Roadwatch September 3, 2020 - September 9, 2020



-598170-624840 Lee CountyDepartment of Transportation1500 Monroe StreetFort Myers, FL 33901(239) 533-8580 (239) 485-8520 FaxRoadwatch UpdateSeptember 3 – September 9, 2020 Alico Road, west of Three Oaks Parkway (ROW2019-00749):? Clary’s Sitework & Development, Inc. will be doing median paving, on Alico Road just west of Three Oaks Parkway in Fort Myers, on Monday, August 31, through Friday, September 4, 2020, from 9 a.m. to 3:30 p.m. Acme Barricades will supply MOT (maintenance of traffic). For further information, please call Jeff Clary at 239-770-3659.Alico Road, from Capri Drive to Oriole Road, Fort Myers (ROW2020-00503): Southern Underground Installations will be performing directional drilling on the south side of Alico Road going east for approximately 4,700 feet beginning Monday, August 31, 2020. MasTec will be installing conduit and setting concrete feeder splice boxes along the roadway shoulder from Monday, September 14, 2020, through Monday, October 19, 2020. Motorists should use caution, as there will be flagmen (Scotts Safety LLC) and single lane closures in the work zone from approximately 9:00 AM to 3:00 PM on specified dates. For further information, please call Pedro Rebollida from MasTec at 954-439-6885 or Wayne Roberts from MasTec at 239-345-0614.Alico Road eastbound from Jean Street to Capri Drive (ROW2020-00325): Southern Underground Installations will be performing directional drilling on the south side of Alico Road going east for approximately 4,496 feet beginning Monday, August 17, 2020. MasTec will be setting concrete feeder splice boxes along the roadway shoulder from Monday, August 31, 2020, through September 28, 2020. Motorists should use caution, as there will be flagmen and temporary lane closures in the work zone from approximately 9:00 AM to 3:00 PM on the specified dates. For further questions, please call Pedro Rebollida from MasTec at 954-439-6885 or Wayne Roberts from MasTec at 239-345-0614.Ben Hill Griffin Parkway and South Village Boulevard (ROW2020-00122): Highway Safety Devices (Miromar Development Corporation, FGCU) will be installing a new traffic signal along with milling and resurfacing the roadways of north and southbound Ben Hill Griffin Parkway and westbound South Village Blvd. Work will begin on Thursday, July 23, through Sunday, September 27, 2020. There will be intermittent lane closures beginning Thursday, August 27 through September 27, 2020, from 9 a.m. to 3:30 p.m. Motorists are advised to use caution in the work area. The contractor will provide certified crews to assist with maintenance of traffic (MOT). For further information, please contact Mike Monahan at 813-478-3038 and Scott Via at 239-229-5360.Buckingham Road at SR 82 (ROW2019-00848): Lee Mar Building and Construction Corp. will be installing drainage improvements, east and west turn lanes on the northeast corner of Buckingham Road and SR 82. The project will start on Friday, September 18, 2020 and completed in November 2020. Motorists are urged to use caution in the work zone, as there will be lane closures and lane shifts from 9 a.m. to 3:30 p.m. Bob’s Barricades will provide MOT (maintenance of traffic). For further information, please contact James Thompson, at Lee Mar, 239-481-2613 or Jimmy@LeeMar.US. Cape Coral Parkway at Del Prado Boulevard – Cape Coral (ROW2020-00573): Signs by Crannie and ACRA Electric will be refurbishing the existing Veteran’s monument within the median on Cape Coral Parkway, east of Del Prado Boulevard, beginning at 6 p.m. Thursday, September 24, 2020 until 6 a.m. Friday, September 25, 2020. The inside (left) westbound and eastbound lanes on Cape Coral Parkway east to Del Prado Boulevard, and the southbound inside left turn lane on Del Prado Boulevard, north of SE 47th Terrace, will be closed overnight. Lane closures will reopen at 6 A.M. on Friday September 25, 2020. For further information, please contact William Corbett, City of Cape Coral, at 239-574-0425.Del Prado Boulevard, Cape Coral: A contractor will begin milling and paving Del Prado Blvd