFICE BUILDING - MOB) WITH THE DATE AND TIME.  TP'S ARE TO REMAIN AT THE DAVID J. GOLDBERG BUILDING (MAIN OFFICE BUILDING - MOB) AND PROFESSIONAL SERVICES PERSONNEL WILL PICK THEM UP.  TECHNICAL PROPOSALS WILL NOT BE ACCEPTED AT THE ENGINEERING AND OPERATIONS (E&O) BUILDING.  THE ABSOLUTE DEADLINE FOR TP'S IS 3:00PM ON THE CLOSING DATE OF THE SOLICITATION.  ALL TP'S MUST BE ADDRESSED TO THE MANAGER, PROFESSIONAL SERVICES WITH THE PROJECT NAME AND TP# CLEARLY INDICATED, TO ENSURE THEIR PROPER DESTINATION. IF MAILING IN THE TP'S, THEY MUST BE LOGGED IN AT THE NJDOT HEADQUARTERS MAILROOM BY 3:00PM ON THE CLOSING DATE AS WELL.  NO EXCEPTIONS. SEE THE PROFESSIONAL SERVICES WEBSITE FOR THE COMPLETE PROCEDURE. FOUR (4) COPIES OF THE TECHNICAL PROPOSAL ARE REQUIRED. ONLY ONE (1) TECHNICAL PROPOSAL SUBMISSION IS ALLOWED PER FIRM (NO TEAMS) UNLESS OTHERWISE NOTED ON PAGE 1 OF THIS SOLICITATION.

NOTE: THE SUBMISSION MUST ALSO INCLUDE A CD WITH THE FULL TECHNICAL PROPOSAL PACKAGE IN MICROSOFT WORD OR ADOBE ACROBAT FORMAT WITH AN ORIGINAL SIGNED LETTER OF TRANSMITTAL.

AFFIRMATIVE ACTION

THE SELECTED FIRM WILL BE REQUIRED TO COMPLY WITH THE AFFIRMATIVE ACTION REQUIREMENTS OF P.L. 1975, C.127 (N.J.A.C. 17:27).

PRIOR TO EXECUTION OF AN AGREEMENT, THE SELECTED FIRM WILL BE REQUIRED TO SUBMIT ONE OF THE FOLLOWING DOCUMENTS DISCLOSING AFFIRMATIVE ACTION EVIDENCE: LETTER OF FEDERAL APPROVAL OR CERTIFICATE OF EMPLOYEE INFORMATION REPORT OR COMPLETED AFFIRMATIVE ACTION EMPLOYEE INFORMATION REPORT (FORM AA302).

POST EMPLOYMENT RESTRICTIONS OF THE NJ CONFLICTS OF INTEREST LAW

FIRMS ARE ADVISED TO BE AWARE OF POST EMPLOYMENT RESTRICTIONS FOR EX-NJDOT EMPLOYEES WHO ARE UTILIZED FOR WORK UNDER THIS TECHNICAL PROPOSAL. FAILURE TO COMPLY WITH THIS MAY RESULT IN DISQUALIFICATION FROM THE PROJECT. REFER TO NJSA 52:13D-17, WHICH STATES:

