SECTION 16060

FAULT CURRENT AND DURATION . The earthing system design calculation by the Contractor shall be based on earth fault withstand current shown in DEWA General Design Criteria Standard 1.1.0.0.0.01. The estimated maximum duration of the fault current shall not be less than 5.0 seconds for the 11kV system. EARTH ELECTRODE SYSTEM DESIGN ................
................