between Viscaya Pkwy and Hancock Bridge Pkwy starting Sunday, September 20, through Thursday, September 24, 2020, from 7:00 p.m. to 6:00 a.m. Motorists should use caution, as there will be lane closures and uneven pavement in this area. Please be aware of signage in this area. Weather my affect start times and dates. For further information, please contact Dirk Danley?239-533-9305.Hanson Street Extension, Phase II from Veronica S. Shoemaker Boulevard to Ortiz Avenue September 3, 2020: The City of Fort Myers is building the second phase of the Hanson Street Extension from west of Veronica S. Shoemaker Boulevard to Ortiz Avenue. The project includes building new roadway, installing new sanitarty sewer force main and potable and reclaim water mains. The Hanson Street Extension project also includes six-foot sidewalks, seven-foot bike lanes, and two roundabouts. One roundabout will be located at the Hanson Street and Veronica S. Shoemaker Boulevard intersection and another will be located at the Hanson Street Extension and Ortiz Avenue intersection. The project is anticipated to be completed at the end of 2020. ORTIZ AVENUE lane shift: Two lanes of traffic are currently maintained on the west side of the Ortiz Avenue future roundabout with one lane in each direction. Friday, September 4th and Saturday, September 5th, crews are scheduled to prepare for and shift traffic on Ortiz Avenue north of Vince Smith Drive. Two lanes of traffic will be maintained on the EAST side of the Ortiz Avenue future roundabout with one lane in each direction. Nighttime/overnight work is expected and motorists should expect delays. Motorists should expect speed limit reduced to 20 mph through the Ortiz Avenue future roundabout during the traffic shift. Ortiz Avenue north of Vince Smith Drive The multiuse path on the west side of Ortiz Avenue is open. Crews have installed a temporary diversion around the construction. This schedule may be subject to change due to inclement weather and unforeseen underground conditions.? Motorists, pedestrians and bicyclists should use extreme caution. For further questions, please contact Cella Molnar & Associates by calling 239-337-1071 or email thayden@.Joel Blvd at David Avenue, Lehigh Acres (ROW2020-00438): Gulf Coast Site, Inc. and HJB Construction will be performing a roadway open cut for an FGUA owned/maintained water main tap beginning Tuesday, September 8, 2020 through Tuesday, September 15, 2020. Work will include asphalt pavement full depth replacement, milling and resurfacing, and right-of-way backfilling/sod improvements. The outside (right) lane of SW bound traffic on Joel Blvd just after David Avenue will be subject to lane closures. MOT (maintenance of traffic) will be placed in accordance with FDOT standard index 102-613. Periodic lane closures for the SW bound lane will occur between the hours of 9:00 a.m. and 3:30 p.m. on weekdays. For further information, please contact Christine Myers of Gulf Coast Site, Inc. at 239-274-9516. Shaddelee Lane between Dean Street and McGregor Blvd., Fort Myers (ROW2020-00410): American Pipeline Construction, LLC, will be installing a new drainage system beginning Monday, September 7, 2020 and continue through Wednesday, September 30, 2020. Work will include installing drainage structures, pipe culverts, concrete sidewalk, and a new swale. Shaddelee Lane will be closed for through traffic, local traffic only will be allowed. The work hours will be from 8 am to 4pm. For further information, please contact Carlos Belliard at (305) 490-8154 or cbelliard@american-. SR 80/Palm Beach Blvd., Fort Myers: The Florida Department of Transportation and Ajax Paving Industries of Florida, LLC, will be installing new drainage pipes and pipe connections to drainage structures along the eastbound side of SR 80/Palm Beach Blvd. at Morse Plaza/Lexington Avenue. Construction will start Tuesday, September 1, 2020 and be completed by early to mid-September, weather permitting. Motorists are urged to use caution in the construction zone and expect delays. The right lane on SR 80 eastbound will be closed