NO STATE OFFICER OR EMPLOYEE OR SPECIAL STATE OFFICER OR EMPLOYEE, SUBSEQUENT TO THE TERMINATION OF HIS OFFICE OR EMPLOYMENT IN ANY STATE AGENCY, SHALL REPRESENT, APPEAR FOR, NEGOTIATE ON BEHALF OF, OR PROVIDE INFORMATION NOT GENERALLY AVAILABLE TO MEMBERS OF THE PUBLIC OR SERVICES TO, OR AGREE TO REPRESENT, APPEAR FOR, NEGOTIATE ON BEHALF OF, OR PROVIDE INFORMATION NOT GENERALLY AVAILABLE TO MEMBERS OF THE PUBLIC OR SERVICES TO, WHETHER BY HIMSELF OR THROUGH ANY PARTNERSHIP, FIRM OR CORPORATION IN WHICH HE HAS AN INTEREST OR THROUGH ANY PARTNER, OFFICER OR EMPLOYEE THEREOF, ANY PERSON OR PARTY OTHER THAN THE STATE IN CONNECTION WITH ANY CAUSE, PROCEEDING, APPLICATION OR OTHER MATTER WITH RESPECT TO WHICH SUCH STATE OFFICER OR EMPLOYEE OR SPECIAL STATE OFFICER OR EMPLOYEE SHALL HAVE MADE ANY INVESTIGATION, RENDERED ANY RULING, GIVEN ANY OPINION, OR BEEN OTHERWISE SUBSTANTIALLY AND DIRECTLY INVOLVED AT ANY TIME DURING THE COURSE OF HIS OFFICE OR EMPLOYMENT. ANY PERSON WHO WILLFULLY VIOLATES THE PROVISIONS OF THIS SECTION IS A DISORDERLY PERSON, AND SHALL BE SUBJECT TO A FINE NOT TO EXCEED $500.00 OR IMPRISONMENT NOT TO EXCEED SIX MONTHS, OR BOTH.

BUSINESS REGISTRATION FOR PROVIDERS OF GOODS AND SERVICES TO THE STATE

IN ACCORDANCE WITH N.J.S.A. 52:32-44, ALL NEW JERSEY AND OUT OF STATE CONSULTANTS MUST OBTAIN A BUSINESS REGISTRATION CERTIFICATE (BRC) FROM THE DEPARTMENT OF THE TREASURY, DIVISION OF REVENUE PRIOR TO CONDUCTING BUSINESS WITH THE DEPARTMENT. THE BIDDER MUST SUBMIT A COPY OF ITS BRC AND THAT OF ANY NAMED SUBCONTRACTOR TO THE DEPARTMENT PRIOR TO THE TIME A CONTRACT IS AWARDED OR AUTHORIZED A BIDDER WHO FAILS TO SUBMIT A COPY OF A VALID BRC IN ACCORDANCE WITH THE STATUTE WILL BE HELD LIABLE FOR MONETARY PENALTIES IN ACCORDANCE WITH N.J.S.A. 54-49-4.1

QUESTIONS REGARDING HOW TO OBTAIN A BRC CAN BE DIRECTED TO THE DIVISION OF REVENUE AT (609) 292-1730. THE BUSINESS REGISTRATION FORM (FORM NJ-REG) CAN BE FOUND ONLINE AT THE DEPARTMENT OF TREASURY - BUSINESS REGISTRATION OR THE DIVISION OF REVENUE - GETTING REGISTERED .

NOTICE CERTIFICATION OF NON-INVOLVEMENT IN PROHIBITED ACTIVITIES IN IRAN

PURSUANT TO N.J.S.A. 52:32-58, THE BIDDER MUST CERTIFY THAT NEITHER THE BIDDER, NOR ONE OF ITS PARENTS, SUBSIDIARIES, AND/OR AFFILIATES (AS DEFINED IN N.J.S.A. 52:32-56(E)(3)), IS LISTED ON THE DEPARTMENT OF THE TREASURY'S LIST OF PERSONS OR ENTITIES ENGAGING IN PROHIBITED INVESTMENT ACTIVITIES IN IRAN AND THAT NEITHER IS INVOLVED IN ANY OF THE INVESTMENT ACTIVITIES SET FORTH IN N.J.S.A. 52:32-56(F).  IF THE BIDDER IS UNABLE TO SO CERTIFY, THE BIDDER SHALL PROVIDE A DETAILED AND PRECISE DESCRIPTION OF SUCH ACTIVITIES.

COMPLIANCE WITH OWNERSHIP DISCLOSURE &

INVESTMENT ACTIVITIES IN IRAN FORMS

THE FIRM SELECTED BY THE DEPARTMENT TO PERFORM THIS WORK WILL BE REQUIRED TO FILE AN OWNERSHIP DISCLOSURE FORM AND INVESTMENT ACTIVITIES IN IRAN FORM.

