RFP FOR AM FOR Telemedicine SYSTEMS
Request for Proposal (RFP)
On
Annual Maintenance Contract (AMC) of
Tele-Medicine nodes located countrywide
3
4
1
2
3
4
5 April, 2018
DEVELOPMENT AND EDUCATIONAL COMMUNICATION UNIT
INDIAN SPACE RESEARCH ORGANISATION
AHMEDABAD
Table of Content
Description Page Nos.
1.0 Introduction 3
2.0 List of items at TM nodes 3
3.0 Scope of work 3
3.12 Preventive Maintenance 5
3.13 Breakdown Maintenance 6
4.0 Terms & Conditions 6
Annexure-I: List of Items to be taken under AMC 11
(Doctor Node and Patient Node)
Annexure-II: Section – A: Price bid format for AMC 15
Section – B Price bid format for Spares & Services
Section – C Price bid format for optional items
Annexure-III: Nodes Assessment Report for TM node 19
Annexure-IV: Certificate of Re Commissioning of Telemedicine Node 21
Annexure-V: Tele-Medicine Service Provider 23
Annexure-VI: Technical specifications 25
|Sl. No |Description |Compliance (YES/NO/Noted) |Remarks |
| |Introduction | | |
| |ISRO Telemedicine (TM) project was started in Year 2001. ISRO Telemedicine | | |
| |program bridges the gap between Super Specialty services available in urban | | |
| |areas and remote/under-served areas by connecting them through an Indian | | |
| |National Satellite. These also include hilly regions like Jammu & Kashmir, | | |
| |North East, Uttarakhand etc. and offshore islands of Andaman & Nicobar, | | |
| |Lakshadweep. | | |
| |A typical ISRO's satellite-based Telemedicine network uses Client/Server | | |
| |network configuration, which consists of TM server, Patient Node and Super | | |
| |Specialty (SS) Doctor node hereinafter called Doctor Node. A TM node typically | | |
| |consists of Tele-medicine software integrated with computer hardware along with| | |
| |medical diagnostic instruments (at Patient node only) connected through VSAT | | |
| |network in star configuration. | | |
| |The objective of this RFP is to get the quotations from vendors for AMC of TM | | |
| |nodes located across the country. | | |
|2.0 |List of items at TM nodes | | |
|2.1 |The Tele-medicine nodes are basically VSAT based systems with TM Hardware / | | |
| |Software including diagnostic equipment/peripherals. | | |
|2.2 |ISRO TM network is having three types of TM nodes, as mentioned below: | | |
| |Super Specialist Doctor Node (Here in after called Doctor Node) | | |
| |Patient Node (Fixed) | | |
| |Patient Node (Mobile) | | |
|3.0 |Scope of Work | | |
|3.1 |Vendor to undertake AMC of around 140 TM nodes. These 140 TM nodes comprise of | | |
| |around 40 Doctor nodes, 98 Fixed Patient nodes & 02 Mobile Patient nodes | | |
| |located across country. | | |
| |These numbers are tentative and the final numbers along with list of TM nodes | | |
| |will be given at the time of release of Purchase Order. | | |
| |The details of TM nodes items is given in Section-A, Section-B & Section-C of | | |
| |Annexure-1 | | |
|3.2 |Following spares to support the AMC shall be arranged by DECU, ISRO | | |
| |VSAT Modem DVB-S/S2 or DVB-S2A | | |
| |Ext. C-Band 2W BUC | | |
| |Ext. C-Band PLL type LNBC | | |
| | | | |
| |Vendor to collect spares mentioned as above, from DECU/ISRO in lots of 10 | | |
| |quantities of each item, with their own transport arrangement. | | |
| |Vendor to ensure safety and transportation of material/spares provided by DECU,| | |
| |ISRO. | | |
|3.3 |After the acceptance of the Purchase Order, Vendor to visit sites and verify | | |
| |that the node is fully functional. | | |
| |Vendor shall also test TM node with TM software/CME software, by carrying out | | |
| |functional test with DECU, ISRO or TM Hub. | | |
| |Vendor to install new CME software and test and train the Users if specifically| | |
| |given go ahead by DECU/ISRO. | | |
| |However, in case TM node has problem, vendor to rectify & make the TM node | | |
| |operational as per the approach described in Sr. No. 3.4, of this table and | | |
| |then take the TM node under AMC. | | |
|3.4 |If any of the items of the TM node are found faulty at the time of taking the | | |
| |node under AMC, following approach shall be adopted: | | |
| |Attempt on-site minor repairs. | | |
| |If items for which DECU ISRO is providing spares, the faulty items to be | | |
| |replaced. | | |
| |For faulty items listed in the table 1.0 under Section-D of Annexure-I, these | | |
| |should be replaced as detailed in the same table. | | |
| |For other faulty items vendor should replace them with new items, as listed in | | |
| |table 2.0 under Section-D of Annexure-I. | | |
| | | | |
| |For activities in c) and d) above, vendor should obtain specific go ahead from | | |
| |DECU prior to replacement. Further, after replacement, vendor should obtain | | |
| |item replacement certificate signed by the User and must submit the same to | | |
| |DECU, along with the AMC invoice. | | |
|3.5 |Vendor may be required to provide remote technical support to | | |
| |configure/re-configure TM nodes, as and when required. | | |
|3.6 |Vendor shall carry out Preventive Maintenance Inspection (PMI) twice in a year | | |
| |(total 4 PMI visit in two years). Activities during PMI to be carried out are | | |
| |as per the section 3.12 of the RFP. Vendor to carryout second PMI during 2nd | | |
