Concrete Pump Pre-Mobilisation Checklist



-26035000CONCRETE PUMP PRE-MOBILISATION CHECKLIST CHECKLIST Vehicle InformationAsset No. / Registration No.Asset descriptionPump SMU (hrs/M2)Truck SMU (hrs/m2)Project nameDate of reading Contractor/supplierManufacturer/Model Is the machine classified as a road-going ‘heavy vehicle’ for the purposes of heavy vehicle laws?If you answered ‘Yes’ to this question please inform project person responsible for logistics.Yes ? No ?PART A – Laing O’Rourke Minimum Requirements for PlantOwner / SupplierLaing O’RourkeYESNOApprovedAll operator controls return to neutral and are clearly marked???Fire extinguisher (class ABE), minimum 4.5kg and tested and tagged within 6 months. Date: ???Lockable battery isolation switch with identification decal???Emergency stop button/s that immediately stop all movements and pumps c/w identification decal.???Guarding (lockable door and/or limit switch and/or guarding over parts)???Wheel chocks with carrying mounts (for rubber tyred equipment)???Dunnage in good condition and code compliant (Min width 200mm x thickness 75mm).???Earth Safety chain available (for placing boom)???Safe access (three points of contact)???Safety decal in place: “Warning do not stand on grates”???Safety decal in place: “Warning Never allow hands near the concrete valve. Stop the engine / motor & realise accumulator pressure (where fitted) before cleaning / servicing concrete valve assembly”???Safety decal in place: “Danger: do not operate unless: within 1m of the fixed controls”???Safety decal in place: “Caution: concrete placing boom not to be used as a crane”???Safety decal in place: “Danger beware of overhead electrical hazards”???Air compressor pressure relief valve within test date (if applicable)???Air receiver within test date (if applicable)???Hopper grating must be interlocked (agitator cannot be put in motion unless the grating is in the fully closed).???Concrete hopper grating bars no greater than 75mm apart ???Concrete hopper grating bars 100mm (at least) from the top surface of the grating to any moving part.???All pipeline segments are clearly identified with a permanently fixed unique identification mark or number???Pipe clamps have locking pins such as R-type or equivalent. ???End hose secured by a safety chain, sling or other retaining device (when connected to a boom)???Hold Point: Confirm Project specific / Client addition requirementsSignature:???PART B – Condition of Plant & EquipmentOwner / SupplierLaing O’RourkeYESNOApprovedGeneral cleanliness inside and out is acceptable ???Free from damage (list in comments)???Braking and steering system functional???Exhaust system in good condition???Free of visible oil / water leaks???Check hydraulic and fuel system hoses and fittings for wear or damage???Tyres in good condition and within wear limits???The plant or equipment has been inspected prior to arrival at the workplace ???Plant/Equipment is free from any weeds or seeds:???PART C – Compliance Documentation for Plant (either in paper form or electronic) (available at the time of mobilisation)Owner / SupplierLaing O’RourkeYESNOApprovedOperators Manual specific to make and model: truck, pump and pump motor???Plant Risk Assessment specific to make and model???Daily Pre-start book specific to plant type & concrete pump log book (or combined book)???Maintenance history (minimum of 3 months records)???Major Service Records; annual and six-yearly???Change management documents available for any modifications???Worksafe Plant registration of item and design registration (truck mounted concrete placing boom)???Single wall pipes: monthly line thickness test results (pipe log book shall record wall thickness and pressure details) ???Double wall pipes: testing as per OEM recommendations (normally metres pumped)Hold Point: Confirm Project specific / Client addition requirementsSignature:???Comments: For items ticked No give reason in the comments section belowNotes on minimum requirements exceptions; list additional included asset or serial numbers; any further information:Pre-mobilisation declaration (Equipment owner / supplier)Date of final report:Hours / Km at final report: Ignition, toolbox and panel keys present with machine?Yes ?No ?I declare that this machine is in a safe condition, is free from defect and is fit for purpose:Name: Position: Signature:Date:Signed and accepted by project:Name: Position: Signature:Date: ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download