Lead Safety for Remodeling, Repair, and Painting

Apr 21, 2011 · Remove window/door at location indicated on the Bid Document. Frame opening and finish both sides of wall to match existing surfaces. Work shall include drywall installation including tape, bed, texture and paint. Exterior finish shall include sheathing, siding and paint to match existing. Insulate exterior wall to R-13. ................
................