during construction and other lane closures will occur. Construction costs are estimated at $107,500. For more information, please contact: Brian Bollas, FDOT, at 813-262-8549 or email Brian.Bollas@dot.state.fl.us; or Zac Burch, FDOT, at 239-225-1950, email Zachary.Burch@dot.state.fl.us. Stringfellow Road, Pine Island (from the four-way stop, south to St. James City Bridge): A contractor for the Lee County Department of Transportation will be starting a sidewalk/bike path repair project along Stringfellow Road in Pine Island on Monday, September 7, 2020. Villa Fuerte Construction will make repairs on 7.25 miles during the next two months. Motorists should use caution, as there will be intermittent lane closures throughout the day. Signs and flaggers will be on-site. For more information, contact Joey Wilson @ 239-533-9400. Street Lighting Maintenance: On Tuesday, September 15, 2020 through Friday, September 18, 2020,?Lee County DOT Traffic will be performing street lighting maintenance on College Parkway/Cape Coral Parkway from FSW Parkway/Whiskey Creek Drive to Del Prado Boulevard.?Motorists should use caution, as there will be intermittent lane closures in the eastbound and westbound lanes?from 9 a.m. to 4 p.m.?For further information, please contact Ryan Kirsch at?239-896-8074.Striping Maintenance:? Lee County DOT will be performing a moving operation with traffic delays on 9-3-20 through 9-9-20 between the hours of 9:00 a.m. to 4:00 p.m. (weather permitting) on the following roadways:Alabama RoadNobel Ave SBell BlvdOwen Ave SColumbus BlvdParkdale BlvdEisenhower BlvdQuaker LaneHomestead RoadRay Ave SJaguar BlvdSentinela BlvdLeonard BlvdWestgate BlvdMilwaukee Blvd23rd St SWNimitz Blvd40th St SWIntersection Markings: Intermittent lane closures and delays are possible on 9-3-20 through 9-9-20 between the hours of 9:00 a.m. to 4:00 p.m. (weather permitting) on the following roadways: Colonial Blvd (McGregor Blvd – US 41)Fowler StreetBonita Beach RoadFor further information, please call Randy Hart at 239-533-9500.Traffic Signal Maintenance: Wednesday, September 9, 2020: Lee County DOT will be working on the signal at the intersection of Martin Luther King Jr. Blvd and Cranford Avenue from 9 a.m. to 3 p.m. Motorists are urged to use caution, as the signal will be dark. The Fort Myers Police Department will provide traffic control. For further information, please contact Efrain Cruz at 239-533-9500.Treeline Avenue: Lee County DOT will be performing ditch maintenance on Treeline Avenue beginning Tuesday, September 15 and should be completed by Friday, September 18, 2020. The work will begin each morning at 9:00 am and will cease by 4:00 pm. There will be a lane closure and Lee County DOT will have flaggers to help control traffic. If you have any questions, please contact Gary Slusar at 239-533-9400.Lehigh Acres Road Paving Projects – Updated May 28, 2020:ROADTOFROMHOFFMAN STHiggins Ave Hollycrest StKELSEY ST Heyburn St Laurelwood DrKELSEY ST Hester Ave Stratton Rd 72ND ST WUnice Ave N E EOP 71ST ST WSally Ave N W EOP 72ND ST WRuth Ave N E EOP 69TH ST WSally Ave N Ruth Ave N SARA AVE N62nd St W 67th St W KEMPER ST Laurelwood Dr Stratton Rd LACOTA AveLa Rue StKinney StLARUE STJoplin Ave Langdon Ave VERA AVE N 61st St WS EOP SALLY AVE N61st St W S EOP LAURA AVE N61st St W S EOP 67TH ST W Joan Ave N E EOP BETH AVE N 61st St WS EOP ANITA AVE N61st St W S EOP DORA AVE N 59th St W N EOP FLORA AVE N59th St W N EOP JUDY AVE N59th St W N EOP NORA AVE N59th St W N EOPOLIVE AVE N 59th St W N EOP SARA AVE N51st St W53rd St WJOAN AVE N47th St W S EOP HANNA AVE N47th St W S EOP GENE AVE N51st St W53rd St WELAINE AVE N51st St W53rd St WELAINE AVE N47th St W S EOP ANITA AVE N47th St W S EOP WINGFORD DRGreenbriar Blvd Windermere Dr JANICE AVEREDMONT AVEQUINTERO LNRYE ST Sargent StJanice Ave SARGENT STQUINTERO LNQUINTERO LNWESCOTT QUINTERO LNJANICE AVVERONICA AVEQUINTERO LNJANICE AVRICHLAND AVEWINDERMERE DRREDMONT AVETANAGER AVEWINDERMERE DRRICHLAND AVEVEINNA STREDMONT AVEROSCOE STROSCOE STREDMONT AVERICHLAND AVETUXFORD AVEVANETTA DRWILLOWBROOK DRYOAKUM ST Nestle