| |or 3rd quarter of the AMC. | | |
|3.7 |Vendor shall carry out Breakdown maintenance as and when required. Activities | | |
| |to be carried out during breakdown maintenance are as per the section 3.13 of | | |
| |the RFP. | | |
|3.8 |Vendor should take care of maintenance of minor civil work (if any) and other | | |
| |activities like Channeling, cable dressing, etc. during PMI/Breakdown visit. | | |
|3.9 |Vendor to record each maintenance activity in the maintenance report clearly | | |
| |mentioning the replaced item if any. Maintenance report shall be submitted to | | |
| |in-charge TM node with copy to DECU, ISRO on quarterly basis. | | |
|3.10 |Vendor shall coordinate with TM node in-charge as well as DECU, ISRO for | | |
| |activities related to AMC. | | |
|3.11 |After maintenance activity, vendor to submit certificate of satisfactory | | |
| |performance of systems, duly signed by the TM node in-charge to DECU, ISRO. | | |
| |Format of certificate is given in Annexure-IV. | | |
|3.12 |Preventive Maintenance Activities | | |
|3.12.1 |Vendor shall carry out Preventive maintenance twice in a year | | |
|3.12.2 |The first visit of the Vendor for taking a TM node under AMC shall be accounted| | |
| |as first PMI visit. | | |
|3.12.3 |Vendor to carryout second PMI visit during 2nd or 3rd Qtr. of AMC. | | |
|3.12.4 |Equipment cleaning by using blower, cleaning fluids (external surfaces). | | |
|3.12.5 |Checking of all cables and connections & repair/replace damaged/ loose cables. | | |
|3.12.6 |Checking of all parameters for good connectivity & if required, reorient | | |
| |Antenna System for optimum signal reception. | | |
|3.12.7 |Note all important technical parameters. | | |
|3.12.8 |Check all the screws and fasteners of the VSAT systems. Apply grease on moving | | |
| |parts, wherever required. | | |
|3.12.9 |Functional test of Patient End TM Node to be carried out with Doctor Node or | | |
| |DECU, ISRO or TM Hub. Vendor to submit the snap shot (print screen) of | | |
| |functional test of each TM node along with PMI report. | | |
|3.12.10 |Hardware and software including OS (Including Tele-medicine software and | | |
| |diagnostic equipment) should be checked and software patches to be installed, | | |
| |if required. | | |
|3.12.11 |Vendor should ensure that the Virus protection is enabled and updated. | | |
|3.12.12 |Vendor shall carry out maintenance of UPS along with batteries . | | |
|3.12.13 |PMI maintenance records to be recorded and should be submitted to DECU, ISRO on| | |
| |Quarterly basis. | | |
|3.13 |Breakdown Maintenance Activities | | |
|3.13.1 |Breakdown maintenance to be carried out as and when required after the formal | | |
| |complaint is registered with the vendor. | | |
|3.13.2 |Vendor shall carry out repairs/replacement of faulty items, after obtaining go | | |
| |ahead from DECU, ISRO. | | |
| |On carrying out satisfactory breakdown maintenance and after ensuring that the | | |
| |items/systems are functional, vendor will have to obtain certification from the| | |
| |TM node in-charge. Vendor to log details of such repairs/replacements in the | | |
| |maintenance report. | | |
|4.0 |Terms & Conditions | | |
|4.1 |Guidelines for bid preparation and submission | | |
|4.1.1 |It is a two-part tender. Bidder should submit these through EGPS. | | |
|4.1.2 |Part 1 is techno-commercial and should mention compliance/ not compliance/ | | |
| |Noted, with remarks if any against each clause of this RFP. This part should | | |
| |not contain prices. | | |
|4.1.3 |Part-2 is the price bid, to be submitted as per format in Annexure-II | | |
|4.1.4 |Though TM nodes have minor variations in terms of antenna sizes & few | | |
| |peripherals, vendor should quote as indicated in price bid format only. | | |
|4.1.5 |Vendor should also quote for the optional items, which may or may not be | | |
| |ordered. | | |
| |The bid shall still be considered even though vendor is not able to quote for | | |
| |any of the optional items. | | |
|4.1.6 |Validity of bids should be minimum 120 days from the date of submission of | | |
| |bids. | | |
|4.1.7 |Vendor may attend Pre-Bid meeting, as per the time and date intimated by | | |
| |purchaser. | | |
|4.1.8 |The RFP may be modified through a corrigendum, consequent to the Pre-Bid | | |
| |meeting. | | |
|4.2 |Price bids of the technically compliant vendors shall only be opened and PO | | |
| |shall be placed on the lowest (L1) bidder. The evaluation of L1 shall be done | | |
| |as per the price bid submitted in Section-A & Section-B of Annexure-II. | | |
|4.3 |Vendor to provide the compliance to each clause, section and annexures of the | | |
| |RFP and should provide the data sheets, make and model of spare items. | | |
| |Technical specifications of major spares are mentioned in Annexure-VI. | | |
|4.4 |Period of the PO: Initially the PO shall be placed for two years with effect | | |
| |from the date of acceptance of P.O. and extendable for one more year, if both | | |
| |parties mutually agree. | | |
|4.5 |Vendor eligibility Criterion | | |
|4.5.1 |It is mandatory that the Vendor must have field experience in maintenance/ | | |
| |establishment of ISRO Telemedicine/ Tele-Education networks of M/s Viasat OEM. | | |
