SECTION 26 32 00 - DOA Home

All Fire Pump control conductors installed between fire pump controller/ transfer switch and the emergency generator shall be installed per NEC 695.14(F). The consultant shall review the grounding requirements of the proposed system. Review the use of 3 or 4 pole transfer switches and . type. of system; separately derived system or connected as ... ................
................