Proposal For Life Skill Center



Proposal Life Skill Center

Sioux Reservation Wanblee, SD

Phase I

Objective:

To train Native American young adults in life skills to enable them to enter the work force. These skills range from Carpentry, Plumbing, Welding, Auto mechanics, and Computer skills. Trainers would come for a week at a time. Trainers would be given lodging and meals. Individual from the MAPS organization or retired personnel would do the majority of the training. To start this program a training facility is needed. Pastor Gus Craven AG Missionary to the Sioux has a steel building located on the Glory Ranch. A training 16’ x 32’ room needs to be constructed within this building.

Construction:

I have a contractor John Lee who is willing to design and supervise the construction of this room. John will purchase all materials at Home Depot in Canon City CO. He receives a discount plus there is no tax on the materials.

I am requesting FCF personnel to assist in the fund raising and provide the labor along with local Native Americans for this project. The project would be completed on one weekend in the spring or summer of 2018.

Day 1 Pick up Materials start on floor layout

Day 2 Floor construction 2” x 10” x 10’ support beams and 2” x 8” x 8' joists 24” on center covered with ¾” 4’ X 8’ sheets of OSB.

Walls and door installation: 2” x 4” x 92 5/8” 16” on center walls with drywall sheets plus a single 36” door and frame.

Material List:

2” x 4” x 12’ top studs 24 $6.10 $146.40

2” x 4” x 92 5/8” 96 $3.02 $289.92

2” x 6” x 8’ 1 $6.93 $6.93

2” x 8” x 8’ 48 $8.02 $384.96

2” x 8” Hangers 96 $1.17 $112.32

2” x 10” x 12’ Pressure Treated 11 $20.77 $228.47

2” x 10” x 8’ Pressure Treated 2 $12.88 $25.76

2” x 4” x 8’ Pressure Treated 6 $3.02 $18.12

¾” T.G. OSB 4’ x 8’ 16 $25.08 $401.28

4’ x 8’ ½ OSB 1 $16.75 $16.75

½” 4’ x 8’ Sheetrock 12 $10.47 $125.64

36” Door 1 $59.60 $59.60

Locking Door Handle 1 $33.87 $33.87

Miscellaneous Hardware $81.54

Total Material Cost includes contractor discounts and zero tax $1,931.56

Funding:

Each FCF Section will present the need to Churches within there Section. Checks will be made out to Bridge to Life Assembly and Sioux Missions in the Memo. A separate account will be established. Once all funds are received the dates for the Mission trip will be set.

Denver Metro North $276 Denver Metro South $276

Northern Section $276 Pikes Peak $276

Southern $276 Utah $276

Western Slops $276

Bridge to Life Assembly

222N Orchard Ave

Canon City, CO 81212

Tel: 1-719-275-1035

More Information Contact:

Bob Rylander 719-276-8448 barcoderwr@

Joe Rock 719-963-4096 joe@

[pic]

[pic]

The Life Skill Center 16’ x 32’ will be located within a Pole Barn on the Glory Ranch. Note polls are spaced at 8’ with 3 polls on the back wall and 5 on the side wall.

[pic]

Native American children working on Rockets on our last FCF mission trip.

Phase II: Will be scheduled for 2019 which will consist of: Install the electrical outlets, insulation on outer walls and drywall. Install ceiling supports, drywall and lighting. ($1,225 or 175 per Section) Extra funds received for Phase I will go towards Phase

II

Phase II Estimates

Inner Walls

4 x 8 x ½ sheets drywall 36 $9.98 $359.28

Installation R-13 15” x 32’ Rolls 9 17.43 $156.87

AC Outlets 12 2.99 $35.88

Wire and accessories $200 $200

Ceiling

8’ support post 3 58.97 $176.91

2”x 8” support beams 2 per section 8 $8.13 $65.04

Hangers 2”x4” 60 $.56 $33.60

2” x 4” cross supports 30 $3.20 $96

Shop Fluorescent Lights (2) 3 $33.72 $101.16

Total $1,224.74 $175 per Section

-----------------------

32‘

16’

2” x 8” walls

on all 4 sides

Existing wall

Floor Joists

Door

Drywall

2x4 framing

Support Beams

Support Beam tied to polls

................
................