| |Vendor to submit documentary proof of experience. | | |
|4.5.2 |Vendor to submit letter of support from M/s Televital Pvt. Ltd. for back to | | |
| |back technical support during currency of AMC. Address is mentioned in | | |
| |Annexure-V. | | |
|4.6 |Other Terms and conditions | | |
|4.6.1 |Vendor to submit Performance Security equivalent to 10% of PO value along | | |
| |with the order acknowledgement. Besides performance of the contract, this shall| | |
| |also cover the requirement of Security deposit for the items collected from | | |
| |DECU, ISRO. | | |
|4.6.2 |The Performance Security shall be returned to the vendor after two months from | | |
| |date of successful completion of contract and depositing of unused/faulty | | |
| |spares to DECU, ISRO if any. | | |
|4.6.3 |Wherever necessary DECU, ISRO may arrange “To whom so ever concern certificate”| | |
| |on DECU, ISRO authorization letter for smooth movement of | | |
| |materials/spares/items related to AMC activities | | |
|4.6.4 |Vendor should take all TM nodes under AMC within two months of acceptance of | | |
| |PO. | | |
|4.6.5 |If any TM node is not made functional due to reason attributed to the User or | | |
| |the Purchaser, Vendor shall be entitled for a visit charge. This shall only be | | |
| |claimed, once there is clarity that the said TM node shall not be taken under | | |
| |AMC. | | |
|4.6.6 |The AMC completion date will be same for all the TM nodes.If there is a delay | | |
| |in taking any TM nodes under AMC beyond two months of PO, the AMC period of | | |
| |that TM node will be reduced accordingly. The start of AMC of such nodes shall | | |
| |be first day of the month in which it is taken under AMC. Payment for such | | |
| |nodes shall be reduced on pro-rata monthly basis. | | |
|4.6.7 |Fault reported is to be attended and TM node to be made operational within | | |
| |following duration from the date of complaint registration: | | |
| |Within 10 working days for accessible sites | | |
| |Within 15 working days for inaccessible sites | | |
| |Within 20 working days for Island sites | | |
|4.6.8 |TM nodes may be added or deleted at the time of placing of P.O., or during | | |
| |execution of the P.O. on pro-rata monthly basis. | | |
|4.6.9 |Vendor to submit Preventive Maintenance certificate of each node along with | | |
| |the AMC invoice to DECU, ISRO. | | |
|4.6.10 |Vendor to take all the TM nodes under AMC irrespective of region/area. Without | | |
| |which offers will not be considered. | | |
|4.6.11 |On completion of AMC contract, vendor shall be required to give the status | | |
| |report of all the TM nodes clearly mentioning the following: | | |
| |Number of operational TM nodes | | |
| |Number of complaints not resolved & reasons. | | |
| |Number of non-operational TM nodes & reasons. | | |
|4.6.12 |After completion of AMC contract, vendor to deliver remaining spare items (if | | |
| |any) to DECU through SAC, stores, by raising the separate invoice. Last quarter| | |
| |payment will be released only after successfully deposit of spares, faulty | | |
| |items and status report. | | |
| |Vendors are advised to procure spare items judiciously in lots as, on | | |
| |completion of AMC, DECU/ISRO shall not take back spare items more than 50% of | | |
| |quantities indicated in Section-B of Annexure-II. | | |
|4.6.13 |Vendor to make own arrangement for tools & testing instruments required for | | |
| |carrying out of AMC. | | |
|4.6.14 |Vendors shall arrange movement of manpower and transportation of spare items or| | |
| |faulty items at their own cost. | | |
|4.7 |Downtime compensation: In the event of any system or TM node found to be | | |
| |non-operational after the formal complaint is registered with the vendor and if| | |
| |TM node remain unattended and fault not rectified beyond; | | |
| |10 working days for accessible sites | | |
| |15 working days for inaccessible sites | | |
| |20 working days for Island sites | | |
| | | | |
| |penalty shall be charged at the rate as follows: | | |
| | | | |
| |1.0 % of the quarterly value of AMC of respective faulty nodes/day. | | |
|4.8 |Vendor to provide Helpdesk with toll free helpline number/fax/email address, so| | |
| |that user/DECU, ISRO at each Telemedicine node will be able to register their | | |
| |complaints. | | |
|4.9 |Bills certification: Contract manager identified by DECU, ISRO will be the | | |
| |focal person for all coordination activities related to AMC. All the AMC bills | | |
| |shall be certified by TM node nodal officer/in-charge, which will then be duly | | |
| |endorsed by DECU, ISRO. The format of the certification is as per the | | |
| |Annexure-III & IV. | | |
|4.10 |Payments: Payments will be made quarterly on pro-rata basis after completion of| | |
| |service satisfactorily of each quarter. The bill in duplicate duly certified by| | |
| |the TM node nodal officer/in-charge and approved by DECU, ISRO, shall be | | |
| |submitted to Accounts Officer (Bills) SAC, Ahmedabad for payment. | | |
| | | | |
| |Last quarter payment: will be made only after successful submission of final | | |
| |report on the status of all the TM nodes under AMC. | | |
| |Payment of spares shall be paid to the vendor only after submission of “New | | |
