2020 DOS 1 Standard Tender of Service (STOS)

Two additional tension bands shall be applied girth-wise, parallel to the base, around the four sides of the lift vans, one band positioned approximately one-fourth (1/4) the distance from the top. Wood cleats, tie blocks, or braces are to be used under tension banding when necessary to ensure stability or to bridge unsupported spans. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download