OVERSEAS PAKISTANIS FOUNDATION



Muhammad Owais Khan

Quantity Surveyor (B Tech Civil)

Residence: Al Karama – Dubai UAE

E-mail: owaiskhanqs@

Mobile: 052-7508499

Career Summary: -

A qualified Quantity Surveyor, with a team member skill, having more than 08 years worked experience in UAE & Pakistan mostly worked on large scale Industrial, Residential, hotel, Public development and Military Projects in both pre and post contract stages to manage the Cost of both Civil and MEP with successful track records in Estimation, Budgeting, Variations, Claims, Progress Payments, Subcontract Management, and ability to perform all these tasks in a fast paced environment and meet stringent deadlines.

Objective: -

Currently looking for a challenging position with a dynamic, ambitious and growing group where I could apply all my skills abilities obtained, through worked experience and educational background for the success of my professional field.

Professional Experience: -

Contractor: HLG Contracting LLC (BICC) Dubai-UAE

Designation: Quantity Surveyor

Department: Post Tender

Duration: 28/Aug/2018 to Date

1. Project: Downtown Infra Helix Bridges Ramp, 2 Bridges, Roads & Utilities Client: Emaar Properties

Project Manager: Turner

Cost Consultant: Omnium International

Design Consultant: Parsons Overseas Limited

Supervision Consultant: Jacobs

Contract Type: Fixed Price Lumpsum Contract

Contract Value: AED 92 million

Duties & Key Responsibilities

➢ Preparation of Monthly Progress Payments IPA and getting approvals from the consultant for IPC.

➢ Preparing Variations Orders for additional works

➢ CVR Reports (Contract valuation Reports)

➢ Reconciliation for wastage (Mainly Concrete and Steel)

➢ Budgeting revenues, resource quantities, costs and expenses, assets and cash flows.

➢ Commercial CVR Presentation

➢ Final Forecast Revenue (FFR)and Final Forecast Cost (FFC) Reports

➢ Sub-Contractor Management

➢ EOT, Prelims, Supervision and Design Changes Claims assisting LCM and Planning Engineer

Contractor: Zahrat Al Safa Contracting LLC (Dubai)

Designation: Quantity Surveyor

Department: Pre & Post Tender

Duration: 19/Apr/2016 to 16/Aug/2018

Post tender Approved Quantity Surveyor from M/s Azizi Developments

Post tender Approved Quantity Surveyor from M/s Lacasa for Damac Akoya

1) Project: 10 Residential Building at Meydan District, Phase-1, Dubai UAE

4 Types (2B+G+7) (2B+G+8) (2B+G+9) (2B+G+10)

Client: Azizi Developments

Consultant: 360 Degrees

Contract Type: Lump sum

BUA: 2,305,000.00 Sq. ft

Contract Value: Confidential Commencement Date: November, 2017

Duties & Key Responsibilities

➢ Preparation of Monthly Progress Payments IPA and getting approvals from the consultant.

➢ Preparing Variations, Time related cost.

➢ Review and recommendation of sub-contractor’s valuation, claim, variation and preparing payment certificate.

➢ Preparing Bar Bending Schedule

➢ Materials Quantity takes off as per drawings as per project requirements.

➢ Attending weekly project meeting

2) Project: PJ 4016 Additions to Dubai Special Sport Club at Qusais Dubai

Client: Dubai Municipality

Consultant: Gulf Engineering & Consultants

Contract Type: Re-measurable

BUA: 100,816.00 Sq.ft

Plot Area with Stadium, External works, Roads & Parking 837,105.00 Sq.ft

Contract Value: AED 41.40 million Handed over on dated: April, 2017

Duties & Key Responsibilities

➢ Preparation of Monthly Progress Payment IPA & Statement of Completion as per DM standard procedure.

➢ Preparing Bar Bending Schedule

➢ Preparing Variations Orders and EOT Claims

➢ Review and recommendation of sub-contractor’s valuation, claim and variation.

➢ Cost Control, Payment Log

➢ Final Account, close out (Main Contractor and Sub contractor)

➢ Quantity takes off as per actual work done on site.