USE THE FOLLOWING LINK TO ACCESS THE OWNERSHIP DISCLOSURE FORM AND INVESTMENT ACTIVITIES IN IRAN FORM WHICH CAN BE FOUND IN THE “STANDARD RFP FORMS” SECTION ON THE NEW JERSEY DIVISION OF PURCHASE AND PROPERTY WEBSITE:



SCOPE OF WORK

THE SCOPE OF WORK INCLUDES PRELIMINARY ENGINEERING, FINAL DESIGN AND CONSTRUCTION ENGINEERING SERVICES. HOWEVER SERVICES UNDER THE ORIGINAL AGREEMENT SHALL BE LIMITED TO PRELIMINARY ENGINEERING ONLY, WITH FINAL DESIGN AND CONSTRUCTION ENGINEERING SERVICES TO BE INITIATED AT A LATER DATE AS EXTRA WORK, AT THE SOLE DISCRETION OF THE STATE.

THE CONSULTANT WILL PERFORM THE ALL THE NEW PROCESS PRELIMINARY ENGINEERING TASKS AND FINAL DESIGN TASKS NECESSARY TO COMPLETE PLANS, SPECIFICATION AND ESTIMATES (PS&E) IN ACCORDANCE WITH THE DESIGN STANDARDS AND THE CURRENT NJDOT POLICIES AND PROCEDURES TO ENABLE NJDOT TO ADVERTISE THE PROJECT FOR CONSTRUCTION. THE FOLLOWING DESIGN ACTIVITIES ARE EXPECTED FOR THIS PROJECT:

• DEVELOP CONSTRUCTION LEVEL MAPPING AND SUPPLEMENT SURVEY FOR DESIGN, INCLUDING ROW LINES.

• DEVELOP ROADWAY PLANS AND PROFILE, DRAINAGE PLANS, PUMPING STATION DESIGN, PAVEMENT DESIGN, GEOTECHNICAL INVESTIGATIONS, LIGHTING PLANS, TRAFFIC CONTROL AND STAGING PLANS, TRAFFIC SIGNING AND STRIPPING PLANS, ITS FACILITY PLANS, ENVIRONMENTAL PLANS, STORMWATER BASIN DESIGN AND PLANS, AND SOIL EROSION AND SEDIMENT CONTROL PLANS.

• DEVELOP ROW PLANS FROM PRELIMINARY TO FINAL ROW PHASE WHICH WILL INCLUDE DEED SEARCH AND TITLE REPORT, AND COORDINATE WITH NJDEP FOR TIDELANDS AND RIPARIAN GRANT.

• PREPARE AND OBTAIN APPROVAL OF NEPA DOCUMENT.

• PREPARE AND OBTAIN APPROVAL OF DESIGN EXCEPTION REPORT.

• PREPARE HAZARDOUS WASTE MITIGATION PLAN FOR IMPACTED PROPERTIES AS PER NJDEP LATEST RULES AND REGULATION INCLUDING LINEAR PROJECT RULES.

• PROVIDE SUPPORT FOR NJDOT PUBLIC INVOLVEMENT PROCESS.

• COMPLETE APPLICABLE REVISIONS TO PUBLIC INVOLVEMENT ACTION PLAN.

• PREPARES AND UPDATES ENTRIES TO THE DESIGN COMMUNICATION REPORT.

• DEVELOP UTILITY ALTERNATIVE OF ACCOMMODATION, UTILITY CHECKLIST AND UTILITY AGREEMENT PLANS.

• PREPARE ALL PERMITS PLANS AND DOCUMENTATION AS PER NJDEP AND OTHER REGULATORY OFFICES.

• DEVELOP SUPPLEMENTARY SPECIFICATION REQUIRED FOR NEW ITEMS OF CONSTRUCTION REQUIRE FOR PROJECT.

• DEVELOP CONSTRUCTION COST ESTIMATE AS PER TRANSPORT ESTIMATE GUIDELINES.

A DETAILED SCOPE OF WORK FORM FOR PE PHASE IS INCLUDED IN THE CONCEPT DEVELOPMENT REPORT WHICH IS PROVIDED IN THE ELECTRONIC FORM ON THE NJDOT WEB PAGE AS PART OF THIS SOLICITATION.

