Relocate staircase to match widened bridge in same general location

CAROUSEL DR

Caras Park

END BRIDGE DECK

BANK ST

Maintain existing stairs

New ADA route to Caras Park (separate project)

Extend existing land bents to the west to support wider bridge deck

Support shared-use path over the river with cantilevered structure

Replace and widen bridge deck to the west to improve accommodations for bicycles and pedestrians

Remove staircase

East Caras Park

Riverfront Trail North

Remove raised center median and maintain 4 lanes of traffic

Clark Fork River

No in-water work or modification to existing river piers

Bess Reed Park

Extent of Fiber Reinforced Polymer (FRP) sidewalk

Staircase to remain

S. 3rd St. intersection improvements

STATION DR

Evelyn B. Johnson Park

S 3RD ST W

BEGIN BRIDGE DECK

Riverfront Trail

Missoula Irrigation Ditch

Begin Project

Toole Park

GERALD AVE S HIGGINS AVE

MYRTLE ST

DATE: 3/30/2018

1 in = 50 ft

0

Feet

100

DATA SOURCES: MDT, Missoula County IMAGERY: ? 2018 Microsoft Corporation ? 2018 DigitalGlobe ?CNES (2018) Distribution Airbus DS

S 4TH ST W

PROJECS T5THLSOTCATION MAP AND MAJOR DESIGN ELEMENTS

HIGGINS AVE. BR REHAB-MISSOULA