Ave Nutmeg St NUTMEG STRichmond Ave NVerney StWOODBURN DRRichmond Ave Greenbriar Blvd LATONA STOcean Park DrWoodburn DrOCEAN PARK DR Lorna Ave Latona StTOWNSENDWoodburnE EOPPROSPECT AVE W 17th W 18th JUDY AVE N34th St WN EOPHENRY AVE W 13th St W 14th StW 9th STAnnWilliamsCONNIE AVE NDora Ct 16th St W ELVA PL5th St W Connie Ave N DORA CT5th St W Connie Ave N JOAN AVE NLee Blvd 16th St W SUNSET RDCedar Ave N Sunniland Blvd CARL AVE Brookfield St Berryman St CARL AVE Banning St Beauty St BURR STAlbert Ave Abrams Blvd ALVIN AVE Lee Blvd Buckingham Rd SARA AVE S8th St SW 16th St SW GERALD AVE8th St E12th St E SHELDON AVEE 9th St E 10th St 8 th MooreJoelE 6TH STLakeview Dr Hines Ave OASIS CTCentennial BlvdEOPCHALET AVE SManhattan St E Kingsbury St EDURION CIRS EOPParkdale Blvd BENTLY ST EJoponica Ave SBell Blvd COLYER ST EAnaconda Ave SBell Blvd DEMOREST AVE S Colyer St EJaguar BlvdFOX TRAIL CTAnaconda Ave SE EOP KNAPP ST Homestead Rd Foxchase FOXTAIL ST EBell Blvd Joponica Ave SFOXDALE AVENimitz Blvd Garnet Ave HATTON AVE SMeadow RdDeauville St EBANCROFT AVECandlelight DrColridge StCELLINI ST EColumbus Blvd Naples Ave SCAPRI ST ESanta Lucia Ave SColumbus BlvdSANTA LUCIA AVE S Bari St EAntonio St EMILANO AVE S Antonia St EIsabella St The contractor will begin paving on Friday, May 29, 2020, weather permitting. For further information, please call Dirk Danley or Jeremy Norvell at 239-533-9305 or 533-9300 or email paving@Road Work/Maintenance/Improvements:Alico Road Widening from Ben Hill Griffin Parkway to west of Airport Haul Road - Construction Project: This project consists of widening Alico Road to four lanes. The project also includes medians and multi-use paths.Lee County Department of Transportation urges bicyclists to avoid Alico Road between Ben Hill Griffin Parkway and Airport Haul Road.? This is an active construction site with limited shoulders and should be avoided for safety purposes.Expect large vehicles entering and exiting Alico Road. Motorists should use caution in the area.Expect intermittent lane closures at the intersection of Alico Road and Ben Hill Griffin Parkway.The contractor is Tomahawk Construction. The project cost is $18 million. The project is expected to be completed by late spring 2021. For further questions, please contact Kris Cella at 239-337-1071.Alico Road, northbound from Corkscrew Road to the entrance of the Water Treatment Plant (ROW2018-00015): MasTec (FPL) will be pulling cable and restoring sod along the roadway shoulder from Monday, August 3, 2020 through Monday, September 30, 2020. Motorists should use caution, as there will be flagmen and temporary lane closures in the work zone from approximately 9:00 AM to 3:00 PM on the specified dates. For further questions, please call Nick Scheckler from MasTec at (239) 339-7558.Arroyal Road, Bonita Springs (ROW2020-00297): MasTec and ADS will be replacing underground electric feeder cable. Work will be performed on the south side of Corkscrew Road beginning Thursday, July 23 through Thursday, September 17, 2020, from 9 a.m. to 3:30 p.m. Motorists are advised to use caution in the work area. Maintenance of traffic will be provided by J. Scott, of Scotts Safety. For further information, please contact Pedro Rebollida at 954-439-6885 or Wayne Roberts at 239-345-0614.Beacon Manor Drive: Lee County DOT along with a contractor will be making improvements on Beacon Manor Drive (between US 41 and Danley Drive). Utility, drainage and sidewalk work will be included in the project. Work is expected to start on February 3, 2020 and be completed by October, 2020. During construction, motorists should be prepared to stop and expect delays when work is active. Also, during beginning phases of the project, the dedicated right turn at US 41 will not be accessible. Drivers and pedestrians should use extra caution in this area. For further questions, please call Alex Slaibe at 239-533-8141.Colonial Boulevard - Midpoint Bridge Approach Repairs:?On Sunday, August 30, 2020, Lee County DOT will be performing bridge maintenance on Colonial Boulevard between McGregor Boulevard and