COMPUTER GENERATED LIST OF ELIGIBLE

CONSULTANTS AS OF THE POSTING DATE

H-1 LEVEL B

8/7/2013

AECOM USA, INC. ALAIMO GROUP ALFRED BENESCH & COMPANY

CHARLES MANNING, P.E. MR. TERRANCE MULLIGAN MS. DENISE BEISSEL

30 KNIGHTSBRIDGE RD. SUITE 520 200 HIGH STREET 840 HAMILTON STREET, SUITE 400

PISCATAWAY, NJ 08854 MT. HOLLY, NJ 08060 ALLENTOWN, PA 18101

732-564-3200 609-267-8310 610-439-7066

CHARLES.MANNING@ TMULLIGAN@ DBEISSEL@

AMERCOM CORP. AMMANN & WHITNEY CONSULTING ENGINEERS, P.C. ARORA AND ASSOCIATES., P.C.

MR. MARK SHEPTOCK MR. ANDY SANDOR MR. NARENDRA KHAMBHATI

1259 ROUTE 46 EAST. HARBORSIDE FINANCIAL CENTER 1200 LENOX DRIVE, SUITE 200

BUILDING #1 2500 PLAZA 5 LAWRENCEVILLE, NJ 08648

PARSIPPANY, NJ 07054 JERSEY CITY, NJ 07311 609-844-1111

973-402-6111 212-492-5141 ARORA@

MSHEPTOCK@ ASANDOR@AMMANN-

BL COMPANIES ARCHITECTS/ENGINEERS NEW JERSEY, INC. BOSWELL ENGINEERING BUCHART-HORN, INC.

MR. DEREK A. KOHL MR. STEPHEN T. BOSWELL MR. R. SCOTT STERNBERGER

355 RESEARCH PARKWAY 330 PHILLIPS AVENUE 2 EVES DRIVE

MERIDEN, CT 06450 SOUTH HACKENSACK, NJ 07606 SUITE 110

203-630-1406 201-641-0770 MARLTON, NJ 08053

DKOHL@ MARKETING@ 856-797-4300

CDWYER@BH-

CH2M HILL, INC. CHERRY, WEBER & ASSOCIATES, P.C. CLOUGH HARBOUR & ASSOCIATES LLP

MR. STEPHEN DILTS MR. C. DOUGLAS CHERRY MR. GARY W. ROBINSON, P.E.

119 CHERRY HILL RD. 755 MEMORIAL PARKWAY, SUITE 110 2007 ROUTE 46, SUITE 107

SUITE 300 PHILLIPSBURG, NJ 08865 PARSIPPANY, NJ 07054

PARSIPPANY, NJ 07054 908-454-3080 973-299-1100

973-316-9300 CDC@ GROBINSON@CHA-

STEVE.DILTS@

DEWBERRY ENGINEERS INC. FRENCH & PARRELLO ASSOCIATES, P.A. GANNETT FLEMING, INC.

MR. H. ALI VAEZI STEVEN A. TARDY MR. JAMES DZIEDZIAK

200 BROADACRES DRIVE 1800 ROUTE 34, SUITE 101 SOUTHFIELD CENTER

SUITE 410 WALL, NJ 07719 ONE CRAGWOOD ROAD, SUITE 205

BLOOMFIELD, NJ 07003-3154 732-312-9800 SOUTH PLAINFIELD, NJ 07080

973-780-9359 STEVEN.TARDY@ 908-755-0040

AVAEZI@ JDZIEDZIAK@

GREENMAN-PEDERSEN, INC. H.W. LOCHNER, INC. HAKS ENGINEERING, P.C.

MR. GREGORY P. JOHNSON, P.E. MS. JEANNE CORMIER MRS. LISSETTE MIQUEL

100 CORPORATE DRIVE 2110 SILAS DEANE HIGHWAY 33 WOOD AVENUE SOUTH

SUITE 301 ROCKY HILL, CT 06067 SUITE 830

LEBANON, NJ 08833 860-513-4003 ISELIN, NJ 08830

908-236-9001 JCORMIER@ 732-744-1490

GJOHNSON@ LMIQUEL@

COMPUTER GENERATED LIST OF ELIGIBLE

CONSULTANTS AS OF THE POSTING DATE

H-1 LEVEL B

8/7/2013

HARDESTY & HANOVER, LLP HATCH MOTT MACDONALD, LLC. HDR ENGINEERING, INC.

