ERCOT Operating Guides
The test starts at time t0 when the frequency Dead-Band is exceeded. 4. The MW output signal should be recorded at least every two seconds. 5. The duration of the test is 100 seconds. After 100 seconds, the offset signal should be removed and the IRR should return to pretest power output. 6. The test should be conducted both with positive and ... ................
................