the Midpoint Bridge on the Fort Myers side. Motorists are urged to use caution, as there will be lane closures starting at 7:00 PM until 4:30 AM. For further information, please call Avelino Cancel at 239-533-9416.Corkscrew Road eastbound from I75 to 600 feet east of Stoneybrook Golf Blvd. (ROW2020-00317): Southern Underground Installation will be performing directional drilling on the side of Corkscrew Road going east for approximately 3,000 feet. MasTec will be setting concrete feeder splice boxes along the roadway shoulder from Wednesday, August 26, 2020 through October 21, 2020. Motorists should use caution, as there will be flagmen and temporary lane closures in the work zone from approximately 9:00 a.m. to 3:00 p.m. on the specified dates. For further information, please call Pedro Rebollida from MasTec at 954-439-6885 or Wayne Roberts from MasTec at 239-345-0614.Corkscrew Road, westbound from Alico Road to Corkscrew Woods Pkwy (ROW2018-00015): MasTec (FPL) will be pulling cable and restoring sod along the roadway shoulder from Monday, August 3, 2020 through Monday, September 30, 2020. Motorists should use caution, as there will be flagmen and temporary lane closures in the work zone from approximately 9:00 AM to 3:00 PM on the specified dates. For further questions, please call Nick Scheckler from MasTec at (239) 339-7558.Corkscrew Road between Fire House Lane and Wildblue Blvd (ROW2020-00294): FLA SOL will be directional drilling and installing 6-inch conduit for system expansion. MasTec will then be installing concrete splice boxes along the way from Friday, August 21, 2020, through Thursday, November 19, 2020. Motorists should use caution, as there will be temporary lane closures in the work zone from approximately 9:00 AM to 3:30 PM on the specified dates. For further questions, please call Wayne Roberts from MasTec at 239-345-0614.Corkscrew Road, between Stoneybrook Gulf Blvd and Stoneybrook Gulf Drive (ROW2020-00277, ROW2020-00279, ROW2020-00287): MasTec will be installing two new switch cabinets and underground feeder cable for FPL. Work will be performed on the south side of Corkscrew Road beginning Monday, July 20 through Wednesday, September 30, 2020, from 9 a.m. to 3:30 p.m. Motorists are advised to use caution in the work area. Maintenance of traffic will be provided by J. Scott, of Scotts Safety. For further information, please contact Pedro Rebollida at 954-439-6885 or Wayne Roberts at 239-345-0614.Corkscrew Road and Wildblue Blvd (ROW2020-00267): FLA SOL will be directional drilling and installing 6-inch conduit for system expansion. MasTec will then be installing switch cabinets beginning on Monday, August 17, 2020, through Friday, November 13, 2020. Motorists should use caution, as there will be temporary lane closures in the work zone from approximately 9:00 AM to 3:30 PM on the specified dates. For further questions, please call Wayne Roberts from MasTec at 239-345-0614.Corkscrew Road between Wildblue Blvd and Midnight Blue Ct. (ROW2020-00316): FLA SOL will be directional drilling and installing 6-inch conduit for System Expansion. MasTec will then be installing concrete splice boxes along the way from Wednesday, August 19, 2020, through Thursday, November 11, 2020. Motorists should use caution, as there will be temporary lane closures in the work zone from approximately 9:00 AM to 3:30 PM on the specified dates. For further questions, please call Wayne Roberts from MasTec at 239-345-0614.Corkscrew Road at the sub-station access road (ROW2020-00307): FLA SOL will be directional drilling and installing 6-inch conduit for system expansion. MasTec will then be installing concrete splice boxes along the way from Monday, August 17, 2020, through Friday, October 16, 2020. Motorists should use caution, as there will be temporary lane closures in the work zone from approximately 9:00 AM to 3:30 PM on the specified dates. For further questions, please call Wayne Roberts from MasTec at 239-345-0614.Del Prado Blvd.: A contractor will begin ADA, sidewalk, and median improvements on Del Prado Blvd between Viscaya and Hancock