MR. ANDREW COATES MR. MARCO LEVOYER MR. PETE DAVIS

1501 BROADWAY 111 WOOD AVENUE SOUTH 1 RIVERFRONT PLAZA, 1037 RAYMOND BLVD.

NEW YORK, NY 10036 ISELIN, NJ 08830-4112 14TH FLOOR

212-944-1150 973-912-7532 NEWARK, NJ 07102

ACOATES@HARDESTY- MARCO.LEVOYER@ 973-474-5010

PETE.DAVIS@

HNTB CORPORATION IH ENGINEERS, P.C. JACOBS ENGINEERING GROUP, INC.

MR. SCOTT BURROWES MR. IFTEKHAR HOSSAIN MISS. JOELY JACKOWITZ

9 ENTIN ROAD 103 COLLEGE RD. EAST 299 MADISON AVE

SUITE 202 1ST FLOOR MORRISTOWN, NJ 07962-1936

PARSIPPANY, NJ 07054 PRINCETON, NJ 08540 973-267-8830

973-434-3100 609-734-8400 JOELY.JACKOWITZ@

SBURROWES@ IFTE@

JOHNSON, MIRMIRAN & THOMPSON KIMLEY-HORN AND ASSOCIATES, INC. KS ENGINEERS, P.C.

MR. BRIAN STRIZKI MS. TAMMY JENCEN KAMAL SHAHID

1200 LENOX DRIVE, SUITE 101 13221 WOODLAND PARK RD. 494 BROAD ST., 4TH FLOOR

TRENTON, NJ 08648 SUITE 400 NEWARK, NJ 07102

609-512-3900 HERNDON, VA 20171 973-623-2999

BSTRIZKI@ 703-674-1300 KSHAHID@

TAMMY.JENCEN@KIMLEY-

LOUIS BERGER GROUP, INC. (THE) LS ENGINEERING ASSOCIATES CORPORATION MASER CONSULTING, P.A.

MS. COSEMA CRAWFORD MR. KIM LAW MR. ROBERT DIBARTOLO

412 MOUNT KEMBLE AVE. 150 RIVER RD., BLDG. E, SUITE E2 331 NEWMAN SPRINGS RD.

P.O. BOX 1946 MONTVILLE, NJ 07045 SUITE 203

MORRISTOWN, NJ 07962-1946 973-588-3122 RED BANK, NJ 07701

973-407-1000 KIMLAW@ 732-383-1950

CCRAWFORD@ RDIBARTOLO@

MCCORMICK TAYLOR, INC. MCMAHON ASSOCIATES, INC. MICHAEL BAKER JR., INC.

MR. JAMES WIGGANS MR. MARK A. ROTH MR. MICHAEL CONABOY

TWO COMMERCE SQUARE 4573 SOUTH BROAD ST., SUITE 200 300 AMERICAN METRO BLVD.

2001 MARKET ST., 10TH FLOOR YARDVILLE, NJ 08620 HAMILTON, NJ 08619

PHILADELPHIA, PA 19103 609-585-5745 609-807-9522

215-592-4200 MARK.ROTH@ MCONABOY@

JCWIGGANS@

MODJESKI & MASTERS, INC. MP ENGINEERS, P.C. NAIK CONSULTING GROUP, P.C.

MR. RICHARD A. MARTINO MR. MAHENDRA PATEL MR. SANJAY NAIK

155 EAST THIRD ST. 23 JEFFERSON PLAZA METROPLEX OFFICE PLAZA

P.O. BOX 737 PRINCETON, NJ 08540 200 METROPLEX DRIVE, SUITE 403

MOORESTOWN, NJ 08057 732-274-1400 EDISON, NJ 08817

856-608-7400 MPATEL@ 732-777-0030

RAMARTINO@ SNAIK@

COMPUTER GENERATED LIST OF ELIGIBLE

CONSULTANTS AS OF THE POSTING DATE

H-1 LEVEL B

8/7/2013

PARSONS BRINCKERHOFF, INC. PARSONS TRANSPORTATION GROUP, INC. PENNONI ASSOCIATES, INC.

