BILL OF QUANTITIES AND PRICE SCHEDULES
|ITEM |DESCRIPTION OF EQUIPMENT/SERVICES/WORKS |QTY |UNIT PRICE (RM) |TOTAL PRICE |
|NOS. | | | |(RM) |
| | | | | |
|1.0 |DESIGN WORKS | | | |
| | | | | |
|1.1 |A complete BQ detailing the scope of works, materials and pricing to | | | |
| |reflect the DESIGN, PRELIMINARY, CONSTRUCTION, MAKE GOOD and OTHERS. |L.Sum | | |
| | | | | |
| |(Note : Regulatory contribution fees if required, shall be borne by MIMOS)| | | |
| | | | | |
| | | | | |
| |Structural design, testing, load calculation and preparation of | | | |
|1.2 |engineering drawings for the structures, foundation, floor slabs, | | | |
| |mechanical and electrical works. The drawings certified by the approved |L.Sum | | |
| |Professional Engineer (PE) shall be made available in the form of softcopy| | | |
| |and 2 sets in the hardcopies. | | | |
| | | | | |
| |To prepare a set of BQ detailing the design works and finishes as | | | |
| |specified by the clients | | | |
|1.3 | |L.Sum | | |
| |PRELIMINARIES | | | |
| | | | | |
|2.0 |Protection of existing finishes to all areas affected and making good of | | | |
| |defects to the damages existing structure, Clearing and cleaning to all | | | |
|2.1 |areas before execution of the work and upon completion including | | | |
| |transportation. Temporary Facilities & Services for works, Safe Access, |L.Sum | | |
| |Project Sign board and Hoarding Board. | | | |
| | | | | |
| |Investigate necessary existing data and information relevant to the | | | |
| |project such as soil investigation, general layout, existing column and | | | |
| |structures and everything necessary to undertake the job. | | | |
| | | | | |
| |Provision for the Bank Guarantee as Performance Bond, Public Liability | | | |
| |Insurance and Workman Compensation insurance. | | | |
| | | | | |
| | | | | |
| |CONSTRUCTION WORKS | | | |
| | | | | |
| |Supply of tools, materials, labours, equipment, machineries, professional | | | |
| |supervision and everything else required for proper execution of the works| | | |
| |and NOT limited to the following: | | | |
|3.0 | | | | |
| |Earthwork and flooring: Able to withstand normal working load of min | | | |
|3.1 |5kN/m2, with approved type carpet and tile finishes. | | | |
| | | | | |
| |Structural & wall: Mixture of brickwall and aluminium frame with glass | | | |
| |panel. | | | |
| | | | | |
| |Metal trusses & roofing: Universal beam and MS metal structure to blend |L.Sum | | |
| |the existing design with kiplock metal roof, c/w heat insulation. | | | |
| | | | | |
| | | | | |
| | |L.Sum | | |
| |Suspended ceiling: 2x4 ceiling board and required accessories. | | | |
| | | | | |
| | |L.Sum | | |
| |Electrical works : | | | |
| |Incoming supply from the nearest riser and split into separate power, air | | | |
| |conditioning and lighting DBs. Power supply for the office cubicles and | | | |
| |equipment. Lighting set using a 2 x 4 x 3Watt in a metal casing c/w | | | |
| |reflector and diffuser. | | | |
| | |L.Sum | | |
| |Mechanical : | | | |
| |ACPU with 1.5 times the design capacity c/w ductworks of return and supply| | | |
| |ducts and all the necessary wiring and plumbing works. | | | |
| |Sprinkler system : Main distribution pipe c/w upright and pendent |L.Sum | | |
| |sprinkler heads, approved by BOMBA. | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | |L.Sum | | |
| | | | | |
| | | | | |
| |TOTAL COST FOR ITEM NOS (1.0 + 2.0 + 3.0) |- | | |
-----------------------
[pic]
1 CONFIDENTIAL
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- motivation and compulsive hoarding treatment
- hud what is hoarding
- hoarding and squalor tool 8 1 environmental cleanliness
- bill of quantities and price schedules
- self neglect and hoarding strategy and guidance
- ashbourne volunteer bureau
- 2020 hoarding application islington
- hoarding workshop report230318 kent housing group
- hoarding kent housing group
Related searches
- physical quantities and their units
- physical quantities and measurements
- quantities and units of measurement
- quantities and units answers
- derived quantities and units
- quantities and units physics
- physical quantities and units pdf
- physical quantities and measurement chapter
- us constitution and bill of rights pdf
- the constitution and the bill of rights
- bill of rights and amendments
- constitution and bill of rights