Bridge Pkwy beginning?Monday, August 17, 2020 thru September 20, 2020 from 9:00 am. to 4:00 pm. There will also be some nighttime work during this project from 7:00 pm thru 6:00 am. Motorists should use caution, as there will be lane closures in this area. Please be aware of signage in this area. Weather my affect start times and dates. For further information, please contact Dirk Danley 239-533-9305.Enterprise Parkway at Luckett Road – Fort Myers (ROW2020-00466): Caloosa Site Development, Inc. will be performing roadway and sidewalk improvements beginning Tuesday, July 14, 2020 and continuing through September 30, 2020. Asphalt pavement, concrete sidewalk, concrete curbing, and drainage improvements will be performed. The work will encompass the northbound lane of traffic immediately after the turn from Luckett Road. Lane closures are not anticipated, but motorists are encouraged to exercise caution in this area, as trucks and construction vehicles will be exiting the area with regularity. For further information, please contact Dustin Tanner at (239) 332‐4008 or dustin@. Traffic Control Products of Florida will provide maintenance of traffic services (239) 334-2525.Lee County RWA – September 2, 2020 Estero Boulevard Construction – reFRESH Estero Boulevard/Waterlines – Strandview Avenue to the south end of the island.Contractors for Fort Myers Beach and Lee County are installing new water main, and sanitary sewer force main, storm drainage, sidewalk and rebuilding roadway on Estero Boulevard from Strandview Avenue to the south end of the Island.? Motorists may experience daytime and nighttime intermittent one-lane traffic on Estero Boulevard. Flaggers will alternate traffic frequently, but motorists should expect delays. Motorists may experience momentary delays while crews move materials for the construction activities. Crews are expected to work Monday through Friday and most Saturdays. Publix to Lazy Way – Motorists can expect lane closures for repair and restoration.Lazy Way to north of Aberdeen Avenue – Southbound traffic is shifted to the center lane while crews work on the beach side. North of Aberdeen Avenue to Flamingo Street - The center lane is closed for storm drain installation. Barrels separate the northbound and southbound lanes. Motorists should expect to make U-turns when accessing properties on the opposite side of the road from the travel lane. Motorists exiting side streets and driveways from north of Aberdeen Avenue to Flamingo Street must make right turns onto Estero Boulevard and then make a U-turn.Flamingo Street to Albatross Street - North and southbound traffic is shifted to the bay side while crews work on the beach side.Albatross Street to north of Bay Beach LaneNorth and southbound traffic is shifted to the beach side while crews work on the bay side. Through September 4, 2020, motorists may experience one-lane traffic on Estero Boulevard between Santini Plaza and Bay Beach Lane. Flaggers will alternate traffic frequently, but motorists should expect delays.North of Bay Beach Lane to the south end of the island - North and south bound traffic is shifted to the bay side. This schedule may be subject to change due to inclement weather and unforeseen underground conditions. For further questions, please contact Cella Molnar & Associates at 239-337-1071.Iona Road: A contractor will begin milling and paving Iona Road between Thornton Road and McGregor Blvd on Thursday, August 20, 2020, from 7:00 p.m. to 6:00 a.m. Motorists should use caution, as there will be lane closures and uneven pavement in this area. Please be aware of signage in this area. Weather may affect start times and dates. For further information, please contact Dirk Danley 239-533-9305.Littleton Road – Kismet Parkway Realignment: Construction Project:The project realigns the Littleton Road/Kismet Parkway intersection at NE 24th Avenue and adds a roundabout at the intersection of Littleton and Corbett Roads. The contractor will also add bike lanes, sidewalks, intersection lighting, and drainage improvements. ? During the daytime hours through