3) Project: PJ 10061 Heritage Souk and Hotel at Hatta Dubai

Client: Dubai Municipality

Consultant: Al Fahidi Engineering Consultant

Contract Type: Re-measurable Handed over on dated: December, 2017

BUA: 84,940.00 Sq.ft

Plot Area with External works, Roads & Parking 256,904.00 Sq.ft

Contract Value: AED 29.0 million plus5.8million approved Variation

Duties & Key Responsibilities

➢ Preparation of Monthly Progress Payment IPA as per DM standard procedure.

➢ Preparing Variations and Claims.

➢ Review and recommendation of sub-contractor’s valuation, claim and variation.

➢ Verification of sub-contractors & supplier payments.

➢ Cost Control, Payment Log

➢ Materials Quantity takes off as per drawings as per project requirements.

➢ Attending weekly project meeting

Pre Tender Experienced as Quantity Surveyor

Duties and Responsibilities

➢ Quantities take off for tenders from drawings with respect to the ‘Principles of Measurement (International)-POMI.

➢ Preparation/Checking of Built up area.

➢ Respond to post tender clarifications.

➢ Study architectural and structural drawings and specifications.

➢ Quantity takes off all elements from the tender/ Contract Documents received and comparing with Consultant BOQ to find out if any Discrepancies.

➢ Preparing Reinforcement schedule for estimation.

➢ Preparing/verifying Bills of quantities.

➢ Preparation of Tender Brief

➢ Preparation and verification of tender submittals as per tender requirement

➢ Differentiating and assigning documents (Drawings/Specification/BOQ) required for Suppliers and Subcontractors.

➢ Selection of Sub contractor by comparing the Submitted Bill of Quantities

Contractor: Kspan General Contracting LLC

Designation: Quantity Surveyor

Department: Tendering – (Estimation department)

Duration: 08/Oct/2014 to 07/Apr/2016 (01year 05 months)

Projects: CMW-14043, 14088, C001, 1009, K9 Units Abu Dhabi Police

Duties and Responsibilities

➢ Preparation of Tender Documents Bill of Quantities.

➢ Measurement, analysis and evaluation of the works in accordance with the conditions of Contract.

➢ Cost Analysis for Tenders in accordance of Specification.

➢ Review and recommendation of sub-contractor’s valuation, claim and variation.

➢ Responsible for preparing bar bending schedules.

➢ Monitoring wastage of materials through reconciliation and informed to concern site or head office Management.

➢ Preparation of Variations and claims

➢ Preparation of quotations for precast Structure with Abu Dhabi precast Factory.

➢ Preparing payments for sub-contractor work according to actual quantities on site.

➢ AutoCAD drafting (2D) architecture as built and Shop drawing.

Procurement of materials as per consultant’s specification and approval, evaluate tenders on return, negotiate with them if necessary

Some of the major pre tender project involved in UAE

S.No

Project name

Client

Consultant Approximate project value in AEDBuilt-up area in M21Commercial office Building in al QuozM/s Union Co-operative societyM/s NAGA 34.70 million10,4692Residential Building G+3P+HC+21 in Al Barsha 4th stM/s Sky Estate LimitedM/s Al Gurg 74.20 million15,1643

Residential Building G+3P+14 in Downtown Jabel AliM/s Abbasi GroupM/s Eng Adnan Saffarini 87.25 million21,9884G+3 Barracks for Dubai Police Al Barsha SouthM/s Dubai PoliceM/s.Al Ajmi Eng33.0 million5,8535

03 Buildings of 3 Star Hotel Building in Jadaf

(B+G+5), B+G+6), and (B+G+7),Mr. Rashed Mohammad Abdulla KaramastjiM/s Dome Engineering75.70 million15,7976

School Building (G+3) in Warqa FirstMr. Sheikh Suhail Ali Al MaktoumM/s Delta Engineering23.20 million5,0367 Labour Court in Academic City - DubaiM/s Dubai MunicipalityM/s Mac Al Gurg130.90 million35,127810 Residential Building

4 Types (2B+G+7) (2B+G+8)(2B+G+9)(2B+G+10)M/s Azizi DevelopmentsM/s360 Degree & Eng Adnan Saffarini Confidential221,5749Dibba Municipality office ExtensionM/s Dibba MunicipalityM/s NEXT