| |items replacement certificates” from users along with the invoice and endorsed | | |
| |by DECU, ISRO to Accounts Officer (Bills) SAC, Ahmedabad for payment. | | |
| | | | |
| |GST charges: As applicable | | |
|4.11 |Fall Clause: The charges for above work shall in no event exceed the lowest | | |
| |charges at which vendor services the systems/TM node of identical description | | |
| |to any other party during the currency of contract. If, at any time during the | | |
| |said period, vendor reduces the charges for similar work to any other customer,| | |
| |vendor shall forthwith notify the same to DECU,ISRO and the charges payable | | |
| |under the contract for the service shall stand correspondingly reduced. | | |
|4.12 |Termination of Contract: DECU, ISRO reserves the right to terminate the | | |
| |purchase order if the performance of the Contractor/vendor is found to be | | |
| |unsatisfactory or due to change in technology/Policy during currency of the | | |
| |contract by giving three-months’ notice in writing without any financial | | |
| |implications. | | |
|4.13 |In the unlikely event of Hub or satellite becoming non-functional, which makes | | |
| |the overall network dis-functional with no clarity of revival, the PO can be | | |
| |short closed by giving one-month notice in writing. Payment shall be made on | | |
| |pro-rata monthly basis. | | |
|4.14 |In the event of the damages to TM node property or personal injury to user due | | |
| |to the negligence of vendor’s employee/ person, responsibility shall solely | | |
| |rest on vendor. | | |
|4.15 |Indemnity Clause: DECU, ISRO is indemnified against any action, claim or | | |
| |proceedings relating to infringement of all or any of the prevailing laws like | | |
| |workman’s Compensation Act 1923, Contract Labour (Regulation and Abolition) Act| | |
| |1938, Industrial Disputes Act 1947, Employee’s State Insurance Act 1952 during | | |
| |the currency of the order or any other Act specifically not mentioned. | | |
| |DECU, ISRO shall not be responsible and is indemnified against any claim for | | |
| |any injury or loss of life to Vendor’s personnel deployed for the work under | | |
| |this Purchase Order. DECU, ISRO shall also be indemnified against any claim due| | |
| |to loss/breakdown of Vendors equipment, deployed during the currency of the | | |
| |contract. | | |
|4.16 |Non-Disclosure Agreement (NDA) | | |
| |Vendor & Personnel deputed by the vendor shall maintain absolute secrecy and | | |
| |security of the information for the purpose of operation of this Contract given| | |
| |by Purchaser. Vendor shall return the original and copies of the same to | | |
| |Purchaser after completion of the work. The technical information / papers / | | |
| |drawings etc. provided by Purchaser from time to time, will be for the | | |
| |execution of this Contract only; and should not be used / copied / reproduced /| | |
| |published in any form or disclosed to third party, by the vendor or his | | |
| |personnel. Vendor will be responsible for any violation or infringement of NDA | | |
| |by him or his personnel. Such violation shall be treated as breach of Contract | | |
| |and vendor shall be liable for penalties for breach as provided for in the | | |
| |Contract in addition to any other legal implications w.r.t. the laws of the | | |
| |land. | | |
Annexure-I:
Section-A: List of items at Doctor TM Node
|Sr. No. |Description of Item |
|1 |1.8m or 3.8m Ext-C Band Antenna with Feed and mount assembly. |
|2 |Ext. C-Band PLL type LNBC |
|3 |Ext. C-Band 2W or 5W BUC |
|4 |VSAT modem (RCST) – Make- ViaSat, Model- Linkstar |
|5 |IFL cables (set of 2 cables) RG6 or RG11 |
|6 |PC with monitor, operating system, speakers, mouse and keyboard, etc. |
|7 |Doctor End TM software |
|8 |Videoconferencing system |
|8.1 |Standalone (Sony/Polycom) or |
|8.2 |PC Based (through Osprey card) or |
|8.3 |Web camera- USB type Integrated with PC and used with TM software |
|9 |LMS Software for CME (presently TrainNet) |
|10 |1 KVA UPS with 3 Nos.12V 100 AH SMF batteries |
|11 |Earthing |
|12 |Miscellaneous items (LAN switch, power board, etc.) |
Section-B: List of items at Patient End TM Node
|Sr. No |Description of Item |
|1 |1.8m or 3.8 Antenna system with Ext. C-Band feed and mount assembly. |
|2 |Ext. C-Band PLL type LNBC |
|3 |Ext. C-Band 2W or 5W BUC |
|4 |VSAT modem (RCST) – Make- ViaSat, Model- Linkstar |
|5 |IFL cables (set of 2 cables) |
|6 |PC with monitor, operating system, speakers, mouse and keyboard, etc. |
|7 |Patient node TM software |
|8 |LMS Software for CME |
|9.1 |Web camera- USB type Integrated with PC and used with TM software or |
|9.2 |PC Based (through Osprey card) |
|10 |12 Lead ECG machine, Make- Schiller (With connecting leads, clamps and balloons) |
|11 |A3 size X-ray scanner |
|12 |Printer |
|13 |1 KVA UPS with 3 Nos.12Volt 100 AH SMF batteries |
|14 |Earthing |
|15 |Miscellaneous items (LAN switch, power board, etc.) |
Section-C: List of items at Mobile Patient End TM Node
The mobile Patient End TM nodes have all the items identical to Fixed Patient End TM node except 1.8m Ext-C Band, fully automatic antenna system (Make COMSAT), with auto deployable mechanism, BTR & Antenna Control Unit (ACU).