September, motorists should expect the inside, eastbound lane of Kismet Parkway closed from NE 23rd Place to NE 24th Avenue for crews to build the left turn lane to north NE 24th Avenue.The contractor also continues work on the new roadway.? The roundabout at the intersection of Littleton Road/Corbett Road is expected to partially open to traffic in September.? Work activities may be adjusted due to unforeseen underground conditions or weather conditions.? Estimated completion is end of 2020. Project cost is approximately $2 million. The contractor is Thompkins Contracting, Inc. For further questions, please visit or contact Jennifer Dorning at 239-338-7723.SR 82 from Alabama Road?to the Lee/Hendry County Line:? Florida Department of Transportation Construction Project: Crews will be widening SR 82 to four lanes from Alabama Road to the Lee/Hendry County line.?Motorists should expect intermittent eastbound and westbound lane closures on?SR 82 during daytime and nighttime/overnight hours from 9 a.m. to 4 p.m. and from 7 p.m. to 6 a.m., Monday through Friday throughout the duration of the project, weather permitting.??Motorists should expect a traffic shift on SR 82 from Grant Boulevard to Jaguar Boulevard. Motorists will be shifted to the north, with one lane of traffic in each direction. Motorists should follow detour signs and use caution as crews work in the roadway.? ?Motorists should expect Columbus Boulevard closed. ?Additional work includes construction of a median separating two 12-foot travel lanes in each direction, 6.5-foot inside paved shoulders, bike lanes, a 5-foot sidewalk on the north side, and a 10-foot shared-use path on the south side. The project will also add a grass median and LED lighting throughout this segment. The expected completion date is end of 2020. The Contractor is Sacyr Construction.?For further questions, contact Lisa Macias, Cella Molnar & Associates, at 239-337-1071.Pine Island Road, Pine Island: Cabana Construction will be installing water line pipe on Pine Island Road between Nikkis Lane and Betsy Parkway. Starting on Thursday, May 28, 2020, there will be intermittent lane closures between the hours of 9 a.m. to 3 p.m. Cabana Construction will provide maintenance of traffic (MOT) to control traffic and lane closures. Motorists should use caution in the work zone area. Work is expected to be completed by November 28, 2020. For further information, please contact Kenneth Cabana at 239-980-9405.Plantation Road and Penzance Boulevard: PowerTown Line Construction will be removingand installing poles for FPL on the east side of Plantation Road, from Penzance Blvd. northto Idlewild Street; also on the south side of Penzance Blvd, from Plantation Road Eastto Six Mile Cypress. Work began Monday, June 29, 2020, and will run through September 25, 2020. Crews will work daily from 9 am to 3:30 pm. Scott’s Safety will supply MOT (maintenance of traffic). For further information, contact Richard Messner at 813-955-1976.US 41/Cleveland Avenue from Winkler Avenue to SR 82/Dr. Martin Luther King Jr. Boulevard: Construction Project: Crews will be?installing and relocating utilities and constructing medians on US 41/Cleveland Avenue from Winkler Avenue to SR 82.?Motorists should expect Hanson Street closed on the west side of US 41/Cleveland Avenue.?Motorists should expect Hanson Street as a right-in/right-out only travel pattern on the east side of US 41/Cleveland Avenue.?Motorists should expect Linhart Avenue closed on the west side of US 41/Cleveland Avenue.??Motorists should expect intermittent northbound and southbound lane closures and detours on US 41/Cleveland Avenue during daytime and nighttime/overnight hours Monday through Friday throughout the duration of the project, weather permitting.?Motorists should expect side road closures from Winkler Avenue to Victoria Avenue throughout the duration of the project.??Additional work includes installing drainage structures, pedestrian signals, upgrading signals and lighting, and resurfacing existing highway. The project will be constructed in three segments.? Each segment will