Engineering6.2 million1,99010Juma Mosque Al Badr Phase-1Dubai Islamic BankM/s.LACASA Arch & Eng Consultants19.4 million1,75611Akoya Oxygen Community FAC (G+1+R)Center at Dubai LandM/s DAMACM/s.UA Architects 50.2 million5,31512Hotel/Serviced apartments (2B+G+35+Roof)M/s EQ Properties Dev M/s Arif & Bintoak174 million45,09613Hotel Building (B+G+M+11 Typ) in FujairahM/s Fujairah MunicipalityM/s.Arabaian

EngineeringConfidential12,677

Contractor: AJM Construction

Designation: Project Quantity Surveyor

Department: Post Tender

Duration: 09/Jun/2014 to 04/Oct/2014. (04 months)

Project: Union Fabrics Ltd (Cost Rs270 million Pak)

Duties and Responsibilities

Preparation of company Bills.

Preparing and verifying sub contractor’s bills.

Review and recommendation of sub-contractor’s valuation, claim and variation

Preparation of Bar Bending Schedules.

Checking suppliers submitted BOM.

Preparing Rate Analysis cost estimation for Non-BOQ/extra items.

Quantities take off as per drawing for material Requisitions.

Making as built & details drawings on Autocad which required for billing

Consulting Engineers: AA Associates (Planners & Consulting Engineers)

Designation: Quantity Surveyor

Department: Pre Tender (2 Years) and Post Tender (1 Year)

Duration: 04/Jul/2011 to 07/Jun/2014 (02 Years 11months)

Duties and Responsibilities

Quantities take off for Tender Documents Bill of Quantities (Structural & Architectural Items)

Measuring quantities as per drawing for Pre Tenders.

Checking and Verify Main Contractors (Civil Work) submitted IPC of large Scale Projects i.e. (Textiles, Steel mills, ware houses, Road Work, Waste water treatment plant, industrial manufacturing units, Hospital, Dairies, Grid stations and Residential Buildings)

Preparing and Checking Bar Bending Schedules.

Reconciliation for Owner Furnished material.

Checking contractor’s submitted Requisitions of material in case of material supplied by the client.

Contractor: Mohiuddin Associates

Designation: Asst. Project Engineer cum Jr. Quantity Surveyor

Duration: 22/Oct/2010 to 01/Jul/2011. (10 months)

Project: Al Ghafoor Eden Residential Building project Karachi

(1 Basement Car Parking + Ground + Mezzanine + 10 floor typical + Roof)

Duties and Responsibilities

Responsible for level marking for Formwork and concrete pouring.

Managing all Manpower Labors, Steel Fixers, and Shuttering Labors.

Preparing Labour Contractor Bills and Bar Bending Schedule.

Coordinating with Store team for Requisitions of materials.

Writing daily progress report and forwarding to the Site Engineer.

Responsible for execution of Structure work (Sub Structure & Super structure)

Academic Qualification: -

Bachelors of Technology B-Tech (Civil)

From Indus University Karachi [Degree Attested from UAE]

Key Skills: -

Some of my key technical skills include, but are not limited to;

Full command in preparation of Tenders

Full command on preparation of Interim Payment Certificates (IPC) for all types of projects.

Experienced in preparation of Re Bar Schedules.

Excellent working knowledge of POMI, CEMM3, SMM7 and CSI

Excellent knowledge and experienced in preparation of Variations & Claims

UAE work experience in payments, tendering, rate Analysis & cost control.

Worked experienced on Dubai Municipality & CMW Projects.

Cash flow Statements and Payments logs

FIDIC (Red Book 99 & 87 4th Edition)

Post tender negotiations

Computer Skills: -

MS Office (Excel, Word)

Auto Cad 2d.

Plan Swift

Power Point

Coins

Languages: -

English (Fluent), Arabic (Basic), Urdu (Native)

Personal Information: -

Date of Birth……….08/12/1991 (27 Years)

Visa Status…………...Employment

Nationality…………. Pakistani

Marital Status…………. Single

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download