Section-D
Table-1.0: Faulty Items to be replaced with alternate item
|Sr. No. |Item Description (Existing) |Replacement Item (New) |
|1 |3.8m or 1.8 m Antenna |1.8m Antenna |
|2 |A3 Size X-ray scanner |Digital camera and X-ray view box |
|3 |Standalone/PTZ camera based videoconference system |HD web camera (USB based) |
|4 |Video capture card - Osprey card |Both Osprey card and Handycam should be replaced by HD web |
| | |camera (USB based) |
|5 |3 Nos. of 100AH Lead acid SMF batteries |3 Nos. of 65AH Lead acid SMF batteries |
|6 |TV |21” PC monitor |
|7 |Colour Inkjet printer |To be replaced by Multifunctional B/W laser printer |
Table-2.0: list of new Items to be used as spares for replacement of faulty items
|Sl. No. |Item description |
|1 |Doctor End/Patient End PC with Approx. 24” LED Color Monitor, Multimedia Ampli-speakers set, mouse, keyboard,Windows10, etc.|
|2 |IFL cables-Set (Tx & RX), Type RG-6/RG-11 |
|3 |HD web camera with mounting assembly compatible to windows 7 and windows 10. |
|4 |Antivirus software with Two-year license |
|5 |Handheld wired mic + 10m XLR cable for Microphone with phantom power supply unit |
|6 |21” LED PC monitor |
|7 |Multifunctional B/W laser printer |
|8 |16 MP digital camera with 10X optical zoom with 32 GB memory card Digital still camera with tripod. |
|9 |A3 size X-ray view box |
|10 |12 lead ECG machine Make: Schiller, Model: Samvid with lead, balloon and clamp sets. |
|11 |1KVA UPS with output power factor-0.8 or better of standard make |
|12 |UPS high current charger |
|13 |3 Nos. 12V, 65 AH SMF Batteries for UPS |
|14 |Keyboard and mouse set |
|15 |8 port Ethernet Switch |
|16 |5 Mtr. Ethernet cable with RJ-45 connector |
|17 |RCA Video cable for Sony Handycam and Sony PTZ camera |
|18 |Power Ext. Board (three 5A sockets,one 15A socket with fuse and On/OFF switch) |
|19 |12 lead ECG Accessories (Clamps, Balloons, Leads etc), Make-Schiller. |
|20 |Wi-Fi router, Data rate supported- 100Mbps, 4 LAN and 1 WAN Port, etc. |
|21 |Computer Ampli-speakers with 16W power output or better |
Annexure-II
Section-A: Price bid format for AMC
|Sr. No. |Description |Unit Price |Taxes etc. |Indicative Qty for |Total |
| |(Items for L1 Evaluation) |(per year) | |L1 evaluation |(For 2 years) |
| | | | | |(A + B) * C*2 |
| | | (A) |(B) |(C) | |
|1 |TM Nodes | | |140 | |
|2 |Additional Site visit charges | | | | |
|2.1 |Accessible | | |30 | |
|2.2 |in-accessible | | |20 | |
|2.3 |Island | | |5 | |
|SUBTOTAL (A) | |
Note:
Sites located in J&K, NER, far flung areas of Uttarakhand etc. shall be counted as in-accessible, sites located at Lakshadweep and A&N are to counted as Island and other sites are to be counted as accessible sites.
Annexure-II
Section-B: Price bid format for Spares:
|Sr. No. |Description |Unit Price |Taxes etc. |Indicative Qty for |Total |
| |(Items for L1 Evaluation) | | |L1 evaluation |(A + B) * C |
| | |(A) |(B) |(C) | |
| 1 |Doctor End/Patient End PC with Approx. 24” LED Color Monitor, MM| | |25 | |
| |Ampli-speakers set, mouse, keyboard,Windows10, etc. | | | | |
|2 |IFL cables-Set (Tx & RX), Type RG-11 | | |30 | |
|3 |IFL cables-Set (Tx & RX), Type RG-6 | | |30 | |
|4 |HD web camera with mounting assembly compatible to windows 7 and | | |50 | |
| |windows 10. | | | | |
|5 |Antivirus software with Two-year license | | |140 | |
|6 |Handheld wired mic + 10m XLR cable for Microphone with phantom | | |30 | |
| |power supply unit | | | | |
|7 |21” PC monitor | | |12 | |
|8 |Multifunctional B/W laser printer | | |50 | |
|9 |16 MP digital camera with tripod. | | |50 | |
|10 |A3 size X-ray view box | | |60 | |
| 11 |12 lead ECG machine Make: Schiller, Model: Samvid with lead, | | |30 | |
| |balloon and clamp sets. | | | | |
| 12 |1KVA UPS with output power factor-0.8 or better of standard make | | |10 | |
| 13 |UPS high current charger | | |10 | |
| 14 |3 Nos. 12V, 65 AH SMF Batteries for UPS | | |20 | |
| 15 |Keyboard and mouse set | | |25 | |
| 16 |8 port Ethernet Switch | | |20 | |
| 17 |5 Mtr. Ethernet cable with RJ-45 connector | | |30 | |
| 18 |Power Ext. Board (3 5A sockets, 1 15A socket with fuse and On/OFF| | |20 | |
| |switch) | | | | |
| 19 |12 lead ECG Accessories (Clamps, Balloons, Leads etc), | | |20 | |
| |Make-Schiller. | | | | |
| 20 |Wi-Fi router, Data rate supported- 100Mbps, 4 LAN and 1 WAN Port,| | |20 | |
| |etc | | | | |
| 21 |Computer Ampli-speakers with 16W power output or better | | |20 | |
|SUBTOTAL(B) | |
NOTE: a. L1 Evaluation will be done as SUBTOTAL (A) + SUBTOTAL(B)
b. Technical specs of major items are given in Annexure-VI
Annexure-II
Section-C Price bid format for optional items:
|Sl. No. |Item description |Unit Price |Taxes etc. |
|1 |1.8m Antenna | | |
|2 |Ext. C-Band 5W BUC | | |
|3 |VSAT Modem, ViaSat, Linkstar (Compatible to ISRO, Telemedicine network | | |
|4 |AC adaptor for VSAT modem RCST Linkstar- S2A | | |
|5 |PSU for RCST (for LinkStar & LinkStar S2A) | | |
