Posting 2/9/09



Posting 2/9/09

FPL-NED has requested outages on the 394 and 363 transmission lines due to planned switchrod replacement at the Seabrook Substation. The 363 line outage is currently scheduled to start in late March 2009, and the 394 line outage is currently scheduled to start in early May 2009. The duration of each outage is 13 days. FPL-NED is currently evaluating the impact of this outage schedule due to reliability matters identified by the ISO-NE. FPL-NED may consider alternate outage dates, and will post any changes to the outage schedule.

Posting 2/18/09

FPL-NED had previously requested outages on the 394 and 363 transmission lines due to planned switchrod replacement at the Seabrook Substation. The 363 line outage was scheduled to start in late March 2009, and the 394 line outage was scheduled to start in early May 2009. FPL-NED, after consultation with ISO-NE, will cancel both of these requested outages. FPL-NED will reschedule the planned work at future time to be determined.

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download

To fulfill the demand for quickly locating and searching documents.

It is intelligent file search solution for home and business.

Literature Lottery

Related searches