Template for Reporting Adverse Events

Some problems were encountered with the delivery while clearing customs. As a result, CE had to build some temporary portable toilets. Initially we were going to lease the portable toilets, but the contractor wanted to get rid of the toilets so he made us an offer to buy the toilets at his cost, which was cheaper than the cost of leasing. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download