|6 |Third year license for antivirus software for 140 TM location | | |
|7 |Electrical earthing kit | | |
|8 |Wired monkey cage to avoid monkey menace for 1.8m antenna system | | |
|9 |Charges for dismantling, shifting and re-commissioning of TM nodes for the following options; |
|9.1 |Within campus | | |
|9.2 |Within city | | |
|9.3 |Within state | | |
|9.4 |Within country |
|9.4.1 |Accessible | | |
|9.4.2 |In-Accessible | | |
|9.4.3 |Island | | |
Annexure – III
Nodes Assessment Report for TM node
|1 | ISRO PO Reference | |
|2 | Name of state | |
|3 | Location & address of the TM node (with Pin | |Nodes Code |
| |Code) | | |
| | | | |
|4 |Name of the TM nodes-in-charge | |
| | | |
| |(a) Telephone (O) | |(b) Fax (O) | |
| |(c) Mobile | |(d) E-mail ID | |
|5 | Nodes Visit Date | |
|Antenna and IDU / RCST |
|Sr. No. |Description |Make / Model No. / |Status |Remarks |
| | |Sr. No. | | |
| | |(If available) | | |
|1 |1.8/3.8 m Ext-C Band Antenna | |Working / Not Working/ Not Available | |
|2 |Antenna Feed | |Working / Not Working / Not Available | |
|3 |Ext- C Band LNB | |Working / Not Working / Not Available | |
|4 |2W/5W Ext-C Band BUC | |Working / Not Working / Not Available | |
|5 |IFL Cables | |Working / Not Working / Not Available | |
|6 |Antenna earthing | |Working / Not Working / Not Available | |
|7 |IDU / RCST | |Working / Not Working / Not Available | |
|8 |RCST with Power Adaptor | |Working / Not Working / Not Available | |
| 9 | Other | | | |
|1 KVA UPS |
|Sr. No. |Description |Make / Model |Status |Remarks |
| | |/ Sr. No (If | | |
| | |available) | | |
|1 |Batteries | |Working / Not Working | |
|2 |1 KVA UPS | |Working / Not Working | |
|3 |High current charger (Built in with Battery | |Working / Not Working | |
| |Cabinet) | | | |
|4 |Battery Backup | |½ hr/4 Hrs | |
| |
|SS node /patient End TM node Peripherals |
|Sr. No. |Description |Make / Model No. |Status |Remarks |
| | |/ Sr. No. (If | | |
| | |available) | | |
|1 |Doctor End PC (CPU)/ Patient End PC (CPU) | |Working / Not Working / Not Available | |
| |with, Monitor, Keyboard, mouse and operating | | | |
| |system | | | |
|2 |Video conferencing system: | |Working / Not Working / Not Available | |
|2.1 |Standalone | |Working / Not Working / Not Available | |
|2.2 |PC based with PTZ camera with osprey card. | |Working / Not Working / Not Available | |
|2.3 |Webcam USB based | |Working / Not Working / Not Available | |
|3 |Osprey card with Osprey connector with bunch | | | |
| |of cables | | | |
|4 |VGA to PAL Card- Fitted in the PC | |Working / Not Working / Not Available | |
|5 |8 Port LAN switch | |Working / Not Working / Not Available | |
|6 |Type of TM node: | |Working / Not Working / Not Available | |
| |Doctor End software/Patient End software | | | |
| |(latest software from Televital) | | | |
| |TrainNet LMS | | | |
|7 |Antivirus | |Installed / Not Installed/working/ | |
| | | |not working | |
|8 |12 Lead ECG machine | |Working / Not Working / Not Available | |
|9 |A3 size X-ray scanner | |Working / Not Working / Not Available | |
|10 |X-ray reader box at Doctor End | |Working / Not Working / Not Available | |
|11 |Digital camera | |Working / Not Working / Not Available | |
|12 |Printer | |Working / Not Working / Not Available | |
|13 |Any other item | | | |
| |
|Measurements |
|Transmission Parameter Measurement |
|Sr. No. |Description |Result |Remarks |
|1 |BER/Eb/No | | |
|2 |Average Ping Response Time | | |
| |
|Application Testing |
|Sr. No. |Description |Result |Remarks |
|1 |Audio/Video reception at TM node from Hub |Good / Not Acceptable | |
|2 |Transfer of images between doctor End and Patient |Good / Not Acceptable | |
| |End | | |
|3 |Transfer of data between doctor End and Patient End |OK / Not OK | |
| | |
|TM node is operational |Yes / No |
|Remarks/additional information if any: |
| |
| | |
| | |
| | |
|Sign of the TM nodes-in-charge |Sign of the Vendor's Engineer |
|Name: |Name: |
|Mobile No. |Mobile No. |
|Date: |Date: |
|Seal of SIT Nodes Coordinator: |Seal of Vendor: |
| | |
Annexure-IV
Certificate of Re Commissioning of Telemedicine Node
Table 1: Nodes Details
|1 |Location & address of the Telemedicine node (In details) | |
| | | |
|2 |Type of node | |
| |(SS node/Patient End TM node) | |
|3 |Name of the TM nodes-in-charge with Contact details | |
|4 |IDU IP address | |
| |MAC address | |
| |Subnet Mask | |
|Antenna and IDU / RCST |
|Sr. No. |Description |Make / Model No. / |Status |Remarks |
| | |Sr. No. (If available) | | |
|1 |1.8/3.8 m Ext-C Band Antenna | |Working / Not Working/ Not Available | |
|2 |Antenna Feed | |Working / Not Working / Not Available | |
|3 |Ext- C Band LNB | |Working / Not Working / Not Available | |
|4 |2W/5W Ext-C Band BUC | |Working / Not Working / Not Available | |
|5 |IFL Cables | |Working / Not Working / Not Available | |
|6 |Antenna earthing Kit | |Working / Not Working / Not Available | |
