South Georgia College

_____ Concrete Overlay (variable thickness) shall be the volume in cubic yards (cubic meters) measured as the difference between the total volume (as indicated by the batch quantity tickets for the ready-mix trucks (MSC or SDC) or meter printout for (LMC)) of overlay placed and accepted, less the calculated volume of the overlay (plan specified ... ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download