MR. ANTHONY J. DEJOHN, JR. MR. HOWARD UNGAR MR. DAVID LOWDERMILK

2000 LENOX DRIVE 100 BROADWAY ONE DREXEL PLAZA

3RD FLOOR NEW YORK, NY 10005 301 MARKET ST., 2ND FLOOR

LAWRENCEVILLE, NJ 08648 212-266-8573 PHILADELPHIA, PA 19104

609-512-3531 HOWARD.UNGAR@ 215-222-3000

DEJOHN@ DLOWDERMILK@

RBA GROUP, THE REMINGTON & VERNICK ENGINEERS, INC. SJH ENGINEERING, P.C.

MR. JOHN MAIORANA MR. FRANK J. SENEY, JR. S. JAYAKUMARAN

7 CAMPUS DRIVE, SUITE 300 232 KINGS HIGHWAY EAST 26 JEFFERSON PLAZA

PARSIPPANY, NJ 07054-4495 HADDONFIELD, NJ 08033 PRINCETON, NJ 08540-9500

973-946-5600 856-795-9595 732-329-0500

JMAIORANA@ FRANK_SENEY@ SJAY@

STANTEC CONSULTING SERVICES, INC. STV INCORPORATED T & M ASSOCIATES

MR. MICHAEL MCDONNELL MR. DONALD J. MAUER, JR. MR. DONATO DI ZUZIO

365 WEST PASSAIC ST. 820 BEAR TAVERN RD. 11 TINDALL ROAD

SUITE 175 SUITE 200 MIDDLETOWN, NJ 07748-2792

ROCHELLE PARK, NJ 07662 TRENTON, NJ 08628-1021 732-671-6400

201-587-9040 609-530-0142 DDIZUZIO@

MICHAEL.MCDONNELL@ DONALD.MAUER@

T. Y. LIN INTERNATIONAL TAYLOR, WISEMAN & TAYLOR TECTONIC ENGINEERING AND SURVEYING CONSULTANTS, PC

MR. ROBERT MEDINA MR. THOMAS M. HOWELL MR. CHARLES S. DIMARCO

ONE EDGEVIEW DRIVE 124 GAITHER DRIVE PARK 80 EAST

HACKETTSTOWN, NJ 07840 SUITE 150 160 PEHLE AVENUE, SUITE 306

908-850-3366 MOUNT LAUREL, NJ 08054 SADDLE BROOK, NJ 07603-5227

ROBERT.MEDINA@ 856-235-7200 201-843-0403

HOWELL@ CDIMARCO@

TRAFFIC PLANNING AND DESIGN, INC. TRANSYSTEMS CORPORATION TRC ENGINEERS, INC.

MR. JOHN PYNE MR. RONALD GIAMARIO MR. WILLIAM WEAVER

2 RIVERSIDE DRIVE, SUITE 506 45 EISENHOWER DRIVE 16000 COMMERCE PAKRWAY, STE. B

CAMDEN, NJ 08103 PARAMUS, NJ 07652 MT. LAUREL, NJ 08054

856-966-4242 201-368-0400 856-273-1224

JPYNE@ REGIAMARIO@ WWEAVER@

URBAN ENGINEERS, INC. URS CORPORATION WSP USA CORP.

MR. WILLIAM MCGARRIGEL RAJENDRA NAVALURKAR MR. ROBERT MASCHKE

COLWICK BUSINESS CENTER 1255 BROAD STREET 3 AAA DRIVE

55 HADDONFIELD RD., SUITE 200 SUITE 201 SUITE 203

CHERRY HILL, NJ 08002 CLIFTON, NJ 07013-3398 HAMILTON, NJ 08691-1814

856-663-5550 973-883-8500 609-584-0050

WPMCGARRIGEL@ RAJENDRA.NAVALURKAR@ ROBERT.MASCHKE@

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download