|7 |IDU / RCST | |Working / Not Working / Not Available | |
|8 |RCST with Power Adaptor | |Working / Not Working / Not Available | |
| 9 | other | | | |
|1 KVA UPS |
|Sr. No. |Description |Make / Model |Status |Remarks |
| | |/ Sr. No (If available) | | |
|1 |Batteries | |Working / Not Working/ Not Available | |
|2 |1 KVA UPS | |Working / Not Working/ Not Available | |
|3 |High current charger (Built in with | |Working / Not Working/ Not Available | |
| |Battery Cabinet) | | | |
|4 |Battery Backup: ½ hr/4 Hrs | |Working / Not Working/ Not Available | |
|Doctor End /Patient End TM node Peripherals |
|Sr. No. |Description |Make / Model No. |Status |Remarks |
| | |/ Sr. No. (If available) | | |
|1 |Doctor End PC (CPU)/ Patient End PC (CPU) | |Working / Not Working / Not Available | |
| |with, Monitor, Keyboard, mouse and operating | | | |
| |system | | | |
|2 |Video conferencing system: | |Working / Not Working / Not Available | |
|2.1 |Standalone | |Working / Not Working / Not Available | |
|2.2 |PC based with PTZ camera with osprey card. | |Working / Not Working / Not Available | |
|2.3 |Webcam USB based | |Working / Not Working / Not Available | |
|3 |Osprey card with Osprey connector with bunch | |Working / Not Working / Not Available | |
| |of cables | | | |
|4 |VGA to PAL Card- Fitted in the PC | |Working / Not Working / Not Available | |
|5 |8 Port LAN switch | |Working / Not Working / Not Available | |
|6 |Type of TM node: | |Working / Not Working / Not Available | |
| |Doctor End software/patient End software | | | |
| |(latest software from Televital) | | | |
| |TrainNet LMS | | | |
|7 |Antivirus | |Installed /Working/Not working | |
|8 |12 Lead ECG machine | |Working / Not Working/ Not Available | |
|9 |A3 size X-ray Scanner | | | |
|10 |A3 size X-ray view box at Doctor End | |Working / Not Working/ Not Available | |
|11 |Printer | |Working /Not Working/ Not Available | |
|12 |Digital camera | |Working /Not Working/ Not Available | |
|13 |Any other item | |Working / Not Working / Not Available | |
| | | | | |
*Indicate in remarks if serial number is not visible/readable on the equipment
Table 3: Measurement
|Sr. No |Parameter |Specification |Measured value/Remarks |
|1 |BER for inbound carrier |≤ 0.00020 | |
|2 |Ping test |Ok / Not OK | |
|3 |Image/data transfer performance |Ok / Not OK | |
|4 |Video performance |Ok / Not OK | |
|5 |Audio performance |Ok / Not OK | |
|6 |UPS (mains battery switching) |Ok / Not OK | |
|7 |Line to Neutral Voltage |230 V ± 10% | |
|8 |Neutral to Earth Voltage |≤ 5V | |
This node is successfully re-commissioned after repair/replacement of faulty sub-systems and nodes is fully operational.
Signature of Vendor/Engineer Signature (With Stamp) of TM nodes-in-charge
Name & Designation: Name & Designation:
Mobile No. Mobile No.
Date: Date:
Annexure-V
TM Software Service Provider
1. Televital (India) Private Limited
No. 142/33, 32nd Cross, 14th Main, Jayanagar "T" Block,
Bengaluru, Karnataka - 560 011
Phone: 080-51210513 Email: info@
Website :
Annexure-VI
Technical specifications:
1. 1.8 Ext. C-Band Antenna system:
|Sr. No. |PARAMETER |SPECIFICATIONS |Compliance (YES/NO/Noted) |Remarks |
|1 |Antenna diameter |1.8m | | |
|2 |Dish Type |Single Reflector made of | | |
| | |GFRP/similar | | |
|3 |Reflector Optics |Offset focus | | |
|4 |Mount |Non Penetrating Mount (NPM), Az-El | | |
| | |with appropriate Ballast Weight | | |
|5 |Frequency band |Ext. C-band | | |
|6 |Transmit frequency |6.725 to 7.025 GHz | | |
|7 |Receive frequency |4.50 to 4.8 GHz | | |
|8 |Transmit Mid band gain |40.5 dBi | | |
|9 |Receive Mid band gain |37 dBi | | |
|10 |G/T: |18 dB/K @ 500 El Minimum | | |
|11 |Side lobe envelope |As per ITU-R 580-5 | | |
|12 |Polarization |Linear | | |
|13 |Cross polarization discrimination |Better than 25 dB | | |
|14 |Wind loading |Operational-80 km/hour | | |
| | |Survival- 160 km/hour | | |
2. Ext. C-band BUC:
|Sr. No. |Description |Parameter |Complied/ Not complied|Remarks |
|1 |Output power: |5W | | |
|2 |Input frequency: |950-1550 MHz | | |
|3 |Output frequency |6.725-7.025 GHz | | |
|4 |Input interface |F type, Female | | |
|5 |Output interface |Waveguide – CPR-137 G | | |
|6 |Max. Input power without damage: |10 dBm | | |
|7 |Gain slope: |1.0dB/36MHz | | |
|8 |AC input range: |220V +/- 15% (47-53Hz) | | |
|9 | | | | |
|10 |Temperature: |-20 to +55deg Centigrade or better | | |
3. Doctor End/Patient End PC:
|Sr. No. |PARAMETER |SPECIFICATIONS |Compliance (YES/NO/Noted) |Remarks |
|1 |PC |Standard make | | |
|1.1 |Processor |Intel Core I5 | | |
|1.2 |Chipset |Intel® HD Graphics | | |
|1.3 |Memory |4 GB DDR3 or better | | |
|1.4 |Hard Disk Drive |1 X 500GB HDD 7200 RPM SATA | | |
|1.5 |PCI Slots |1 X PCIe X 16 or better | | |
|1.6 |Ports |1 USB 2.0 or better, 1 X RJ-45 | | |
| | |(100/1G), provision for audio out, | | |
| | |mic in, and for Keyboard and mouse | | |