have the majority of construction completed prior to moving to the next segment. Construction will begin on the first segment from Winkler Avenue to Carrell Road. Crews will work on the west side of the road initially and when that work is completed, they will shift to the east side of Cleveland Avenue/US 41. ?The expected project completion date is the summer 2022. The Contractor is Ajax Paving Industries of Florida, LLC.For additional information, contact the Public Information Consultant for the project, Kris Cella, at 239-337-1071 or kcella@. Summerlin Road: Lee County DOT Operations will be performing handrail and canal maintenance on Summerlin Road between Pine Ridge Road and Summer Ridge Lane. The job is scheduled to start Monday, August 24, 2020, and finish by Thursday, September 17, 2020, weather permitting. There will be right turn lane closures onto Summer Ridge Lane from 8:30 am to 4 pm. If you have any questions, please call Carlos Hernandez at 239-533-9429.Three Oaks Pkwy (ROW2019-00205): Haskins, Inc. will be performing an open cut drainage installation on Three Oaks Parkway. Work will begin on Wednesday, August 12, 2020 and be completed by Friday, September 4, 2020. Motorists should use caution, as there will be intermittent lane closures while crews work during the day from 9 AM to 3:30 PM and work at night on August 27, from 7 PM to 6 AM. Acme Barricades will provide MOT (maintenance of traffic). For further information, please call Ben Elwell at 239-289-3629.West Mariana Ave., North Fort Myers: Lee County DOT will be making drainage improvements and adding sidewalk on?West Mariana Ave. between N. Tamiami Trail and Piney Road. Construction is expected to begin on Monday, August 31, 2020, and be completed by the end of 2020. The project will include intermittent daytime lane closures (9am-4pm) within the referenced area. Motorists, as well as pedestrians, should use extra caution in this area during construction. For additional questions or concerns, please contact DJ Padgett at 239-826-6342.Winkler Road Sidewalk Project: Lee County DOT along with Denco Construction will be making improvements on Winkler Road between College Parkway and McGregor Boulevard. Work will include water main replacement, drainage improvements and a new sidewalk along the east side of Winkler. The project is expected to begin on Monday, February 24, 2020 and be completed by December 2020. After April 12, 2020, daytime lane closures will be in effect from 9 a.m. to 4 p.m. This will be a flagging operation in the work zone. Drivers and pedestrians should use extra caution while traveling through this area.For further questions or concerns, please call DJ Padgett, Lee County DOT, at 239-533-9300.??LandscapingBoca Grande: Lee County DOT will be trimming palms and trees on Gilchrist Ave. and other side streets in Boca Grande. Intermittent lane closures may exist and motorists should use caution as workers and equipment will be present. Work is scheduled for the week beginning Monday, August 24, 2020 and should be completed by Friday, September 4, 2020. For further information, please call Bob DeBrock at 239-533-9425.Bridge MaintenanceAlva Bridge #120042, 17240 Broadway St., Alva:?Lee County DOT Operations will be performing bridge maintenance at the Alva Bridge on Broadway St. The job is scheduled to start Monday, August 31, and finish September 3, 2020, weather permitting. There will be lane closings controlled by a flagging operation, from 8:00 am until 4pm. For further information, please call Carlos Hernandez at 239-533-9429.Matlacha Park Bridge Maintenance: Starting on Monday, August 24, 2020, a contractor for the Lee County Department of Transportation will be performing maintenance work on the small timber bridge at the entrance to Matlacha Community Park. The maintenance activities will be completed by Thursday, September 3, and the park will reopen to the public at its regular time on Friday, September 4, 2020.? For further information, please contact Avelino Cancel at 239-533-9416. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download