Construction Site Best Management Practice (BMP) Field ...

State of California Department of Transportation

Construction Site Best Management Practice

(BMP) Field Manual

and Troubleshooting Guide

January 2003

CTSW-RT-02-007

Construction Site BMPs Field Manual and Troubleshooting Guide

TABLE OF CONTENTS

PART I: INTRODUCTION............................................................ 1

Principles of Erosion and Sediment Control .................................. 2 Common Pollutants on the Construction Site................................. 4 Monitoring and Inspection Program............................................... 6

PART II: PROJECT OPERATIONS AND BMPS ...................... 12

PART III: BMP IMPLEMENTATION AND TROUBLESHOOTING ................................................ 17

TEMPORARY SOIL STABILIZATION ....................................... 17 SS-2 Preservation of Existing Vegetation............................... 17 SS-3 Hydraulic Mulch ............................................................ 19 SS-4 Hydroseeding ................................................................. 22 SS-5 Soil Binders.................................................................... 25 SS-6 Straw Mulch................................................................... 28 SS-7 Geotextiles, Plastic Covers, Erosion Control Blankets & Mats................................................................................ 30 SS-8 Wood Mulching ............................................................. 34 SS-9 Earth Dikes, Drainage Swales & Ditches....................... 36 SS-10 Outlet Protection/Velocity Dissipation Devices............. 39 SS-11 Slope Drains................................................................... 41

TEMPORARY SEDIMENT CONTROL ....................................... 43 SC-1 Silt Fence........................................................................ 43 SC-2 Desilting Basin ............................................................... 47 SC-3 Sediment Trap ................................................................ 49 SC-4 Check Dam..................................................................... 52 SC-5 Fiber Rolls...................................................................... 55 SC-6 Gravel Bag Berm............................................................ 58 SC-7 Street Sweeping and Vacuuming ................................... 60 SC-8 Sandbag Barrier.............................................................. 62 SC-9 Straw Bale Barrier.......................................................... 66 SC-10 Storm Drain Inlet Protection .......................................... 70

WIND EROSION CONTROL ........................................................ 73 WE-1 Wind Erosion Control .................................................... 73

TRACKING CONTROL ................................................................ 75 TC-1 Stabilized Construction Entrance/Exit ........................... 75 TC-2 Stabilized Construction Roadway .................................. 78

NON-STORM WATER MANAGEMENT .................................... 80 NS-1 Water Conservation........................................................ 80 NS-2 Dewatering Operations................................................... 82 NS-3 Paving and Grinding Operations .................................... 85 NS-4 Temporary Stream Crossing........................................... 88

i

Construction Site BMPs Field Manual and Troubleshooting Guide

NS-5 Clear Water Diversion.................................................... 91 NS-7 Potable Water/Irrigation ................................................. 94 NS-8 Vehicle and Equipment Cleaning................................... 96 NS-9 Vehicle and Equipment Fueling ..................................... 98 NS-10 Vehicle and Equipment Maintenance........................... 101 NS-11 Pile Driving Operations................................................ 103 NS-12 Concrete Curing ........................................................... 105 NS-13 Material and Equipment Use on Water ........................ 107 NS-14 Concrete Finishing ....................................................... 109 NS-15 Structure Demolition/removal Over or Adjacent to Water111 NS-16 Temporary Batch Plants ............................................... 113 NS-17 Streambank Stabilization.............................................. 115 WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL................................................................................ 117 WM-1 Material Delivery and Storage...................................... 117 WM-2 Material Use ................................................................. 120 WM-3 Stockpile Management ................................................. 122 WM-4 Spill Prevention and Control ........................................ 124 WM-5 Solid Waste Management............................................. 127 WM-6 Hazardous Waste Management .................................... 130 WM-7 Contaminated Soil Management .................................. 133 WM-8 Concrete Waste Management....................................... 135 WM-9 Sanitary/Septic Waste Management............................. 138 WM-10 Liquid Waste Management .......................................... 140

Table 1

LIST OF TABLES Storm Water BMPs for Construction Operations............. 12

ii

Introduction

PART I: INTRODUCTION

This document provides a toolbox for Caltrans field personnel to aid in proper implementation of water pollution control Best Management Practices (BMPs) on the construction site. The document is organized into the following parts: ? Part I: Introduction briefly presents (1) the principles of

erosion and sediment control, (2) common storm water pollutants on the construction site, and (3) guidelines for implementing a proper monitoring and inspection program for the construction site, including the use of the Storm Water Pollution Prevention Plan (SWPPP) or Water Pollution Control Program (WPCP) to ensure an effective water pollution control program. ? Part II: Project Operations and BMPs identifies typical water pollution control challenges for specific construction operations and the BMPs that are available to meet those challenges. ? Part III: BMP Implementation and Troubleshooting provides guidance for installing, maintaining and troubleshooting selected BMPs from the Caltrans Storm Water Quality Handbooks, Construction Site BMPs Manual.