|1.7 |Power supply |For operations on Indian standard | | |
| | |power supply condition. | | |
|1.8 |Keyboard |Standard Keyboard | | |
|1.9 |Mouse |Optical Scroll Mouse | | |
|1.10 |Computer Monitor |23" LED Monitor or better | | |
|2 |Software |Operating System: Microsoft Windows| | |
| | |10 Professional 64 bit or higher. | | |
|3 |Power |230 V ± 10%, 50Hz +/- 5% AC | | |
|Sr. No. |Description |Specification |Compliance (Yes/No) |Remarks |
| | | | |(If any) |
|1 |IFL Cables sets |RG-6 with Connectors & minimum 30 meters’| | |
| | |cable length | | |
4. Wired Microphone with Phantom Power supply unit
|Sr. No. |Description |specifications |Compliance (Yes/No) |Remarks |
| | | | |(If any) |
|1 |Transducer type |Condenser | | |
|2 |Polar pattern | Super-Cardioid or better | | |
|3 |Frequency response |50Hz to 15 KHz | | |
|4 |Sensitivity |≥3mV/pa or -44dBV/pa | | |
|5 |Output impedance |50 to 200 Ohms | | |
|6 |Connector |3 Pin XLR | | |
|7 |ON/OFF Switch should be available | | |
|8 |Maximum Sound pressure level at 1 |140 dB to 150 dB | | |
| |kHz | | | |
|9 |Should provide following cables: | | |
| |Balanced XLR Male to XLR Female 10 meter | | |
| |XLR Female to 1/8”(3.5mm) mini plug -E.P connector - 2 meter (for connecting to | | |
| |PC Input). | | |
|10 |Compatible phantom power supply for Microphone with power adapter | | |
|10.1 |No. of Channel |Minimum 1 | | |
|10.2 |Input/output connector |XLR | | |
|10.3 |It should be able to interface with both line as well as mic | | |
5. Webcam
|Sr. No |Description |Specification |Compliance (Yes/No) |Remarks |
| | | | |(If any) |
|1 |Microphone Type |Built-in | | |
|2 |OS Compatibility |Windows 10 and higher versions | | |
|3 |Mounting Options |Mounting on monitor / LED TV | | |
|4 |Video Resolution |Should support HD | | |
|5 |Interface |USB 2.0 or better | | |
|6 |Accessories |All required accessories like mounting | | |
| | |clip, cables, etc. to be provided | | |
6. Online UPS
|Sr. No. |Description |Specification |Compliance (Yes/No) |Remarks |
| | | | |(If any) |
|1 |UPS Type |Online UPS | | |
|2 |Power rating |1KVA | | |
|3 |Efficiency |Minimum 85% | | |
|4 |Power Factor |Input: 0.9 or better | | |
| | |Output: 0.7 or better | | |
|5 |Standard indicators and alarms should be available | | |
|6 |AC Input Voltage, Frequency, phase |Single Phase 180V to 260V or better | | |
|7 |Output Wave Form & Voltage |Pure Sine wave 220/230/240 VAC | | |
|8 |Number of Batteries |3 Nos., 12 V, 65 AH, SMF Batteries | | |
7. Wi-Fi Router:
|Sr. No. |Description |Specification |Compliance (Yes/No) |Remarks |
| | | | |(If any) |
|1 |Device Interfaces |Four 10/100 LAN Ports | | |
| | |One 10/100 WAN Port | | |
|2 |Wireless Frequency Range |2.4 GHz to 2.497 GHz | | |
|3 |Antennas |Two fixed external Omni-directional antennas | | |
|4 |Standards |IEEE 802.11b / | | |
| | |IEEE 802.11g /IEEE 802.11n | | |
|5 |Speed |300 Mbps | | |
|6 |Functionality | | | |
|7 |Security |WEP 64/128-bit data encryption | | |
| | |WPS Wi-Fi Protected Access (WPA/WPA2) | | |
|8 |Advanced |Web setup wizard | | |
|9 |Status LEDs |Power Internet status | | |
| | |WLAN, LAN | | |
8. Headphone with mike
|Sr. No. |Description |Specification |Compliance (Yes/No) |Remarks |
| | | | |(If any) |
|1 |Frequency response: |Headset: 20 Hz to 20 KHz, Microphone: 100 Hz to | | |
| | |10 KHz | | |
|2 |Transducer type: |Condenser | | |
|3 |Polar pattern: |Super-Cardioid or better | | |
|4 |Sensitivity |: ≥3mV/pa or -40dBV/Pa ± 4 dB | | |
|5 |Compatible to Windows 10 or above OS. | | |
|6 |Interface |3.5 mm stereo or USB | | |
|7 |ON/OFF Switch should be available | | | |
9. Multi-functions black and white Laser Printer:
|Sr. No.|Specifications |Detail |Complied/ Not complied |Remarks |
|1 |Functions |Print, copy, scan | | |
|2 |Print quality |600 x 600 dpi or better | | |
|3 |Connectivity |Standard 1 Hi-Speed USB 2.0 | | |
|4 |Media sizes supported |A4, B5, A6, DL envelope, custom | | |
|5 |Minimum system requirements: |Should be compatible with Windows 10 | | |
| | |operating system. | | |
10. Ampli Speakers
|Sr. No. |Description |Specification |Compliance (Yes/No) |Remarks |
| | | | |(If any) |
|1 |Speaker frequency range: |180 Hz to 20 KHz | | |
|2 |Output Power : |2 x 10 W | | |
|3 |Number of speakers: |2 | | |
|4 |interface |3.5 mm stereo | | |
|5 |ON/OFF Switch should be available | | |
|6 |Bass, terrible and volume control should be available | | |
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- another word for developed for resume
- synonym for responsible for on resume
- write my essay for me for free
- saving for retirement for dummies
- synonym for passion for work
- synonym for products for sale
- topics for presentation for kids
- screensaver for christmas for desktop
- another word for responsible for on resume
- engine for cars for sale
- character letter for court for family member
- apply for grants for college