A/E Submission Instructions - RFP Design Build Projects

a. The design period and provisions for Government reviews; b. A list of drawings to be included with each design submittal for VA reviews; and. c. A phasing plan for coordination of interruptions to the utility service due to relocation site utility work. 2. Construction Period: a. Mobilization; b. Demolition method and sequencing; c ... ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download