STATEMENT OF QUALIFICATIONS

If the project was a combination renovation and building addition, include area of building addition in parentheses after the total area (e.g.: 35,000 SF Add.). Include the project cost at the bottom followed by the firm’s performance in parenthesis (e.g.: $100K under budget, $15K returned, on budget, $10K over budget, etc). If the firm ... ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download